23-104972City of Federal Way
L
Community Development Dept,
33325 8th Ave S
I ---
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: FOUBARE
Project Address: 36810 6TH AVE SW
Project Description: Install circuit, reconnect mini split to outlet.
Electrical
Permit #:23-104972-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 218820 0520
Owner
Applicant
Contractor
DONALD FOUBARE
GREENWOOD HEATING AND
GREENWOOD HEATING (ELECTRICAL)
36810 6TH AVE SW
ACGREENWOOD HEATING AND A/C
GREENHH7750H (9/8/25)
FEDERAL WAY WA 98023-7220
825 S STACY ST
SEATTLE WA 98134
825 S STACY ST
SEATTLE WA 98134
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Circuits - Residential
Electrical Fixtures
PERMIT EXPIRES Wednesday, 3 April, 2024
Permit Issued on Friday, October 6, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
A. "ng an t C' Y-QLFederal Way.
Owner or a ent: d D ate: 9
G /
C17Y OF •. .•
Federal Way
THIS CARD IS TO REAL -UN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (2_53) 835-3050
Scheduled inspections tna-; be failed if dais card is not on -site. DO NOT LOSE THIS C A. D_ Lispections are listed as close to sequential order as possible
i"read left to rn?ht. top to bottom), Please sch2drtle inspections as appropriate. Work nut not be co-.: ered until it is approv ed. Cneck -% ith your inspector if
you are unsure about an-.,,- of the inspections or the inspection sequence. (__)Hi -going inspections are logged on the back of this card.
ELECTRICAL
❑
LFER Ground (4295)
❑
Ditch cover (4030)
❑
SlabiConcrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
B`
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Ser-%ice (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
FeederslSub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Corer (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑
-Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - -Mechanical (4065)
Approved
Approved to release test
Approved
BS•
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
BY
Date