Loading...
23-104339City of Federal Way Commmity Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Building - Single Family Permit #:23-104339-00-SF Inspection Request Line: (253) 835-30.50 Project Name: WAI Project Address: 421 SW 352ND ST Parcel Number: 066231 0500 Project Description: Remove cedar shake roofing and install 1/2" CDX plywood and composition shingle roofing system. Owner Applicant Contractor Lender DOREEN WAI PETE GIEREHORIZON ROOFING HORIZON ROOFING LLC 421 SW 352ND ST LLC PO BOX 24449 FEDERAL WAY WA 98023 PO BOX 24449 FEDERAL WAY WA 98093 FEDERAL WAY WA 98093 Includes Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) Census Category: 555 - Non-structural roofing permits #1 #2 #3 44 Additional Permit Information Mechanical to be Included? ..................................... No Is this an Online or O.T.C. application?.................. Yes Plumbing to be Included? ................ No Total Valuation: 14,400.00 No Fixtures Associated With This Permit H PERMIT EXPIRES Tuesday, 20 February, 2024 Permit Issued on Thursday, August 24, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City. of Federal Way. Owner or agent: Date: ram. A�l CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE, Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 23 104339 00 Address: 421 SW 352ND ST Project: EDDIE WAI FEDERAL WAY WA 98023-8129 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Roof Sheathing (4220) Q Final - Building (4050) Approved to install roofin Approved � By " Date % By Date Rough Electrical Final Electrical Right of Way Approved Approved Approved I3y Date [IV Date By Date DECEIVED 4%1� CITY OF 0:l tt- AUG 2 3 2023 PERMIT APPLICATION PER Federal Way MIT CENTER + 33325 81�' Avenue South +Federal Way, WA 98003-6325 253-835-2607 + FAX 253-835-2609 + permitcenter rrcityoffedernhva},.com CITY OF FEDERAL WAY COMMUNffY DEVELOPMENT PERMIT NUMBER a — -01 SITE ADDRESS 421 SW 352nd St, Federal Way, WA 98023 PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL N $ 14,400.00 — — — — - — — — TYPE OF PERMIT BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT PROJECT DESCRIPTION Detailed description of uurk to be included on this permit only PROPERTY OWNER TARGET DATE �. SUITEIUNIT N Wai Remove cedar shakes and install 1/2" CDX plywood and composition shingles NAME Doreen Wai MAILING ADDRESS Same CITY STATE I ZIP NAME Horizon Rootinq LLC MAILING ADDRESS CONTRACTOR PU Box 24449 Federal Wav WA STATE CONTRACTOR'S LICENSE N HORIZRL867L_7 NAME same APPLICANT MAILING ADDRESS CITY — — PROJECT CONTACT (The individual to receive and respond to all correspondence concerning this application) PROJECT FINANCING When ualiic is $5,000 or more (RCIV 19.27.095) STATE ZIP WA 98093 EXPIRATION DATE 06/27/24 i STATE I ZIP PRIMARY PHONE E-MAIL PHONE E-MAIL FAX UBI N PRIMARY PHONE E-MAIL FAX Pete PRIMARY PHONE 206-234-2481 Giere MAILING ADDRESS E-MAIL PO Box 24449 CITY STATE ZIP FAX Federal Wav WA9� NAME ❑ OWNER -FINANCED MAILING ADDRESS, CITY, STATE, ZIP PHONE I certify under penalty of parjury that I am the property owner or authorized agent of the property owner. I certify that to the hest of my knowledge, the inform atic n submitted in support of this permit application is true and correct. I certify that I wftl comply with all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibUlty for compliance with total, state, or federal taws regulating construction or environmental laws. 1 further agree to hold harmless the City of Federal Way as to any claim [including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against eha city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of this application. SIGNATURE: DATE 08/23/23 PRINTNAME: Pete Giere Page I of?