Loading...
22-104639i. A . a Building - Commercial City of Permit #:22-104639-00-CO CommunityyDevelopment Dept, 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MEMORIAL STADIUM - BLDG 7 VISITOR RESTROOMS AND CONCESSIONS' Project Address: 1300 S 308TH ST Parcel Number: 082104 9001 Project Description: BLUEBEAM - Construction of 2368 sqft visitor restroom/concession building, including plumbing and mechanical. Owner Applicant Contractor Lender FEDERAL WAY PUBLIC SCHOOLS KRIS STAMONMCGRANAHAN B N BUILDERS OWNER IS LENDER 33330 8TH AVE S ARCHITECTS 2601 4TH AVE SUITE 350 FEDERAL WAY WA 98003 2111 PACIFIC AVE SUITE 100 SEATTLE WA 98121 TACOMA WA 98402 Census Category: 328 - New Other Non -Residential Building Includes: #1 #2 #3 #4 Occupancy Class: Construction T e: Occupancy Load: Floor Area (sq. ft.) 0.00 Additional Permit Information New / Additional Sq. Feet - 1st Floor ..................... 2368 New / Additional Sq. Feet - 3rd Floor— .................. 0 New / Additional Sq. Feet - Deck ........................... 0 Mechanical to be Included? ..................................... Yes Mechanical Work Valuation?........... ....................... 78000 New / Additional Sq. Feet - Other ........................... 0 Permit for Building Shell Only? ................ I............. No New / Additional Sq. Feet - Total ........................... 2368 Comprehensive Plan Designation .......................... Community Business Total Valuation: 1,300,000.00 Air Handling Units Gas Pipe Outlets Drains Other Plumbing Fixtures Vacuum Breakers Hose Bibbs New / Additional Sq. Feet - 2nd Floor .................... 0 New / Additional Sq. Feet - Basement .................... 0 New / Additional Sq. Feet - Garage ........................ 0 Plumbing Work Valuation? ..................................... 340000 Number of Stories ........... :.......................... ............... I Is this an Online or O.T.C. application? .................. No Plumbing to be Included? ........................................ Yes Will Certificate of Occupancy be Issued? ............... Yes Zoning Designation ................................................. BC qr Mechanical Fixtures 1 Ducting 1 Plumbing Fixtures 8 Drinking Fountains 5 Sinks 5 Water Closets 4 Public Works Conditions: All related public works stormwater 1 Fans 2 I Lavatories I4 2 Urinals 7 33 Water Heaters 1 CONDITIONS: work will be under permit 22-104213-00-CO. FILE PERMIT EXPIRES Monday, 28 August, 2023 Permit Issued on Wednesday, March 1, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section R110 of the International Residential Code is certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: MEMORIAL STADIUM - BLDG 7 VISITOR RES' Permit # 22-104639-00-CO Address: 1300 S 308TH ST Includes: # 1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) 0.00 Owner Name: FEDERAL WAY PUBLIC SCHOOLS Owner Address: 33330 8TH AVE S FE17E WA 98003 Buildviewland ficial Date Lareview y focus in the inspection made by the City prior to issuance of this Certificate was on those matters which e has shown most severely affect the health and safety of the general public. Although the City has made as complete nd inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nts to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon situated. Such compliance is the responsibility of the owner and / or occupant of the premises. THIS CARD IS TO REMAIN ON -SITE CITY °F Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 104639 00 Address: 1300 S 308TH ST Project: FEDERAL WAY PUBLIC SCHOOLS FEDERAL WAY WA 98003-4903 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Site Assessment (Erosion) (4365) Q Footings/Setback (4110) 0 Foundation Wall (4115) To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete By Date By Date By Date El Drainage/Downspout (4040) Q Re -steel (4215) ® Plumbing Groundwork (4190) Approved to backfill Approved to place concrete or grout Approved to cover By Date By Date By Date 7❑ Slab/Concrete Floor (4255) ® Underfloor Framing (4285) 0 Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date 48 Shear Walls (4245) 7t Roof Sheathing (4220) 12 Rough Plumbing (4230) Approved to install siding Approved to install roofing Approved By Date By Date By Date E3 Mechanical Rough -in (4165) 14 Gas Piping (4125) 16 Fire/Draft Stops (4095) Approved Approved to release test Approved By Date By Date By Date i B Interim Erosion Control (4370)EElectrical, scheduling a Framing inspection; 97 Framing (4120) Approved Plumbing & Mechanical Rough -in Approved to insulate raft Stop inspections must be signed - By Date and approved. IBC ]09.3.4 By Date ® Insulation (4150) 19 Gypsum Wallboard Nailing (4130) Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud & tape Approved to drop tile By Date By Date By Date 21 Final - S K F & R (4060) 22 Final - Planning 0 Final - Public Works (4080) Approved Approved Approved By Date By Date By Date 2a Final Erosion Control (4375) 25 Final - Mechanical (4065) Final - Plumbing (4075) Approved Approved Approved �j� —To pl ' By Date By Date By Date q 27 Final - Building (4050) Approved By G Date la ©Iz3 q jr1/3--_J_0 - R0Ak Mil kAf-Uk\*n ,\v El Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date By Date By Date