23-104212City of Federal Way
FILE
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: HARRISON
Project Address: 3420 SW 340TH ST
Project Description: ac add on
Mechanical
Permit #:23-104212-00-ME
Inspection Request Line: (253) 835-3050
Parcel Number: 536020 0046
Owner
Applicant
Contractor
ROBERT HARRISON
TAYLER MANNINGPACIFIC HEATING &
PACIFIC AIR SYSTEMS (GENERAL)
3420 SW 340TH ST
COOLING
PACIFAS093KA (9/8/25)
FEDERAL WAY WA 98023
8607 DURANGO ST SW SUITE A
8607 DURANGO ST SW
TACOMA WA 98499
TACOMA WA 98499
Additional Permit Information
Mechanical Work Valuation?. 14762 Is this an Online or O.T.C. application? .................. Yes
Mechanical Fixtures
Air Conditioners - Stand Alon<
PERMIT EXPIRES Wednesday, 14 February, 2024
Permit Issued on Friday, August 18, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
as i to a d t e i of Federal Way.
Owe g Owner or agent: U N Date:
V1,1A 1
CITY 0*
Federal Way
THIS CARD IS TO REAL-I-N O\-SITE
Construction Inspection Record
IISPEC•TION REQUESTS: (2153) 535-30-0
Scheduled inspections nta.; be £tiled i£this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedrtle inspections as appropriate. Work must not be co-vered until it is approved. Check with yott_r inspector if
you are unsure about aw, of the inspections or the inspection sequence. On -going insWctions are logged on the back of this cud.
ELECTRICAL
❑t
By
L`FER Ground (4295)
Approved
Date
❑
By
Ditch cover (4030)
Approved
Date
❑
By
Slab/Concrete Floor (4255)
Approved to phce concrete
Date
By
Pool Bonding (4195)
Approved
Date
❑
Bt
Temporary Power (4275)
Approved
Date
Q
By
Service (4235)
Approved
Date
❑
By
Rough Electrical (4225)
?. E: pry cd
Date
By
Ceiling Cover (4020)
Approved
Date
❑ Feeders/Sub panels (4045)
Approved
By Date
Final - Electrical (4055)
Approved
By Date
MECHANICAL
0
By
Mechanical Rough -in (41655)
Approved
Date
❑
By
Gas Piping (4125)
Approved to release test
Date
❑
By
Final -'Mechanical (4065)
Approved
k#) Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
B-N•
Date