23-104493Electrical
City yr evelo l ent - - Permit #:23-104493-00-EL
Community Development Dept
333W 8th Ave 5
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609 FILE.
Project Name: THAUNGO
Project Address: 183 SW 358TH ST Parcel Number: 724290 0440
Project Description: HVAC-Install AC Add on
Owner
Applicant
Contractor
MICHAEL THAI
CRYSTAL WALTZALLRED HEATING
ALLRED HEATING COOLING ELECTRIC
183 SW 358TH ST
COOLING ELECTRIC LLC
LLC (GENERAL)
FEDERAL WAY WA 98023
505 "F" ST SE
ALLREHC899N3 (8/23/25)
AUBURN WA 98002
1020 S 344TH ST SUITE 205
FEDERAL WAY WA 98003
Additional Permit Information
Is this an Online or O.T.C. application? ......... --.— Yes
Electrical Fixtures d k
Circuits - Residential 2
PERMIT EXPIRES Monday, 4 March, 2024
Permit Issued on Wednesday, September 6, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: n 1\ I I I IN Date:
r'114 W
CITY CW
Federal Way
THIS CARD IS TO REALAI1 ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (2-53) 335-30-50
Scheduled inspections ni be failed if this card is not on -site. DO NOT LOSE MIS C -ARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. 'Fork- must not be covered until it is approved. Clieck - ith your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspection; are logged on the bacl; of this card.
ELECTRICAL
❑
L-FER Ground (4295)
❑
Ditch cover (4030)
0
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporarcv Power (4275)
Q
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
Q
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Final - Electrical (4055)
Approved
By
C�
/ Date
MECHANICAL
❑1
]Iechanical Rough -in (4165)
❑
Gas Piping (4125)
Q
Final -Mechanical (4065)
Approved
Approved to rekase test
Approved
By
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
El
Final - Plumbing (4075)
Approved to cover
Approt ed
Approved
By
Date
By
Date
BS•