23-104686City of Federal Way
Community Development Dept.
FILr
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: BAROUMES
Project Address: 409 SW 352ND ST
Project Description: ac replacement / new tstat / new gfci outlet
Electrical
Permit #:23-104686-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 066231 0520
Owner
Applicant
Contractor
ALEXANDER BAROUMES
TAYLER MANNINGPACIFIC HEATING &
PACIFIC HEATING & COOLING
409 SW 352ND ST
COOLING
(ELECTRICAL)
FEDERAL WAY WA 98023-8129
8607 DURANGO ST SW SUITE A
PACIFHC798DR (4/12/25)
TACOMA WA 98499
8607 DURANGO ST SW SUITE A
TACOMA WA 98023
Additional Permit information
Is this an Online or O.T.C. application? .................. Yes
Eketriesl Fixtures
Circuits - Residential 2 Thermostat 1
PERMIT EXPIRES Sunday, 17 March, 2024
Permit Issued on Tuesday, September 19, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use,will-be in accordance with the laws, rules and regulations of the State of
h w fi to, a It "oo"Federal Way.
Owner or agent: Date:
CITY or -
Federal Way
THIS CkRD IS TO REMAIN O\-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-30-50
Scheduled inspections ma-; be failed if this card is not on -site. DO NOT LOSE THIS C RD, hispectioas are listed as close to sequential order as possible
i read le8 to aglit. top to bottom). Please schedule inspections as appropriate Rork mwt not be corBred until it is approved. Check ,sith otu inspector if
y-ou -.s o are unsure about an: of the nslctior the inspction sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
L-FER Ground (4295)
❑
Ditch corer (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
B-v
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Seri -ice (4235)
Approved
ApprovYd
Approved
By
Date
Be
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
Bi-
Date
By
Date
By
Date
❑
Final - Electrical (4055)
By
Approved
j� Date /V
MECHANICAL
u
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
0
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
0
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
0
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date