Loading...
23-104585Electrical Cityof Fede"al yDevelopment Community Development Dept33325 FILE Permit #•23-104585-00-EL 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Inspection Request Line: (253) 835-3050 Project Name: AMIN/JANARDHANA Project Address: 29603 IST AVE S Parcel Number: 062104 9089 Project Description: HVAC- Install Furnace and A/C or HP Owner Applicant Contractor KETAN AMIN CRYSTAL WALTZALLRED HEATING ALLRED HEATING COOLING ELECTRIC 29603 1ST AVE S COOLING ELECTRIC LLC LLC (ELECTRICAL) FEDERAL WAY WA 98003 505 "F" ST SE ALLREHC775LO (7/6/25) AUBURN WA 98002 37816 26TH DR S FEDERAL WAY WA 98003 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Residential 2 PERMIT EXPIRES Monday, 11 March, 2024 Permit Issued on Wednesday, September 13, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: raw Date: CITY of Federal Way THIS C _-�LRD IS TO RE]I_kI\ O\-SITE Construction Inspection Record INSPECTIGI REQUESTS: (253) 535-3050 Scheduled inspections mx, be failed if this card is not on -site. DO NOT LOSE TEIS CARD. Iuspecdcas are listed as close to segwnFaal order as possible (read left to right. too to bottom). ?lease schedale inspectio s as appropriate. Work ntrst not be covered until it is approved. Check :� ith vpur snsgecFpr if you are wimre about my of the inspections or the i. ;pection segttence. On -going inspections are logged on the back of this card. ELECTRICAL LIFER Ground (4295) ❑ Ditch corer (4030) ❑ Slab/Concrete Floor (42-555) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) © Temporary Power (4275) Service (4235) Approved Approved Approved By Date By Date B- Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ' Ceiling Cover (4020) Approved Approved Approved BV Date B% Date By Date El Final - Electrical (4055) Approved BV Date MECHANICAL Q Mechanical Rough -in (4165) ❑ Gas Piping (4125) 0 Final - Mechanical (4065) Approved Approved to release test Approved B-,- Date B} Date By Date PLUMBING ❑� Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date B- Date By Date