Loading...
23-104685City of Federal Way Community Development Dept. ' F 33325 8th Ave S ' Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BAROUMES Project Address: 409 SW 352ND ST Project Description: ac replacement Mechanical Permit #:23-104685-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 066231 0520 Owner Applicant Contractor ALEXANDER BAROUMES TAYLER MANNINGPACIFIC HEATING & PACIFIC AIR SYSTEMS (GENERAL) 409 SW 352ND ST COOLING PACIFAS093KA (9/8/25) FEDERAL WAY WA 98023-8129 8607 DURANGO ST SW SUITE A 8607 DURANGO ST SW TACOMA WA 98499 TACOMA WA 98499 Additional Permit Information Mechanical Work Valuation? ....... ........ I ................ 9276 Is this an Online or O.T.C. application?.................. Yes W Mechanical Fixtures Air Conditioners - Stand Alonf 1 PERMIT EXPIRES Sunday, 17 March, 2024 Permit Issued on Tuesday, September 19, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington land the City of Federal Way. Owner or agent: Date 'Jt�-IOAI A. cnr or Federal Way THIS CARD IS TO RE]I-LIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) S35-30_0 Scheduled Inspections nix..- be fa led if this card is not on -site- DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (.read left to riahr. top to bottom). Please schedule inspections as appropriate. Work insist not be co.:ered until it is approved. Check ;With your inspector if you are unsure about anv of the inspection or the inspection sequence. inn-?oln2 Inspect?ons are lowed on the back of this card. ELECTRICAL 0 By L-FER Ground (42955) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ B- Slab/Concrete Floor (4255) Approved to place concrete Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4233) Approved Approved Approved By Date B`- Date BS- Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved :approved By Date By Date By Date El Final - Electrical (4055) :approved By Date MECHANICAL ❑ ❑ ❑ Mechanical Rough -in (4165) Gas Piping (4125) Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date /i0'� PLUMBING 0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date