Loading...
23-103947Electrical City y Federal Development FILE Permit #:23-103947-00-EL Community Development Dept, 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: SLOY Project Address: 148 S 295TH PL Parcel Number: 543721 0150 Project Description: Installing Circuit(s) for AC System Owner Applicant Contractor RON SLOY JOE HARRISELECTRICAL OUTFITTERS ELECTRICAL OUTFITTERS NW INC 148 S 295TH PL NW ELECTON795DJ(3/11/25 FEDERAL WAY, WA 98003 921 18 AVE SW 921 18TH AVE SW PUYALLUP WA 98371 FEDERAL WAY WA 98371 Additional Permit Information Is this an Online or O.T.C. application? .............._. Yes Electrical Fixtures Circuits - Residential 2 PERMIT EXPIRES Monday, 29 January, 2024 Permit Issued on Wednesday, August 2, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of m an a it L1=ederal Way. Owner or agent: �J 4 Date: w� 1 CIi.V of i —�• - Federal Way THIS C LRD IS TO RE1I_A_I\ ON -SITE Construction Inspection Record I\SPECTION REQUESTS: (2-53) 835-30-50 Scheduled inspections rna., be failed if this card is not on -site- DO NOT LOSE THIS CARD. Ltspectiom are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work mist not be co.. Bred until it is approved. Check , ith yowr inspector if you are unsure about any of the inspections or the inspection sequence- On -going inspections are logged on the back of this card - ELECTRICAL ❑ UFER Ground (4295) Q Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete BV Date By Date Bs- Date Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date Feeders/Sub-panels (4045) 0 Rough Electrical (4225) Q Ceiling Cover (4020) Approved Approved Approved Bv- Date By Date Bv- Date Final - Electrical (4055) Approved ByY` Date✓J/ MECHANICAL Q Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test Approved Bv- Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) 0 Rough Plumbing (4230) [j Final - Plumbing (4075) Approved to cover Approved Approved By Date Bv- Date 135' Date