Loading...
23-1036991 City of Federal Way Community Development Dept. FILE 33325 8th Ave S Federal Way, WA 98003 lPh: (253) 835-2607 Fax: (253) 835-2609 Project Name: FEDERAL WAY PREMIER STORAGE Project Address: 35200 PACIFIC HWY S Project Description: EMERGENCY PANEL REPLACEMENT Electrical Permit #:23-103699-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 292104 9048 Owner Applicant Contractor CPSG SELF STORAGE FACILITY XII LLC AMBER PARRISHSmith Fire Systems, Inc. SMITH FIRE SYSTEMS INC 1001 4TH AVE SUITE 3200 1106 54TH AVE E 1106 54T (ELECTRICAL) SEATTLE WA 98104 FIFE WA 98424 SMITHFS861RS (12/10/24) 1106 54TH AVE E TACOMA WA 98424 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Low Voltage - Fire Alarm (Co 1 PERMIT EXPIRES Monday, 15 January, 2024 Permit Issued on Wednesday, July 19, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washinton and the City of Federal Way, Owner or agent: K Date: l WOL/ -4k CITY or Federal Way THIS CARD IS TO REAL -UN O\-SITE Construction Inspection Record INSPECTIO REQUESTS: (253) $35-3050 Scheduled inspections tuaT: be failed if this crud is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom)_ Please schedule inspections as appropriate. Work must not be co,: eyed until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL By LTFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved BV Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved BV Date By Date By Date E 0 Final - Electrical (4055) By ZZApproved Date r '�05�'�✓ MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) Q Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cotter Approved Approved By Date By Date By Date