Loading...
23-104615City of Federal Way Community Development Dept' 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: SAVAGE/UPTON Project Address: 815 S 295TH PL Project Description: Heat pump install Mechanical FILFPermit #:23-104615-00-ME Inspection Request Line. (253) 835-3050 Parcel Number: 515210 0120 Owner Applicant Contractor - KELLEN SAVAGE MIKE KILLMER RAINIER HEATING & COOLING, LLC 815 S 295TH PL 11203 BENSTON DR E STE. 110 RAINIHC83OPF (10/22/23) FEDERAL WAY WA 98003 PUYALLUP WA 98372 10227 139TH ST CT E SUITE C-6 PUYALLUP WA 98374 USA Additional Permit Information Mechanical Work Valuation? .................. a ............ ... 6000 Is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures Air Handling Units 1 Compressors / Heat Pumps 1 PERMIT EXPIRES Tuesday, 12 March, 2024 Permit Issued on Thursday, September 14, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of rVspIngton and the City of Federal Way. Owner or agent: L�� Date: Ci7.Y Of Federal Way THIS CARD IS TO RE -MIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-3050 Scheduled inspections niv, be failed if dais card is not on -site. DO NOT LOSE Tffi5 CARD. hispections are Inted as close to sequential order as possible (read left to rift. top to bottom). Please schedule inspections as appropriate. Work rust not be covered until it is approved. Check with Motu inspector lie ': ou are unsure about am, of the inspections or the inspection sequence. On-gorg inspections are loe�ed ou the back of this card. ELECTRICAL ❑ By LFER Ground (4295)❑° Approved Date By Ditch corer (4030) Approved Date ❑ Bs Slab/Concrete Floor (4255) Approved to place concrete Date ❑1 Pool Bonding (4195) ❑ Temporary Power (4275) Q Sex -vice (4235) Approved Approved Approved By Date By Date B` Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved By Date MECHANICAL ❑ 11'echanical Rough -in (4165) 2❑ Gas Piping (4125) 0 Fin 1-Mechanical (406- Approved Approved to release test Approved B� Date B`- Date Bs' Date /6 ti I e, PLUMBING 0 Plumbing Groundwork (4190) 0 Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to toner Approved Approved By Date By Date BY Date