Loading...
23-104361_ Mechanical City of Federal Way } Permit #:23-104361-00-ME Community Development Dept F i f 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: HOFMAN Project Address: 2740 SW 347TH PL Parcel Number: 502946 0370 Project Description: gas furnace replacement Owner Applicant Contractor ANDREW K HOFMAN TAYLER MANNINGPACIFIC HEATING & PACIFIC AIR SYSTEMS (GENERAL) 2740 SW 347TH PL COOLING PACIFAS093KA (9/8/25) FEDERAL WAY WA 8607 DURANGO ST SW SUITE A 8607 DURANGO ST SW 98023 TACOMA WA 98499 TACOMA WA 98499 Additional Permit Information Mechanical Work Valuation?.. ......... ---- ...... ....... 8840 Is this an Online or O.T.C. application?.................. Yes Furnaces Mechanical Fixtures PERMIT EXPIRES Saturday, 24 February, 2024 Permit Issued on Monday, August 28, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ON'LINt iFederal Way. Owner or agent: Date F�� c r7.r or A,� Federal Way THIS C_1RD IS TO REAL-I1 O\-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Scheduled tnspecrrons nm-: be failed if this cud is not on -site. DO NOT LOSE THIS CARD. L+tspections are Iisted as ciose to sequential order as possible (read !eft to right. ran to 17oitorlt). Please scl:ecfLsle inspections as appropriate. Work mucst not be covered until it is approved. Check w.xith voLtr inspectof if �Vu are umme abour an;,, of the inspections or the inspection ;egztcnce. �1-3oing inspections are logged on the back of this card. ELECTRICAL ❑ By L`FER Ground (4295) Approved Date Q By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date ❑ Pool Bonding (4195) 0 Temporary Power (4275) ❑ Service (4235) Appro ed Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved By Date BY Date By Date E o Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) 0 -Final - Mechanical (4065) Approved Approved to release test// Approved 00'Date B}' Date B� Date B� 7,1 _A PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing 4230) Final - Plumbing (4075) Approved to corer Approved Approved By Date By Date By Date