Loading...
23-104362Electrical City of Federal Way Permit #:23-104362-00-EL Community Development Dept. FILL, 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: HOFMAN Project Address: 2740 SW 34.7TH PL Parcel Number: 502946 0370 Project Description: gas furnace replacement / new tstat Owner Applicant Contractor ANDREW K HOFMAN TAYLER MANNINGPACIFIC HEATING & PACIFIC HEATING & COOLING 2740 SW 347TH PL COOLING (ELECTRICAL) FEDERAL WAY WA 8607 DURANGO ST SW SUITE A PACIFHC798DR (4/12/25) 98023 TACOMA WA 98499 8607 DURANGO ST SW SUITE A TACOMA WA 98023 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Residential 1 Thermostat I PERMIT EXPIRES Saturday, 24 February, 2024 Permit Issued on Monday, Aukust 28, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of i n a d..of Federal Way. Owner or agent: �� 1 he Date: _�k CITY of Federal Way THIS CARD IS TO RE1L-kI1 ON -SITE Construction Inspection Record I\SPECTIO-N REQUESTS: (253) 335-3050 Scheduled inspections rna-v be failed if this card is not ou-sire. DO -NOT LOSE TBZS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottoui) Please schedule inspections as appropriate. Work mtrst not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL 0 B3- IIFER Ground (4295) Approved Date 0 By Ditch corer (4030) Approved Date ❑ B-v Slab/Concrete Floor (4255) Approved to place concrete Date 0 Pool Bonding (4195) Q Temporary Power (4275) Q Set -vice (4235) Approved Approved Approved By Date By Date By Date Feeders/Sub-panels (4045) Q Rough Electrical (4225) Q Ceiling Corer (4020) Approved Approved Approved By Date BS Date Bj Date Fl Final - Electrical (4055) By Approved X�e� Date MECHANICAL 0 Mechanical Rough -in (4165) ❑ Gas Piping (4125) Q Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING Q Phtmbing Groundwork (4190) ❑ Rough Plumbing (4230) Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date