23-102098City of Way
'
FLEE
Development
Community Developp ment Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: DELMAR
Project Address: 945 S 293RD ST
Electrical
Permit #:23-102098-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 515280 0050
Project Description: Install Subpanel, 6 new branch circuits to replace existing wiring, Modify 3 ex circuits,
relocation washer/dryer outlets
Owner
Applicant
Contractor
JEREMY & COLEEN DELMAR
JEREMY DELMAR
OWNER
945 S 293RD ST
945 S 293RD ST
OWNER
FEDERAL WAY WA 98003
FEDERAL WAY WA 98003
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Circuits - Residential 9
PERMIT EXPIRES Monday, 16 October, 2023
Permit Issued on Wednesday, April 19, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: i ; ` Date.
CITY or
Federal Way
TIIIS CARD IS To REII_-I\ ON -SITE
Construction Inspection Record
I\SPECTIO REQUESTS: (253) 33f,-3050
Scheduled inspections ma; be f ►iled if this card is not on -site. DO NOT LD•5E MS CARD. Inspections are listed as close to sequential order as possible
(read left to rieht. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
volt are unsure about any of the inspections or the inspection sequence. On -going inspections are logged oil the back of this card.
ELECTRICAL
❑
UFER Ground (4295)
❑
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020)
pproved Approved A
roved
By Date � �/ f_/U B} Date�� ov
By Date
El Final - Electrical (4055)
pproced
By 1 Date
MECHANICAL
❑
Jlechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - \Iechankal (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
El
Plumbing Groundwork (4190)
El
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date