Loading...
23-104982Electrical City of D vel p nt � Permit #:23-104982-00-EL Community D Y elAv S Dept 33325 S[h Ave S -' Federal Way, WA 98003 FILL Inspection Request Line: (253) 835-3050 Ph: (253) B35-2607 Fax: (253) 835-2609 Project Name: THE WOODLANDS AT REDONDO CREEK LOT 32 Project Address: 30010 19TH AVE S Parcel Number: 952651 0320 Project Description: NEW 100 AMP TEMP POLE Owner Applicant Contractor SSHI LLC DBA D R HORTON SHANNON CHELETTEPROVI DENT PROVIDENT ELECTRIC INC (01) 11241 SLATER AVE NE SUITE 120 ELECTRIC INC PROVIEI103C2 (2/22/24) KIRKLAND WA 98033 17615 SE 252ND ST PO BOX 7087 COVINGTON WA 98042 COVINGTON WA 98042 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Temp. Service: 61 - 100 amps 1 PERMIT EXPIRES Wednesday, 3 April, 2024 Permit Issued on Friday, October 6, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of CAN'tin N CEf Federal Way. Owner or agent: Date: -1:k CITY of Federal Way THIS CAD IS TO O\-SITE Construction Inspection Record I\SPECTION REQUESTS: (2153) 835-3050 Scheduled inspections ima, be failed if thus card is not on -site. DO -NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible i read left to right. top to bottom) Please schedule inspections as appropriate Fort; mast not be covered until it is approved- Check ..vitli Your inspector if you are umure about in-, of the inspections crr the inspection sequence. 0,1-?otIlgy inspections are logged on the back of the card. ELECTRICAL ❑ DEER Ground (4295) ❑ Ditch cover (4030) ❑ SlabiConcrete Floor (4233) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4193) ❑ Temporary Power (4273) ❑ Service (423-5) Approved Approved Approved By Date By Date By Date ❑ FeederslSub-panels (4045 ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) Approved By Date 4-4/4 MECHANICAL ❑ Mechanical Rough -in (416) ❑ Gas Piping (4125) ❑ Final - 3lechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4073) Approved to cover A Traved Approved By Date By Date 131V Date