23-103947Electrical
City y Federal Development FILE
Permit #:23-103947-00-EL
Community Development Dept,
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: SLOY
Project Address: 148 S 295TH PL Parcel Number: 543721 0150
Project Description: Installing Circuit(s) for AC System
Owner
Applicant
Contractor
RON SLOY
JOE HARRISELECTRICAL OUTFITTERS
ELECTRICAL OUTFITTERS NW INC
148 S 295TH PL
NW
ELECTON795DJ(3/11/25
FEDERAL WAY, WA 98003
921 18 AVE SW
921 18TH AVE SW
PUYALLUP WA 98371
FEDERAL WAY WA 98371
Additional Permit Information
Is this an Online or O.T.C. application? .............._. Yes
Electrical Fixtures
Circuits - Residential 2
PERMIT EXPIRES Monday, 29 January, 2024
Permit Issued on Wednesday, August 2, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
m an a it L1=ederal Way.
Owner or agent: �J 4 Date:
w� 1
CIi.V of i —�• -
Federal Way
THIS C LRD IS TO RE1I_A_I\ ON -SITE
Construction Inspection Record
I\SPECTION REQUESTS: (2-53) 835-30-50
Scheduled inspections rna., be failed if this card is not on -site- DO NOT LOSE THIS CARD. Ltspectiom are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work mist not be co.. Bred until it is approved. Check , ith yowr inspector if
you are unsure about any of the inspections or the inspection sequence- On -going inspections are logged on the back of this card -
ELECTRICAL
❑
UFER Ground (4295)
Q
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
BV
Date
By
Date
Bs-
Date
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Feeders/Sub-panels (4045)
0
Rough Electrical (4225)
Q
Ceiling Cover (4020)
Approved
Approved
Approved
Bv-
Date
By
Date
Bv-
Date
Final - Electrical (4055)
Approved
ByY`
Date✓J/
MECHANICAL
Q
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - Mechanical (4065)
Approved
Approved to release test
Approved
Bv-
Date
By
Date
By
Date
PLUMBING
0
Plumbing Groundwork (4190)
0
Rough Plumbing (4230)
[j
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
Bv-
Date
135'
Date