23-103970City of Federal Way
FILE
Community Development Dept
33325 Sth Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) B35-2609
Project Name: TRENT-ABRAM
Project Address: 30825 36TH CT SW
Project Description: Kitchen Remodel
Electrical
Permit #:23-103970-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 058755 0390
Owner
Applicant
Contractor
SUSAN TRENT-ABRAM
ANDREY STANTSIYERANDRATHON
ANDRATHON ELECTRICAL LLC
30825 36TH CT SW
ELECTRICAL LLC
ANDRAEL816DN (3/15/25)
FEDERAL WAY WA 98023
9508 IOTH AVE CT E
9508 IOTH AVENUE CT E
TACOMA WA 98445
TACOMA WA 98445
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Circuits - Residential
Electrical Fixtures
3
PERMIT EXPIRES Tuesday, 30 January, 2024
Permit Issued on Thursday, August 3, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washin ton and the City of Federal Way.
Owner or agent: ONI INE Date:
r1'/ '
CITY or Y
Federal Way
THIS CARD IS TO REALU s ON -SITE
Construction Inspection Record
I\SPEC'TIO REQUESTS: (253) 33-5-3050
Scheduled inspections ma-; be failed if this card is not on -site- DO NOT LOSE TffiS CARD_ Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work urzt not be covered until it is approved. Check vN ith your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
0
tiFER Ground (4295)
❑
Ditch cover (4030)
S1ablConcrete Floor (4255)
Approved
Approved
Approved to place. concrete
By
Date
Bi
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
0
Service (4235)
Approved
Approved
Approved
By
Date
By,
Date
BS
Date
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
pproved
Approved
By
Date
By
Date
By
Date
Final - Electrical (405+)
Approved
By
Date
1Z
MECHANICAL
Q
Mechanical Rough -in (4163)
❑
Gas Piping (4125)
❑
Final -Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
0
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date