Loading...
23-102112City of Federal Ways Community Development Dept1 L 33325 8th Ave S ; Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: WALKER Project Address: 1122 SW 333RD ST Electrical Permit #:23-102112-00-EL Inspection Request Line: (253) 835-3050 Project Description: REPLACING AIR CONDITIONER AND GAS FURNACE Parcel Number: 926495 0850 Owner Applicant Contractor DARCELL WALKER SUSAN DUNHAMBLACK HILLS INC BLACK HILLS INC (ELECTRICAL) 1122 SW 333RD ST 1003 85TH AVE SE UNIT A BLACKHI919DL (3/15/25) FEDERAL WAY WA OLYMPIA WA 98501 1003 85TH AVE SE UNIT A 98023-5319 OLYMPIA WA 98501-5706 Is this an Online or O.T.C. application? Thermostat I 1 Additional Permit Information Yes Electrical Fixtures PERMIT EXPIRES Monday, 16 October, 2023 Permit Issued on Wednesday, April 19, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of a in t n and the City of Federal Way. Owner or agent: Date: NE 6;, k4l _N� CITY Of Federal Way THIS CARD IS TO RENUUN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) S35-3050 Scheduled inspections may: be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work unist not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL El By UFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date ❑ Pool Bonding (4195) ❑ Temporary Power (427) Q Service (4235) Approved Approved Approved By Date By Date B)- Date Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date E9 Final - Electrical (4055) Approved By Date ��✓f l F MECHANICAL Q lechanical Rough -in (4165) ❑ Gas Piping (4125) 0 Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING El Plumbing Groundwork (4190) 0 Rough Plumbing (4230) Q Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date