23-104980City or Federal Way
FILE
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: JOHNSON
Project Address: 1233 SW 325TH PL
Project Description: Replacing existing furnace
Mechanical
Permit #:23-104980-00-ME
Inspection Request Line: (253) 835-3050
Parcel Number: 926494 0300
Owner
Applicant
Contractor
BRUCE JOHNSON
CAROLYN BRITTA & H HEATING
A & H HEATING & AC LLC (GENERAL)
1233 SW 325TH PL
5422 E 136TH AVE
HHEATHH868NQ (8/18/24)
FEDERAL WAY WA 98023-4920
PUYALLUP WA 98373
1608 132ND AVE E
SUMNER WA 98390
Additional Permit Information
Mechanical Work Valuation? .................. ....:........... 1000 Is this an Online or O.T.C. application?.................. Yes
Furnaces
Mechanical Fixtures
PERMIT EXPIRES Wednesday, 3 April, 2024
Permit Issued on Friday, October 6, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: () Date:
-4k
<11Y Gr
Federal Warr
THIS C-ARD IS TO RE-lI_JI\ ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 535-3050
Scheduled inspections ma-, be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
;read left to right. top to bottom). Please schedule inspections as appropriate, kX7ork mist not be co%: Bred until it is approv ed. Check ;i-ith your inspector :i,
'%ou are unsure about Inv of the inspections or the inspection sequence- On -going inspections are logged on the back of this card,
ELECTRICAL
LTFER Ground (4295)
❑
Ditch cover (4030)
❑
S1abiConcrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
B`•
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporan- Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
FeederslSub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling COVer (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
Q
Final - _lechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date Qac a3
PLUMBING
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
0
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date