Loading...
22-104641City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MEMORIAL STADIUM - BLDG 9 TRASH ENCLOSURE Project Address: 1300 S 308TH ST Project Description: BLUEBEAM - Construction of a trash enclosure. Building - Commercial Permit #:22-104641-00-CO Inspection Request Line: (253) 835-3050 Parcel Number: 082104 9001 Owner Applican# Contractor Lender FEDERAL WAY PUBLIC SCHOOLS KRIS STAMONMCGRANAHAN B N BUILDERS OWNER IS LENDER 33330 8TH AVE S ARCHITECTS 2601 4TH AVE SUITE 350 FEDERAL WAY WA 98003 2111 PACIFIC AVE SUITE 100 SEATTLE WA 98121 TACOMA WA 98402 Census Category: 328 - New Other Non -Residential Building Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) Additional Permit Information New / Additional Sq. Feet - 1 st Floor ..................... 318 New / Additional Sq. Feet - 3rd Floor ..................... 0 New / Additional Sq. Feet - Deck ........................... 0 Mechanical to be Included? ..................................... No Mechanical Work Valuation? .................................. 0 New / Additional Sq. Feet - Other ........................... 0 Permit for Building Shell Only? .............................. No New / Additional Sq. Feet - Total ........................... 318 Zoning Designation .................................................. BC Total Valuation: 10,000.00 New / Additional Sq. Feet - 2nd Floor .................... 0 New / Additional Sq. Feet - Basement .................... 0 New / Additional Sq. Feet - Garage ........................ 0 Plumbing Work Valuation? ..................................... 0 Number of Stories ................................................... I Is this an Online or O.T.C. application? .................. No Plumbing to be Included? ........................................ No Comprehensive Plan Designation ........................... Community Business No Pbdw= Ans"a"Ttft PWRM N CONDITIONS: Public Works Conditions: 1. Permit 22-102123-UP shows trash enclosure being connected to Sanitary Sewer must follow that proposed plan. 2. All related public works stormwater proposed .work will be under permit 22-104213-00-CO. 3. Must follow design by Registered Architect Kristopher J. Stamos on 9-2-2022. V N' Aa\ PERMIT EXPIRES Monday, 14 August, 2023 Permit Issued on Wednesday, February 15, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of VVash}iVon and.the City of Federal Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON -SITE CITY OF � Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 104641 00 Address: 1300 S 308TH ST Project: FEDERAL WAY PUBLIC SCHOOLS FEDERAL WAY WA 98003-4903 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 1❑ Footings/Setback (4110) 0 Foundation Wall (4115) Q Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfill Date �I1 1/3 By Date By Date By 0 Re -steel (4215) 0 Slab/Concrete Floor (4255) © Underfloor Framing (4285) Approved to place concrete or grout Approved to place concrete Approved to sheath floor By Date By Date By Date Q Floor Sheathing (4105) Shear Walls (4245) 0 Roof Sheathing (4220) Approved to install flooring Approved to install siding Approved to install roofing By Date By Date By Date Fire/Draft Stops (4095) duling a Framing inspection; Framing (4120) Approved mbing & Mechanical Rough -in EFire/DraftStop inspections must be signed - Approved to insulate By Date approved. IBC 109.3.4 By Date 12 Insulation (4150) 13 Gypsum Wallboard Nailing (4130) 14 Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud & tape Approved to drop tile By Date By Date By Date 5 Final - S K F & R (4060) 16 Final - Planning Final - Public Works (4080) Approved Approved Approved By Date By Date By Date 1a Final - Building (4050) Approved By M Date to fj Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date