Loading...
23-104212City of Federal Way FILE Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: HARRISON Project Address: 3420 SW 340TH ST Project Description: ac add on Mechanical Permit #:23-104212-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 536020 0046 Owner Applicant Contractor ROBERT HARRISON TAYLER MANNINGPACIFIC HEATING & PACIFIC AIR SYSTEMS (GENERAL) 3420 SW 340TH ST COOLING PACIFAS093KA (9/8/25) FEDERAL WAY WA 98023 8607 DURANGO ST SW SUITE A 8607 DURANGO ST SW TACOMA WA 98499 TACOMA WA 98499 Additional Permit Information Mechanical Work Valuation?. 14762 Is this an Online or O.T.C. application? .................. Yes Mechanical Fixtures Air Conditioners - Stand Alon< PERMIT EXPIRES Wednesday, 14 February, 2024 Permit Issued on Friday, August 18, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of as i to a d t e i of Federal Way. Owe g Owner or agent: U N Date: V1,1A 1 CITY 0* Federal Way THIS CARD IS TO REAL-I-N O\-SITE Construction Inspection Record IISPEC•TION REQUESTS: (2153) 535-30-0 Scheduled inspections nta.; be £tiled i£this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedrtle inspections as appropriate. Work must not be co-vered until it is approved. Check with yott_r inspector if you are unsure about aw, of the inspections or the inspection sequence. On -going insWctions are logged on the back of this cud. ELECTRICAL ❑t By L`FER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to phce concrete Date By Pool Bonding (4195) Approved Date ❑ Bt Temporary Power (4275) Approved Date Q By Service (4235) Approved Date ❑ By Rough Electrical (4225) ?. E: pry cd Date By Ceiling Cover (4020) Approved Date ❑ Feeders/Sub panels (4045) Approved By Date Final - Electrical (4055) Approved By Date MECHANICAL 0 By Mechanical Rough -in (41655) Approved Date ❑ By Gas Piping (4125) Approved to release test Date ❑ By Final -'Mechanical (4065) Approved k#) Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date B-N• Date