Loading...
23-104508Electrical City of Federal Permit #:23-104508-00-EL Community Developmentopment Dept. 33325 y, Ave 5 Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 F- ProjectName: LIESSE Project Address: 104 S 296TH PL Parcel Number: 718300 0010 Project Description: gas furnace replacement / new tstat Owner Applicant Contractor EDWARD E LIESSE TAYLER MANNINGPACIFIC HEATING & PACIFIC HEATING & COOLING 104 S 296TH PL COOLING (ELECTRICAL) FEDERAL WAY WA 8607 DURANGO ST SW SUITE A PACIFHC798DR (4/12/25) 98003 TACOMA WA 98499 8607 DURANGO ST SW SUITE A TACOMA WA 98023 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Residential 1 Thermostat 1 PERMIT EXPIRES Tuesday, 5 March, 2024 Permit Issued on Thursday, September 7, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent- Date: )r;'t,7t7�) CiTy Of Federal Way THIS CARD IS TO PE]L-I1 ON -SITE Construction Inspection Record IISPECTI01 REQUESTS: (253) 535-3050 Scheduled inspections ma- be failed if this card is not on -site. DO NOT LOSE THIS CARD, hispectio is are Irsted as close to sequential order as pos_ible (read left to right. top to bottontl_ please schedule inspections as appropriate. Work uit:st not be co-,: Bred until it is approved. Clieck n itli your inspector if you are unsure about an,., of the inspections or the inspection sequence. Oa -going inspections are logged on the back of this card. ELECTRICAL 0 By LFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date 0 Pool Bonding (4195) 0 Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225} 0 Ceiling Cover (4020) Approved Approved approved By Date BS Date Bj Date 0 Final - Electrical (4055) Approved By Date 4 MECHANICAL ❑ Mechanical Rough -in (4165) 0 Gas Piping (4125) ❑ Final -Mechanical (4065) Approved A.ppro,�ed to release test Approved By Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date