23-104888Z
City of Federal Way
Cortununity Development Depk
_ems
ILE�AI
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: TESSIER
Project Address: 641 SW 331ST ST
Project Description: HVAC- Install Furnace & HP/AC Swap
Electrical
Permit #:23-104888-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 729803 0130
Owner
Applicant
Contractor
MAURICE & ISABEL TESSIER
CRYSTAL WALTZALLRED HEATING
ALLRED HEATING COOLING ELECTRIC
641 SW 331ST PL
COOLING ELECTRIC LLC
LLC (ELECTRICAL)
FEDERAL WAY WA 98023
505 "F" ST SE
ALLREHC775LO (7/6/25)
AUBURN WA 98002
505 "F" ST SE
AUBURN WA 98002
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 aml 2 Circuits - Residential 2 Thermostat I
PERMIT EXPIRES Saturday, 30 March, 2024
Permit Issued on Monday, October 2, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
:7w s g anfit Q yEvf:FederaJ Way.
Owner or agent:
vivuevt Date:
T-I�Vr,A,l
GI r.Y W _4%�
Federal Way
THIS C-ARD IS TO RE]I_JI\ ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (2-53) 535-3050
Scheduled inspections im-.. be failed if this crud is not on -site. DO NOT LOSE THIS C-kRD. Inspections are listed as close to sequential order as possible
(read left to ri-ght. top to bottom). please schedule inspections as appropriate. work must not be co:•ered until it is approved- Check with vour inspector if
you are unsure about any of the inspections or the inspection sequence. On-?oLL tnSpections are logged on the back of this card.
ELECTRICAL
❑
L-FER Ground (4295)
0
Ditch cover (4030)
0
SlabiConcrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
B`
Date
Bti
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Seri -ice (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
El Final - Electrical (4055)
� Approved
By
A `` Date
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - Mechanical (4065)
Approved
Approved to release test
Approved
BS
Date
By
Date
By
Date
PLUMBING
0
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
El
Final -Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
BY
Date