23-104681Electrical
City of Federal Way
Community Development Dept
33325 Sth Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Permit #:23-104681-00-EL
Inspection Request Line: (253) 835-3050
Project Name: CAMPUS POINTE PROFESSIONAL PARK - BUILDING H
Project Address: 33507 9TH AVE S
Project Description: 208V/100A Disconnect S/W
Parcel Number: 132185 0080
Owner
Applicant
Contractor
SUKJOO JAY LEE
REX KWON
LIGHTING AND POWER
33507 9TH AVE S #H
139 S 327 PL
LIGHTP*834JC (5/19/25)
FEDERAL WAY WA
FEDERAL WAY WA 98003
139 S 327 PL
98003-6397
FEDERAL WAY WA 98003
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
No Fixtures Associated With This Permit 11
PERMIT EXPIRES Saturday, 16 March, 2024
Permit Issued on Monday, September 18, 2023
I hereby certify that the above informatioT'i is correct arm
and the occupancy and the a will be in accordance
ington and the C
Owner or agent:
t the construction on the above described property
h the laws, rules and regulations of the State of
of Federal Way.
Date:
ciir as
Federal Way
THIS C �D IS TO RE-AUUN O\-SITE
Construction Inspection Record
INSPECTION REQUESTS: (2-53) 835-3050
Scheduled inspections ma-,- be flsled if this card is not on -site. DO NOT LOSE THIS CARD. hispections are listed as close to sequential order as possible
('read ken to ri?ht. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check, with your uispector if
VOu are unsure about am of the in-sk',ectio-as or the ins?ection ssequence. 0n-?oing inspections are lowed on the back oL this card.
ELECTRICAL
❑
LFER Ground (4295)
❑
Ditch cover (4030)
❑
S1abiConcrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Corer (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Final - Electrical (4055)
Approved
Bz
Date19 f
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - -Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230}
❑i
Final -Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
Bc
Date
BIV
Date