Loading...
23-104367Electrical City ofFederaIWay Community Development Dept. FILE Permit #:23-104367-00-EL 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PARKWOOD LANE SPACE 69 Project Address: 2611 S 288TH ST Parcel Number: 283920 0690 Project Description: Install New 200 Amp Feeder to Mobile Owner Applicant Contractor COVINGTON HOLDINGS LLC CHARLES HOCKINGCHARLES DEAN CHARLES DEAN ELECTRIC LLC 1115 108TH AVE NE SUITE 239 ELECTRIC LLC CHARLDE930LQ (7/1/25) BELLEVUE WA 98004 28107 20TH AVE S 28107 20TH AVE S FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 Additional Permit Information Is this an.Online or O.T.C. application? .................. Yes Electrical Fixtures New Service: Residential PERMIT EXPIRES Sunday, 25 February, 2024 Permit Issued on Tuesday, August 29, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of OWMIPderal Way. Owner or agent: asto CITY 6r Federal Way THIS C-ARD IS TO REAL-I-N ON -SITE Construction Inspection Record INSPECTION REQUESTS: (2::1) 835-3050 Scheduled inspections ma-; be .`ailed if this crud is not on -site. DO \ OT LO7E TSI.S CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom), Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about asr of the inspections er the inspection sequence. On -going inspections are logged on the back of this cud. ELECTRICAL Q LTFER Ground (4295) 0 Ditch corer (4030) ❑ SlablConcrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date 0 Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) A, arse i Approved Approved By Date By Date j By Date Feeders/Sub-panels (4045) Q Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved Bv Date By Date By Date El Final - Electrical (4055) By Approved Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) 0 Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date Bs- Date PLUMBING ❑ Plumbing Groundwork (4190) 2❑ Rough Plumbing (4230) Q Final - Plumbing (4075) Approved to co,.Tr Approved Approved By Date By Date By Date