23-104659City of Federal Way
Community Development Dept
33325 8th Ave S
Federal Way. WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: CHEN/HY
Project Address: 2732 SW 312TH PL
Project Description: repair meter
Owner
HUICHEN
2732 SW 312TH PL
FEDERAL WAY WA 98023
Electrical
Permit #:23-104659-00-EL
4
1W +- Inspection Request Line: (253) 835-3050
Parcel Number: 150320 0100
Applicant
Contractor
TROY EDWARDStroys electric
TROY'S ELECTRIC
2308 S L ST
TROYSE*935JC (6/26/25)
TACOMA WA 98405
2308 S "L" ST,
TACOMA WA 98405
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Mast or Meter Repair (Residen 1
PERMIT EXPIRES Wednesday, 13 March, 2024
Permit Issued on Friday, September 15, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date.
CITY W
Federal Way
THIS C -ARD IS TO REALU's ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (213) 835-3040
Scheduled inspections aiay be Failed if t1hi card is :oi on -sire. ISO NOT LOSE T111.5 CARD. Insptctiorts Ise IWO as close to sequxmtial order aspossible
(read :eft to right. too to bottoru). ?le-.zse schedule inTecuons as appreprLtte Rork nimi not be co : ered ttniii tt is approc ed. Check with v our inspe:ror if
b'011 are unsure a5our any of the irlipections car the iD.-, Cition sequence_ On -going inspec Was are togged on the back of dEs card.
ELECTRICAL
❑ L-FER Ground (4295) ❑ Ditch corer 4030
( ) ❑ Slab/Concrete Floor (2554_��)
Approved Approved Approved to place concrete
By Date By Date By Date
❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235)
Approved Approved Approved
By Date By Date By Date
Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ® Ceiling Cover (4020)
Approved Approved Approved
By Date By Date By Date
❑ Final - Electrical (4055)
By �Approved
Date
MECHANICAL
❑ Jechanical Rough -in (4165) ❑ Gas Piping (4125) 0 Final -'Mechanical (4065)
Approved Approved to release test Approved
By Date By Date Date
PLUMBING
❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑� Final - Plumbing (4075)
Approved to cover Approved Approved
By Date By Date BY Date