23-104334City of Federal Way
Community Development Dept.
FILE
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: RIVERSTONE APARTMENTS, Unit 144
Project Address: 27314 24TH AVE S
Project Description: Remove/replace electric water heater
Plumbing
Permit #:23-104334-00-PL
Inspection Request Line: (253) 835-3050
Parcel Number: 720480 0004
Owner
Applicant
Contractor
KC HOUSING AUTHORITY
JASON HANLEYBROWNFAST WATER
FAST WATER HEATER CO (PLUMBING)
600 ANDOVER PARK W
HEATER COMPANY
FASTWWH79901 (10/l/23)
TUKWILA WA
11715 NORTH CREEK PKWY S SUITE C-106
1715 NORTH CREEK PKWY S SUITE C-10,
98188
BOTHELL WA 98011
BOTHELL WA 98011
Water Heaters 1
PERMIT EXPIRES Wednesday, 21 February, 2024
Permit Issued on Friday, August 25, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
_ N
ton 1n,ELth,1 • ' Hof Federal Way. .
Owner or agent:
Date:
CITY or
Federal Way
THIS C AD IS TO RE_lI_JI1 ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (2.3) 83-5-3050
Scheduled inspections i a-r be failed if this card is not on -site- DO NOT LOSE TUS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please sche hlle Inspections :is appropriate Fork amt not be covered Until it is approved. Check with voutr irlspectof if
you are unsure about an,of the inspections or the inspection sequence. On -going inspection; are logged on the back of this card -
ELECTRICAL
❑
UFER Ground (4295)
❑f
Ditch corer (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
App:n ed
Approved
Approved
By
Date
Bv
Date
By
Date
❑
Feeders/Sub-panels (4045)
0
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
B-v
Date
By
Date
By
Date
Ell
Final - Electrical (40-55)
Approved
By
Date
MECHANICAL
❑
Mechanical Rough -in (416-5)
❑
Gas Piping (4125)
0
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
B-sr
Date
PLUMBING
Q Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075)
Approved to cover Approved Approved I
By Date By _ Date B3 1 Date lI