Loading...
23-104686City of Federal Way Community Development Dept. FILr 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BAROUMES Project Address: 409 SW 352ND ST Project Description: ac replacement / new tstat / new gfci outlet Electrical Permit #:23-104686-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 066231 0520 Owner Applicant Contractor ALEXANDER BAROUMES TAYLER MANNINGPACIFIC HEATING & PACIFIC HEATING & COOLING 409 SW 352ND ST COOLING (ELECTRICAL) FEDERAL WAY WA 98023-8129 8607 DURANGO ST SW SUITE A PACIFHC798DR (4/12/25) TACOMA WA 98499 8607 DURANGO ST SW SUITE A TACOMA WA 98023 Additional Permit information Is this an Online or O.T.C. application? .................. Yes Eketriesl Fixtures Circuits - Residential 2 Thermostat 1 PERMIT EXPIRES Sunday, 17 March, 2024 Permit Issued on Tuesday, September 19, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use,will-be in accordance with the laws, rules and regulations of the State of h w fi to, a It "oo"Federal Way. Owner or agent: Date: CITY or - Federal Way THIS CkRD IS TO REMAIN O\-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-30-50 Scheduled inspections ma-; be failed if this card is not on -site. DO NOT LOSE THIS C RD, hispectioas are listed as close to sequential order as possible i read le8 to aglit. top to bottom). Please schedule inspections as appropriate Rork mwt not be corBred until it is approved. Check ,sith otu inspector if y-ou -.s o are unsure about an: of the nslctior the inspction sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ L-FER Ground (4295) ❑ Ditch corer (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date B-v Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Seri -ice (4235) Approved ApprovYd Approved By Date Be Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved Bi- Date By Date By Date ❑ Final - Electrical (4055) By Approved j� Date /V MECHANICAL u Mechanical Rough -in (4165) ❑ Gas Piping (4125) 0 Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date