Loading...
23-104681Electrical City of Federal Way Community Development Dept 33325 Sth Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Permit #:23-104681-00-EL Inspection Request Line: (253) 835-3050 Project Name: CAMPUS POINTE PROFESSIONAL PARK - BUILDING H Project Address: 33507 9TH AVE S Project Description: 208V/100A Disconnect S/W Parcel Number: 132185 0080 Owner Applicant Contractor SUKJOO JAY LEE REX KWON LIGHTING AND POWER 33507 9TH AVE S #H 139 S 327 PL LIGHTP*834JC (5/19/25) FEDERAL WAY WA FEDERAL WAY WA 98003 139 S 327 PL 98003-6397 FEDERAL WAY WA 98003 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes No Fixtures Associated With This Permit 11 PERMIT EXPIRES Saturday, 16 March, 2024 Permit Issued on Monday, September 18, 2023 I hereby certify that the above informatioT'i is correct arm and the occupancy and the a will be in accordance ington and the C Owner or agent: t the construction on the above described property h the laws, rules and regulations of the State of of Federal Way. Date: ciir as Federal Way THIS C �D IS TO RE-AUUN O\-SITE Construction Inspection Record INSPECTION REQUESTS: (2-53) 835-3050 Scheduled inspections ma-,- be flsled if this card is not on -site. DO NOT LOSE THIS CARD. hispections are listed as close to sequential order as possible ('read ken to ri?ht. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check, with your uispector if VOu are unsure about am of the in-sk',ectio-as or the ins?ection ssequence. 0n-?oing inspections are lowed on the back oL this card. ELECTRICAL ❑ LFER Ground (4295) ❑ Ditch cover (4030) ❑ S1abiConcrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved Bz Date19 f MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final - -Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230} ❑i Final -Plumbing (4075) Approved to cover Approved Approved By Date Bc Date BIV Date