23-102201City of Federal Way
FILE
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: CARBON HEALTH
Project Address: 1750 S 320TH ST
Project Description: Installation of 27 LV cables
Electrical
Permit #:23-102201-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 762240 0015
Owner
Applicant
Contractor
MGP IX COMMONS FW LLC
JHALENE HARTELPrecision Electric Group
PRECISION ELECTRIC GROUP INC
425 CALIFORNIA ST FLOOR 10
15301 NE 90TH ST
PRECIEG969PH (10/9/24
SAN FRANCISCO CA 94104
REDMOND WA 98052
15323 NE 90TH ST
USA
REDMOND WA 98052
Additional Permit Information
Is this an Online or O.T.C. application? ................. Yes
Electrical Fixtures
Low Voltage - Other (Commel 27
PERMIT EXPIRES Saturday, 21 October, 2023
Permit Issued on Monday, April 24, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date.
_N�
CITY Of
Federal Way
THIS C'_1RD IS TO REALAYN O\-SITE
Construction Inspection Record
I\SPECTIO\ REQL-ESTS: (2_53) 335-3050
Scheduled inspections ma;: be failed if this card is not on -site. DO NOT LOSE THI$ CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about awr of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
By
UIER Ground (4295)
Approved
Date
❑
By
Ditch corer (4030)
Approved
Date
❑
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
0
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
Bv-
Date
Bv-
Date
By
Date
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approve
By
Date
By
Date
BS
Date/
I
Final - Electrical (4055)
ByDat/v�f%
Approved
4XI
MECHANICAL
Q
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to toter
Approved
Approved
By
Date
By
Date
By
Date