Loading...
23-104659City of Federal Way Community Development Dept 33325 8th Ave S Federal Way. WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: CHEN/HY Project Address: 2732 SW 312TH PL Project Description: repair meter Owner HUICHEN 2732 SW 312TH PL FEDERAL WAY WA 98023 Electrical Permit #:23-104659-00-EL 4 1W +- Inspection Request Line: (253) 835-3050 Parcel Number: 150320 0100 Applicant Contractor TROY EDWARDStroys electric TROY'S ELECTRIC 2308 S L ST TROYSE*935JC (6/26/25) TACOMA WA 98405 2308 S "L" ST, TACOMA WA 98405 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Mast or Meter Repair (Residen 1 PERMIT EXPIRES Wednesday, 13 March, 2024 Permit Issued on Friday, September 15, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date. CITY W Federal Way THIS C -ARD IS TO REALU's ON -SITE Construction Inspection Record INSPECTION REQUESTS: (213) 835-3040 Scheduled inspections aiay be Failed if t1hi card is :oi on -sire. ISO NOT LOSE T111.5 CARD. Insptctiorts Ise IWO as close to sequxmtial order aspossible (read :eft to right. too to bottoru). ?le-.zse schedule inTecuons as appreprLtte Rork nimi not be co : ered ttniii tt is approc ed. Check with v our inspe:ror if b'011 are unsure a5our any of the irlipections car the iD.-, Cition sequence_ On -going inspec Was are togged on the back of dEs card. ELECTRICAL ❑ L-FER Ground (4295) ❑ Ditch corer 4030 ( ) ❑ Slab/Concrete Floor (2554_��) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ® Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) By �Approved Date MECHANICAL ❑ Jechanical Rough -in (4165) ❑ Gas Piping (4125) 0 Final -'Mechanical (4065) Approved Approved to release test Approved By Date By Date Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑� Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date BY Date