23-104685City of Federal Way
Community Development Dept.
'
F
33325 8th Ave S
'
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: BAROUMES
Project Address: 409 SW 352ND ST
Project Description: ac replacement
Mechanical
Permit #:23-104685-00-ME
Inspection Request Line: (253) 835-3050
Parcel Number: 066231 0520
Owner
Applicant
Contractor
ALEXANDER BAROUMES
TAYLER MANNINGPACIFIC HEATING &
PACIFIC AIR SYSTEMS (GENERAL)
409 SW 352ND ST
COOLING
PACIFAS093KA (9/8/25)
FEDERAL WAY WA 98023-8129
8607 DURANGO ST SW SUITE A
8607 DURANGO ST SW
TACOMA WA 98499
TACOMA WA 98499
Additional Permit Information
Mechanical Work Valuation? ....... ........ I ................ 9276 Is this an Online or O.T.C. application?.................. Yes
W Mechanical Fixtures
Air Conditioners - Stand Alonf 1
PERMIT EXPIRES Sunday, 17 March, 2024
Permit Issued on Tuesday, September 19, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington land the City of Federal Way.
Owner or agent: Date
'Jt�-IOAI
A.
cnr or
Federal Way
THIS CARD IS TO RE]I-LIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) S35-30_0
Scheduled Inspections nix..- be fa led if this card is not on -site- DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(.read left to riahr. top to bottom). Please schedule inspections as appropriate. Work insist not be co.:ered until it is approved. Check ;With your inspector if
you are unsure about anv of the inspection or the inspection sequence. inn-?oln2 Inspect?ons are lowed on the back of this card.
ELECTRICAL
0
By
L-FER Ground (42955)
Approved
Date
❑
By
Ditch cover (4030)
Approved
Date
❑
B-
Slab/Concrete Floor (4255)
Approved to place concrete
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4233)
Approved
Approved
Approved
By
Date
B`-
Date
BS-
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Corer (4020)
Approved
Approved
:approved
By
Date
By
Date
By
Date
El
Final - Electrical (4055)
:approved
By
Date
MECHANICAL
❑
❑ ❑
Mechanical Rough -in (4165)
Gas Piping (4125)
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date /i0'�
PLUMBING
0
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date