Loading...
98-100227 BUILDING DIVISION t ►o' _ 33530 First Way South EDEIZAi_ • Federal Way,WA 98003 V Il IVED (253)661-4000 _Fax(253)66I-4I29 _ crrY oFo Na* lICATI • 1 F ' ' B ► 4 ING PERMIT 98"Jaa 117 Bu PLEASE PRINT APPLICATION# '(J".,DJ( — a 3 41! 11Sc ,1,d ruf mi , fi �f , S Tenant(if known) V Lot# r or's Tax o• oggo42 Building Owner's Nam- A ress uzan,NF pIJ IaIDI u .0. Bob 28 ,i'7 City S •1T : S. e I4JA Zip 48118 one ( 4 ) 723-782(0 of ' EW i !.E +1AM1l-1' 2gSi ; cE ;r+ rrr 'JJ 'u gv .i N F,M h1E Oa& Ad•' "epO 2861 1 W411°<\14 City SEATT.E rate ►n/A Zip 98 one ot4( 2v • ' I_ 80 • ' v ► Other Ph 5AM,E 60-0B18 Com,,,,ppany Name Address City State Zip • Conta Person Phone Fax Contract. #(card must be pre- •ted) V Expiration Date Verified 0 Yes 0 No Name p I (\ iw-MS'CRAtJ(i -BUI1.01ti°' 41\4 Address 271 r At►,8‘ 2 e1 • r, City Au.&ARA 4 `IX, state kJ a4 Tip 1 t oo 1—2i`i Contact,P-4rson e ax W Al tk)E STEIJ Pon ART �23) 833--33SS 1ts-7)) ASS I — (c(125 LEGAL DESCRIPTION SEE AiTAcHEIJ "SCi•IEJaLE A " Please Complete Reverse Side s,.:":,, SJNG 1Att, ; €� � ; �%'!i���/'., �� �j:,;.;:�,.. sting Use 1JEIJ A1. Leioposed Use tl� � Y REs. Permit includes: 1 Building s O-Plumbing 0 Mechanical 0 Other Type of Work: A Residential 0 New Remodel 0 Number of Units_ 0 Deck 0 Commercial • Addilon Garage 0 Shed 0 Other Enter 1st Floor $11 sq ft 2nd Floor $8 sq ft 3rd Floor—sq ft Existing Floor Area sq ft Area Basement sq ft Decks $ sq ft; Garage TS& sq ft Proposed Total Area I sq ft Water Availability p Sewer Availability $ ti On-Site Se System AXailabili P Project Valuation 887, 000 _ Zoning R S 1. 2. I Lot Size TI si(p sitExisting Bldg Valuation 8 VII •:.r �iiipi;^rf,";;,!„::Milli r�Y�;yrrY.:N:Ri.rf/�,iNiM x. r Y: .fit ! rr/ i s... ;t ` 7, Name s City A . ` to y ,Mg I r,,.. .¢u1.rfC,yu+J ,! '•;:yw,:o.&;y,..,.�s •4r,ri; , Contractor Name i A Addre City Ifr5t Zip Contact i r one Fa License# } ;.r' Expiration Date Verified 0 No f' i A li Contractor Name /-,04 Address 10. City 0 )state Zip Contact .0 Phone Fax f 4 License # Expiration Dates Verified 0 Yes 0 No 4' 1 # Ai Water Closets Sinks * I Uri als V Lawn Sprinklers9Bathtubs Dish Washer Drinking FountaiOther / Showers Electric Water Heaters Sumps Drains ......::................................... in :«<.' 'i Lavatories Washinhine ... ..... . .......... • • • •, ffIfi:. : • .* t MECH#N11041. EVA,IATION ONLY $ Fuel Type(electric/other) N A Grit iki Dryer Air Handlin;< i 10(000 CF 15-30 Tons • Length of Gas Piping r Range Air Handling > = 1 O,000 30-50 Tons Furn <100K BTUs 1 Gas Log Iii • Iir t Herr w 50+ Tons Furn >100 BTUs Fans Miscellaneous / Fuel Tanks • Gas Hwt Hood Boil Above Ground w. Cony Burner Duct Work nsr;• Underground 3- 5 Tons '...O.t>'• >s z ^`w ..:,,,. ....... .:.....: BBQ s Wood Stoves .1 01 .e DISCLAIMER:I certify under penalty of perjury that the information furnished by me is true and correct to the best of my knowledge,and further,that I am authorized by the owner of the above premises to perform the work for which permit application is made.I further agree to save harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in investigation and defense of such laim),which may be made by any person,including the undersigned,and filed against the City of Federal Way,but only where such claim arises out of the reliance of the city,' ding its officers and employees,upon the accuracy of the information supplied to the city as a part of this application. Owner/Agent: Al2�121/Y.L "LP. Date: // 3 /98 a wn.n.Arr d Revise° } Order No. 301348 A_L.T.A. COMMITMENT SCHEDULE A Page 2 The land referred to in this commitment is situated in the county of King, state of Washington, and described as follows : The south 35 feet of the following described tract , to-wit : The west 130 feet of the east 160 feet of the north 75 feet of the south 225 feet of the north half of the northwest quarter of the northeast quarter of Section 9, Township 21 North, Range 4 East, W.M. , in King County, Washington; TOGETHER WITH an undivided 1/56th interest in the following described portion of the north half of the northwest quarter of the northeast quarter of said Section 9, more particularly described as follows : Beginning at a point on the west boundary line of said tract from which point the northwest corner thereof bears north 0°17 ' 23" east a distance of 330 feet; thence south 89°00 ' 36" east, parallel with the north boundary line of said tract, 250 . 02 feet to a point on a line 250 feet east of, measured at right angles thereto, and parallel with the west boundary line of said tract ; thence south 75°54 ' 50" east 308 . 91 feet to a point on a line 550 feet east of, measured at right angles thereto, and parallel with the said west boundary line of said tract, said point being 400 feet south, measured along said parallel line, from the north boundary line of said tract; thence north 74°14 ' 05" east 208 . 12 feet to a point on a line 750 feet east of, measured at right angles thereto, and parallel with said west boundary line, said point being 340 feet south, measured along said parallel line, from the north boundary line of said tract ; thence north 62°01 ' 09" east 329 . 27 feet to a point on a line 1040 feet east of, measured at right angles thereto, and parallel with said west boundary line, said point being 180 . 51 feet south, measured along said parallel line from the north boundary line of said tract ; thence south 61°46 '29" east 125 . 81 feet to a point on a line which is 160 feet west of and parallel with the east boundary line of said tract, said point being 425 feet north of, measured along said parallel line, the south boundary line of said tract ; thence south 0°15 ' 10" west, parallel to said east boundary line 355 feet; thence south 45°33 ' 05" west 98 .48 feet to a point on the south boundary line of said tract distant 230 feet west from the southeast corner of said tract; thence north 89°08 ' 58" west 1081 .47 feet to the southwest corner of said tract ; thence north 0°17 ' 23" east 335 . 90 feet to the place of beginnin , which land is covered by water and is a portion of tTileGER Lake . END OF SCHEDULE A , ? 3 CI 1Y OF BUILDING DEPT.AY I • Pali vx i .. %- J. 1 _ I 1." ""—"'— __ — .,, ,,,,p i,, . .... . • ; IN : `k tt ,0 lit ( IU' Y ±� . I i T o — � 3 ,_- II I III — .s y». . s 11 a : . L1I j �. - LII N 0,'JO JI'! If fyf A tr. s l y� i4 I!� ip c�ig �i8:` �3�boae3 °°'� 8 ," ` . 1 A 0 ili . . 4;:daNs:.tet L"t i‘ kIll IN 6 t i It iiiti \a(tety4roViAl k 14 t‘tt. 3% ik, § El 23 l � a �o��Qt ,�te o 41 ie 1� eft:8 2t ' 2 � °�, o,�a�a'� � ,� ° . tie A �° � � o �, t t -� I ;trill 4t.il off, y p. � t a° aIt 3 • t`, r I. ° ��;0 3 Say � � '� �o Y = C l _ i'fti‘ it‘i^a 08 4 k t%; „ It, et •72 8 .siktk,%4kt4 14 Itcke % • get \ N. I !el -. * Nt.;,, Z;k4'..ritk,ItOat W. .: ) (.411 iik.q *)4.4:„*4kttl '114.y.: tv ws, ; Nt ri . 8 ^ i .iao1kNA411 Si , 6 ,li8k @ � a :� i CE Ems --. L1-Iv OF FEDERAL WAY BUILDING DEPT. . . I fij 1 ....:) (18 0NN\ e. A e 0 July 21, 1998 M.K.Gaviglio King Co.Tax Lot#0921049092 Building Official Permit#BLD98-0034 City of Federal Way 33530 Vt Way South Federal Way,WA 98003-6221 Ms. Suzanne Wong P.O.Box 28677 Seattle,WA 98118 (206)723-7826 Dear M.K.Gaviglio: I am requesting a 180-day extension of the permit application submitted on January 23, 1998. Due to the lot being lower in elevation than the adjacent lots,I need to determine the flood level of Steel Lake to detennine final building elevations.As it is the houses on either side of the lot are built higher than my existing grade.The submitted plans are for building on the existing grade,which I believe may be too low. I request that an extension be granted so that I may complete the permit process in order that I may build on the lot. ortkAi ----,..gypo incere ,O ii 2 2 1998 ci I r O I-EIJEftetL WAY EUILDING DEpr Suzanne Wong CITY OF dEEI.. _ E. (253)661-4000 N)� F1.51 33530 1ST WAY SOUTH FEDERAL WAY,WA 98003-6210 July 17, 1998 Suzanne Wong P.O. Box 28677 Seattle, WA 98118 RE: EXPIRATION OF PERMIT Our records indicate that on January 23, 1998, an application for permit #BLD98-0034 was submitted to the City of Federal Way. The expiration date of the 180 day period is July 23, 1998. Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days on written request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once, in accordance with the provisions of the Uniform Building Code, Section 107.4. The permit is null and void, effective July 23, 1998, if we do not receive your written request. Before a permit can be issued, a new permit must be obtained and a new full permit fee paid. A new permit application is to be filed and must comply with codes currently in effect. A new plan review may be required and a new plan review fee paid. If you have any questions please call 253-661-4115 or 253-661-4117. Sincerely, air.-ifi Building Official cc: file wongexpi.doc CITY OF 33530 1ST WAY SOUTH (253)001- 20 FEDERAL WAY,WA 98003-6210 February 4, 1998 Susan Wong PO Box 28677 Seattle, WA 98118 Subject: Single Family Residence Permit#BLD98-0034 30521 28th Ave South Dear Ms. Wong: The Public Works Department staff has reviewed your permit application for single family residential construction. The following items need to be addressed prior to issuance of the building permit: 1. Water and sewer availability letters are required. 2. The storm drain outlets must have rip rap protection. Please provide a detail sizing the rip rap pad per the King County Surface Water Design Manual (KCSWDM). 3. Provide a temporary and permanent erosion control plan for the project site. .- 4. All storm water runoff from the paved areas subject to vehicular use shall be _ - treated by separate storm drainage facilities. An oil/water separator and bioswale shall be designed, per the KCSWDM, to treat this runoff. Submit plans and details for construction of this facility. The following items are conditions of the building permit: A. Construction of the storm drainage facility for the storm water runoff from the paved areas must be installed and inspected by the Public Works Inspector prior to final building inspection. B. The 100-year flood elevation of Steel Lake must be determined prior to constructing the foundation. The finished floor elevation shall be on-foot above the 100-year flood elevation. Provide a copy of the topography survey produced to determine the flood elevation, which must be signed and stamped by a licensed Land Surveyor. • Page 2 February 4, 1998 Ms. Wong C. All electrical utilities shall be placed underground. D. Temporary erosion and sedimentation control measures must be in place prior to clearing and grading. The TESC measures must remain in place during the entire construction period. The permanent control measures must be in place prior to final building inspection. E. The tightline roof drainage system must be inspected prior to backfilling the trench and prior to final building inspection. F. Section 22-1473 of the FWCC requires street improvements along 28th Ave. The required improvements are not warranted at this time. The improvement requirements may be deferred. A no-Protest LID Agreement will need to be signed and recorded by the applicant. The Building and Planning Departments may also have comments regarding your permit and will contact you independently. We hope your experience working with the City is a pleasant one and if you have any questions please contact me at 661-4125. Sincerely, J lie e n nginee g Plans Reviewer II c: Stephen Clifton, Development Services Manager Project File Day file LAPRMSYMDOCUMENTABLD98 00.34WW020498.DOC • • NELSON-COUVRETTE & ASSOCIATES INC. CONSULTING GEOTECHNICAL ENGINEERS, GEOLOGISTS AND ENVIRONMENTAL SCIENTISTS 17311-135th Avenue NE,A-500 Snohomish County(206)337-1669 Woodinville,WA 98072 (206)486-1669•Fax 481-2510 Wenatchee/Chelan(509)784-2756 October 10, 1996 .611V-oc3ti Ms. Suzanne Wong P.O. Box 28677 Seattle, Washington 98118 Geotechnical Engineering Review Report Proposed Wong Residence 30521 -28th Avenue South(Steel Lake) Federal Way, Washington NCA File No. 149896 Dear Ms. Wong: INTRODUCTION This report presents the results of our geotechnical engineering review for your proposed residence development within the above referenced project. The site is located at 30521 - 28th Avenue South, in the Steel Lake area of Federal Way, Washington. For our use in preparing this report, we reviewed a previous geotechnical evaluation report, prepared by us (as David L. Nelson & Associates, Inc.), and an undated site plan titled "Approved Footprint" which was supplied to us by you. The site is a residential lot situated on the west side of 28th Avenue South, and on the east side of Steel Lake, measuring approximately 60 feet by 35 feet. An existing sanitary sewer line easement is located between the proposed residence location and 28th Avenue South.' The residence structure is proposed to be 10 feet from the surveyed shoreline. You are planning to construct your residence in the west portion, between the sewer line easement and the 10 foot setback from Steel Lake. The foundation footprint of the planned residence is approximately 25 feet by 29 feet, with the longer direction facing east to west south. The adjacent lot to the north has an existing residence approximately 5 feet from the property line. The adjacent lot to the south has an existing driveway and yard area, with the residence at least 25 feet east of the property line. r ^ A $t Cd NVED %Mk 3 0 1998 CITY OF FEDEp tl WAY Geotechnical Engineering Review Report Proposed Wong Residence- Steel Lake October 10, 1996 NCA File No. 149896 Page 2 SCOPE The purpose of this review and report is to evaluate the existing conditions, review the previous report, characterize the subsurface conditions, and present recommendations for site development. Specifically, our scope of services includes the following: 1. Review available geologic and soils data for the site, based on published geologic maps. 2. Review the existing geotechnical evaluation report,dated August 6, 1986. 3. Observe the surface conditions at the site to determine if significant surficial changes have occurred since the preparation of the previous report. 4. Review recommendations for site preparation and grading, recommendations for subgrade improvement and foundation design. 5. Provide general comments on surface and subsurface ground water conditions, and site drainage and erosion control recommendations. 6. Prepare a written report to document our review, findings and recommendations. SITE CONDITIONS Surface The original report discusses the site as moderately to gently sloping down to the west from 28th Avenue South, and covered with grass and a few trees. Our recent site visit indicated similar conditions, with now larger trees. No changes to the surface conditions are apparent. A wood fence in fair to poor condition exists around the landward sides of the property. Soils Conditions The previous report describes the soils conditions within this site to consist of a basal strata of glacial drift, shown on the test pits logs,to be encountered at depths below 6 to 9 feet. The glacial drift consists of blue-gray, medium dense, fine, silty sand/sandy silt with some gravel. Overlying the glacial drift is 2 to 3 feet of light gray, very loose(soft), clayey, sandy silt/silty clay in a very wet state. A strata of dark brown, very loose(soft),organic peat, in a very wet state overlies the soft clay/silt,and varies from about 1.5 to 2.0 feet thick. The surface soils were found to consist of about 2 to 4 feet of fill. The fill was found to consist of brown, dark brown and gray, loose, mixed silt, sand, gravel, debris, rocks, rubble, organics,etc.,of unknown origin. The fill was found to be apparently thicker toward the west. NELSON-COUVRETTE&ASSOCIATES, INC. Geotechnical Engineering Review Report Proposed Wong Residence- Steel Lake October 10, 1996_ NCA File No. 149896 Page 3 Our recent observations showed no indications of significant changes to the surface. This would lead us to believe that, the previously encountered subsurface soils conditions could be expected to be similar as those originally described. Hydrologic Conditions In the original report, ground water was found in all test pits, and appeared to be "perched" above the basal glacial drift deposits. This condition is not expected to have changed from the original findings. CONCLUSIONS AND RECOMMENDATIONS General The conclusions and recommendations presented in the original geotechnical evaluation were presented in a fashion to allow the original owner to evaluate their potential for site development. The conclusions discussed the fact that the near-surface fill, organic deposits and soft clay/silts were undesirable for conventional shallow foundations. The potential for distress to the structure, due to differential settlements,was presented. Alternative foundation preparation and support suggestions were made, including removal and replacement with structural fill or pile/pier support. Because of the difficulty with overexcavation adjacent to existing structures, pavements and utilities, and the nearby lake, the pile/pier alternative was discussed and presented as the preferable alternative. The site is underlain, at a shallow depth, by soft clay/silt, organic deposits of peat covered with fill. The peat should be expected to settle with time both under its own weight, and also under any new loads. The thickness of the fill and peat totaled about 6 feet over the building area, with the soft clay/silt being found to about 9 feet below grade. In our opinion, this condition would cause undesirable differential settlement if the structure was floated. At depth,the site is underlain by medium dense glacial drift. We concur with the recommendations that suggest that the foundations be extended down into the glacial soils. Deep foundations could consist of drilled piles or piers, or driven "pipe" piles. Also, whenever foundations such as these are used, in areas where ground surface settlements are expected over time, additional design is appropriate. We recommend that approach slabs be designed as structural slabs that hinge to the structure. This allows settlement of the slab without dropping down from the structure. NELSON-COUVRETTE&ASSOCIATES, INC. Geotechnical Engineering Review Report Proposed Wong Residence-Steel Lake _October 10, 1996 _ NCA File No. 149896 Page 4 Decks may be either floated or founded similar to the structure. We would expect that the performance of the deck foundations would not be acceptable, if it is floated next to a house that is founded on deep foundations. Foundations General: Fill, peat and soft clay/silt soils were encountered within the proposed building portion of the site,to total about 9 feet in thickness. Most of the structure is expected to have these undesirable soils to this depth. Depth of the explorations was limited by the exploration equipment and site conditions to only 11 feet below grade. Soils conditions below this depth are unknown. However, based on similar sites and conditions, it is expected that dense glacial deposits should underlie the site for depths sufficient to support the structure, using the recommended means and techniques. Piles and Drilled Piers: Piles can be driven or drilled, and/or cast-in-place. Driven piles would consist of steel pipe. Timber piles would not be considered cost effective because of the relatively shallow depth to bearing soils. The vibration of the pile driving equipment would also be a concern with respect to the adjacent residences. Pipe piles can be used if they are shown to be economical. Typically, 2-inch pipes are driven using a 90-pound jack hammer,to a refusal criteria of less than 1 inch of advancement for one minute of driving. A 4,000 pound capacity is used for these piles. If desired, larger piles, hammers and capacities are available and still considered small scale. Most likely the steel piles could be economical for the structure, since there is a difficulty with access, the small installation area, and the close proximity of the sewer line. We suggest that you contact a contractor experienced in this method. Cast-in-place piles can consist of auger-cast piles or open holed drilled piers. The auger-cast piles are drilled with a hollow stem continuous flight auger, and grout is pumped into the hole as the auger is withdrawn. This method is the most reliable cast-in-place pile, as the auger keeps the hole from caving as the grout is placed. •The open hole pier is the least expensive method. The risk involved with this method is whether or not the hole will stay open. The piles will have to penetrate the underlying glacial deposits. If significant ground water is present, the holes could cave in both the peat and the underlying sand. The risk in this method would be that only a portion of the piles could be drilled open hole, and then some other type of system would have to be used to finish the rest. Whenever piles or piers are used, a grade beam needs to be designed to span between the piles and support the structure. A structural engineer would be required to provide the design of pile NELSON-COUVRETTE&ASSOCIATES, INC. Geotechnical Engineering Review Report Proposed Wong Residence- Steel Lake October 10, 1996 NCA File No. 149896 Page 5 reinforcement and the grade beam system. Additional geotechnical support would be necessary for the installation of the foundation. Typical pile loads for this type of condition are 10 tons, with a minimum of 3 feet of penetration into the underlying glacial deposits,using 12-inch diameter piles. Erosion Control Measures Erosion control methods should be undertaken to prevent surface runoff from flowing into nearby Steel Lake or adjacent properties. We recommend that surface runoff be diverted to controlled drainage and siltation areas. We recommend that a silt fence be erected around the disturbed portion of the site. Hay bales may be substituted for a silt fence, provided that they form a continuous line. Excavation spoils should not be placed outside of the erosion control area. Erosion control measures should conform to applicable local and county requirements. Site Preparation and Grading Excavation around the structure will unearth fill, peat and clay/silt soils, which are highly moisture sensitive and nearly impossible to work with. We recommend that any excavated soils be immediately removed, placed into trucks and removed from the site. The on-site soils, likely to be exposed during construction, are considered highly moisture sensitive. We recommend that earthwork be conducted during the drier summer months. Even during the summer months, construction activity may disturb the existing surface. We recommend that a blanket of rock spalls be placed in the planned access roadway, or where construction equipment will be working. The thickness of the spalls should be based on soil conditions at the time that the site is developed, and their performance under heavy equipment. For estimating purposes,we recommend using a minimum of 1 foot thickness of spalls in traffic areas. Drainage We recommend that runoff from impervious surfaces, such as roofs, driveway and access roadways, be collected and routed to an appropriate storm water discharge system. The roof drains should be tightlined separate of the footing drains, until the tightline is a minimum of 1 foot vertically down gradient from the footing drains. We recommend that the ground surface in crawl spaces be sloped to drain to an appropriate discharge point. A drainage path from the crawl space and capillary break material, to the footing drain system should be maintained. The ground surface adjacent to the building should be sloped to divert surface water away from the structure. NELSON-COUVRETTE&ASSOCIATES, INC. Geotechnical Engineering Review Report Proposed Wong Residence- Steel Lake October 10, 1996 NCA File No. 149896 Page 6 We recommend that footing drains be installed along the outside of the planned exterior wall footings. Footing drains should be installed at least 1 foot below planned finished slab or crawl space elevations. Footing drains should be constructed of 4-inch perforated PVC pipe. We recommend that footing drains be surrounded in free draining material such as pea gravel. The footing drains should be sloped to drain, and routed to an appropriate discharge point. Slabs Any slab not structurally supported on piles or piers should be expected to settle. If these slabs are approaches to the pile supported structures, a break and differential settlement should be expected at the connection. A common practice is to design transition slabs for these conditions. The transition slab is a structural slab that is hinged into the structure. The hinges usually consist of rebar that extend from the slab into the adjacent foundation. This allows the unsupported end of the slab to settle with the surrounding ground surface, while the other end stays attached to the structure, but is allowed to rotate. This eliminates the vertical offsetting at the connection,which is typically undesirable. Slabs where moisture control is critical should be underlain by a 6-inch capillary break, consisting of a free draining sand and gravel. A plastic vapor barrier should be placed over the capillary break material. The capillary break should be designed so that it can drain into the foundation drain system. Monitoring We recommend that the geotechnical engineer be on site during installation of the driven pile or drilled pier installations. Depths of penetration for each should be verified, with logs of each pile maintained. A subsequent letter detailing the site observations, pile depths, recommended loads per pile, and any other geotechnically related findings should be presented. • USE OF THIS REPORT We have prepared this report for Ms. Suzanne Wong, and her agents, for use in planning and design of this project, and as a geotechnical engineering follow-up to the original geotechnical evaluation report. The data and report should be provided to prospective contractors for their bidding and estimating purposes, but our report, conclusions and interpretations should not be construed as a warranty of subgrade conditions. If conditions observed during construction are different than that described in this NELSON-COUVRETTE&ASSOCIATES, INC. w Geotechnical Engineering Review Report Proposed Wong Residence- Steel Lake October 10, 1996 NCA File No. 149896 Page 7 report, we should be retained to review these conditions and provide additional recommendations, as necessary. The scope of our work does not include services related to construction safety precautions, and our recommendations are not intended to direct the contractors' methods, techniques, sequences or procedures, except as specifically described in our report for consideration in design. There are possible variations in subsurface conditions. We recommend that project planning include contingencies in budget and schedule, should areas be found with conditions that vary from those described in this report. We should be retained to provide monitoring and consultation services during construction, to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated, and to evaluate whether or not earthwork and foundation installation activities comply with contract plans and specifications. Within the limitations of scope, schedule and budget for our work, we have strived to take care that our work has been completed in accordance with generally accepted practices followed in this area at the time this report was prepared. No other conditions,expressed or implied,should be understood. We appreciate the opportunity to be of service to you. If there are any questions concerning this report or if we can provide additional services,please call. Sincerely, I$ I2 W SD� ,�►� NELSON-COUVRETTE& ASSOCIATES, INC. �4 4vcA, 4 , / .• a11. ,t. C/STER 4" S .10 1ONAL.Sy. I EXPIRES 11g• 40• A•418 I David L.Nelson, PG Charles P. Couvrette, PE Professional Engineering Geologist Principal Engineer Three Copies Submitted NELSON-COUVRETTE&ASSOCIATES, INC. • �l +y • • S. DAVID L. NELSON AND ASSOCIATES, INC. _ Consulting Engineering Geology 206/788-5612 13424 Chain Lake Road Monroe,Washington 98272 206/794-4332 14;1,V1 .6)63 August 6, 1986 1 Project No. 9086 j ‘ :, E Mr. R. Greg Otto 8240 So. 122nd Seattle, Washington 98178 Reference: Geotechnical Evaluation Proposed Otto Residence 30521 - 28th Avenue South King County, Washington • Dear Sir; This is to serve as a report of geotechnical exploration and evaluation within the above referenced project site, per your request. Introduction The purpose of this report is to present information relative to construction of the, proposed residence within the site area. We understand that the const- ruction is to consist of a three story wood frame structure, located about in the area shown on the enclosed location map. The scope of services included performance of three backhoe test pits around the site area. The locations of the test pits are approximately shown on the enclosed location map. All elevations mentioned in this report refer to existing grade. The intent of this report is to outline soils and hydrologic conditions as encountered during our explorations and observations, and to provide infor- mation for development and design considerations. RECEIVED JA N 3 s 1998 GI I OF FEDERAL WAY BUILDING DEPT. DAVID L.NELSON AND ASSOCIATES,INC. Consulting Engineering GcvIugy August 6, 1986 Project No. 9086 Page two Location & Site Description The investigated site area consists of an undeveloped lot, located at 30521 28th Avenue South, in the Federal Way area of King County, Washington. The site lies between existing residences, along the east shore of Steele Lake. Topographically, the site slopes moderately to gently toward the west, down from 28th Avenue South. Vegetation consists of grass covering, and a few trees. Soils Conditions The subsurface soils strati'graphy can best be seen on the enclosed test pit logs. In general, the site was found to be underlain across the area by blue-grey, medium dense fine silty sand/sandy silt, with some gravel. This material was observed to be glacial in origin, and appears to be glacial drift. Overlying the basal glacial drift is a strata of light grey, very loose, clayey sandy silt/ silty clay, in a very wet state. This strata was generally found_to.te 2' to 3' thick, at elevations below 4' to 6' below grade. Overlying the light grey clay soils is 1.5' to 2' of dark brown very loose organic peat, considered the old surface soils prior to subsequent artificial fill placement. The artificial fill was found surficially across the entire site area explored, and generally consists of brown, dark brown and grey, loose, mixed silt, sand, gravel , debris, rocks, rubble, organics, etc. , of unknown origin. The fill ranges in thickness from 2' to 4' , with the thickest portions apparently within the western (lake) portion of the site. The area of the existing sewer line is understood to occur about as shown on the location map. Backfill within the trench is also unknown, since exploration was not performed. Hydrologic Conditions The ground water table was encountered in all test pits performed. This ground water table appears to be 'perched' , where saturation of the soils occurs above a relatively impermeable underlying strata. It appears that the basal glacial drift soils impede water movements downward, creating an upper saturated zone within the clay, peat and fill soils, particularly near the lake. This condition appears chronic, and probably becomes greater during the wetter months of the year. DAVID L.NELSON AND ASSOCIATES, INC. _---- Consulting€ngtneering Geology August 6, 1986 Project No. 9086 Page three Conclusions Based upon the explorations and observations performed, and general analysis of the so&ls and hydrologic conditions, it appears that the proposed residence construction will require foundation support other than normal shallow footings placed upon the existing soils. The surficial soils above the basal glacial drift are not expected to be suitable for proper footing placement, without potentially distressful differential settlements in the structure. We believe that alternative foundation preparation be anticipated, consisting of removal and replacement with structural fill , or pile/pier support, or other methods where potential settlements are minimized. Recommendations Alternative foundation support recommendations generally consist of those where foundations are supported by suitable backfill or deeper foundations, such as piles, piers or extended footings. Within this site area, the alternative for removal of the unsuitable surficial soils down to the firm glacial , and replacement using suitable granular soils is available, but may not be appropriate, due to the close proximity of the neighboring houses, driveways and utilities. Shoring of these excavations would probably be required if excavated. These nearby areas may be quite sensistive to undercutting, and failure of these may occur. If this method is desired, we could transmit all required shoring recommendations, backfilling procedures and compaction/material requirements. Extended footings also may not be advantageous, since the excavations may not hold open during the footing construction phase. The footings would require placement into the basal glacial drift soils, which may mean extensive dewatering and possible shoring as discussed above. Piling or piers appear to be a suitable alternative for foundation support. We would suggest the use of piling/piers which are not driven, since vibration may damage the nearby structures. Drilled piles/piers, of concrete or grout consistancy, appear to be the most feasible and appropriate for the site area. DAVID L.NELSON AND ASSOCIATES,INC. Consulting Engineering Geology August 6, 1986 Project No. 9086 Page four We would anticipate that drilled piling/piers require at least 5' of penetration into the underlying medium dense glacial drift soils, to achieve an anticipated maximum allowable load per pile of 10 tons, using a minimum 12" diameter pile. We expect that these installations should be cased, where an auger-cast type pile is installed. Open-hole type piers may not be capable of standing open adequately to allow placement of concrete within a properly drilled hole. The auger-cast type pile seems most reasonable, and several contractors and methods of placement are available. We suggest that at least two test piles be installed before production piles are performed, to determine if the basal glacial material is adequately thick. All test piles and production piles should be monitored by the geotechnical consultant. Since the structure will be pile supported, all attached portions of the building should also be pile supported, or completely and structurally indepen- dant from the structure. This includes slabs, decks, walkways, retaining walls, etc. , which maybe placed around the site area. The surficial soils are ex- pected to settle over time, so any structure placed upon these soils should be expected to settle, and perhaps show distress or failure, unless properly supported. Adequate drainage should be provided around the site area. We suggest the use of foundation and roof drain systems, independantly directed into control areas. Although we do expect site soil types, conditions and distributions to reflect our findings, some variations could occur. Should conditions other than those discussed herein be encountered, the geotechnical consultant should be notified for review and comment. Additional or alternative recommendations may be required. Thank you for the opportunity to be of service. If you have any questions, feel free to call on us at any time. Sincer , DA L. & ATES, INC. D vid L. Nelson, PG Professional Engineering Geologist DLN:kmn • ,66La Pt4 - - �� ta16/�'r ,top o x 6GeraF • LOCJcrb&) I/VI AP DAVID L.NELSON AND ASSOCIATES,INC. cunsulting il�OIMS GeoI — r/l8 56,2 7-LcST P/TS 13424 Chain Lam.Road •-lisii#011A 96272• 206m++332 GAL':G 5117D I�ESID root, (J . , Le.)A Stl • .r i 86 SCALE �� PROJ.NO. o DATE eA/B6 SHEET �� TEST PIT LOGS TP-1 0-4.0 Brown, dark brown & blue-grey, loose, mixed silt, sand & gravel with organics, debris, rocks, etc. FILL Wet 4.0-6.0 Dark brown very loose organic peat Very Wet 6.0-9.0 Light grey, very loose, clayey silty fine sand/silty clay Very Wet 9.0-11.0 Blue-grey medium dense poorly sorted silty sand and sandy silt, with gravel TP-2 0-2.5 Brown loose mixed organic silty sand, gravel with debris, logs, rocks, etc. FILL Wet 2.5-4.5 Gtey poorly sorted sand and sand/gravel FILL H 0 Flow 4.5-6.0 Dark brown very loose organic peat Very Wet 6.0-9.0 Light grey, very loose clayey silt/silty sandy clay Very Wet 9.0-11.0 Blue-grey, medium dense, poorly sorted silty sand/ sandy silt with gravel TP-3 0-2.0 Brown loose mixed silt, sand, gravel, organics, debris, rubble, concrete, etc. FILL 2.0-4.0 Dark brown very loose organic peat Very Wet 4.0-6.0 Light grey, very loose, clayey silt/silty sandy clay Very Wet 6.0-9.0 Blue-grey, medium dense poorly sorted silty sand/ sandy silt with gravel DAVID L.NELSONAND ASSOCIATES,INC. Consulting Geology206PU.S612 13424 Quin Lake Road .` NA 9E272• 206/7944332 Greg Otto Residence King Co., Washington SCALE — PROJ.NO. 9086 DATE 8/5/86 SHEET 1 of 1