Loading...
23-101657City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Building - Commercial Permit #:23-101657-00-CO Inspection Request Line: (253) 835-3050 Project Name: FEDERAL WAY CITY HALL 7 3 Project Address: 33325 8TH AVE S Parcel Number: 926500 0290 Project Description: BLUEBEAM - Adding a secondary entry door and transaction window for the law department. Owner Applicant Contractor Lender CITY OF FEDERAL WAY JASON MOORMANCITY OF OWNER IS CONTRACTOR 33325 8TH AVE S FEDERAL WAY - PARKS FEDERAL WAY WA 98003 33325 8TH AVE S FEDERAL WAY WA 98003 Census Category: 437 - Commercial alt / add / conversion Includes: # 1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (s . ft.) 0.00 0.00 0.00 0.00 Additional Permit Information Mechanical to be Included? ..................................... No Plumbing Work Valuation? .................................... 0 Mechanical Work Valuation? .................................. 0 Number of Stories................................................... 2 Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only? .............................. No Plumbing to be Included? .......... ........ I ....... ..... I........ No No Fixtures Associated With This Permit !! CONDITIONS: FIRE APPROVAL CONDITIONS: 1. Demolition and construction shall conform to the requirements of International Fire Code (IFC) Chapter 33. 2. Before you start work, schedule a Pre -Construction meeting with the Deputy Fire Marshal by calling 253-946-7318. 3. Separate permits and approvals are required for review or inspection of new fire protection or detection systems, or existing systems where any additions, alterations, or revisions are made. Obtain permits through the City of Federal Way. 4. Call 253-946-7318 to schedule your inspections. Please schedule your inspection at least 2 business days in advance. The fire marshal's office will call you back and set up an agreed upon time. Preferred inspection days are Tuesday through Thursday with limited inspection availability on Monday's and Friday's. PERMIT EXPIRES Sunday, 24 December, 2023 Permit Issued on Tuesday, June 27, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: _ _ Date THIS CARD IS TO REMAIN ON -SITE CITY OF �--" Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 23 101657 00 Address: 33325 8TH AVE S Project: CITY OF FEDERAL WAY FEDERAL WAY WA 98003-6325 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q Footings/Setback (4110) 0 Re -steel (4215) Slab/Concrete Floor (4255) Approved to place concrete Approved to place concrete or grout Approved to place concrete By Date By Date By Date El Underfloor Framing (4285) 0 Floor Sheathing (4105) © Fire/Draft Stops (4095) Approved to sheath floor Approved to install flooring Approved By Date By Date By Date Prior to scheduling a Framing inspection; 7� Framing (4120) 0 Insulation (4150) Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed - Approved to insulate Approved to install wallboard off and approved. IBC 109.3.4 By Date By Date ® Gypsum Wallboard Nailing (4130) Suspended Ceiling Grid (4265) 0 Final - S K F & R (4060) Approved to install mud & tape Approved to drop tile Approved By Date By Date By Date 0 Final - Planning Final - Building (4050) Approved fBy Approved By Date Z Date i/Q/, Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date