23-104679City of Federal Way
'
F
Community Development Dept,
F
33325 8[h Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: DUCICH
Project Address: 32226 7TH AVE SW
Project Description: HVAC- Install Furnace & HP/AC Swap
Mechanical
Permit #:23-104679-00-ME
Inspection Request Line: (253) 835-3050
Parcel Number: 926492 0090
Owner
Applicant
Contractor
DAN DUCICH
CRYSTAL WALTZALLRED HEATING
ALLRED HEATING COOLING ELECTRIC
32226 7TH AVE SW
COOLING ELECTRIC LLC
LLC (GENERAL)
FEDERAL WAY WA
505 "F" ST SE
ALLREHC899N3 (8/23/25)
98023-5523
AUBURN WA 98002
1020 S 344TH ST SUITE 205
FEDERAL WAY WA 98003
Additional Permit Information
Mechanical Work Valuation?, ........................... 1-— 7967 Is this an Online or O.T.C. application?.................. Yes
Mechanical Fixtures
Air Handling Units 1 Compressors / Heat Pumps
PERMIT EXPIRES Sunday, 17 March, 2024
Permit Issued on Tuesday, September 19, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
,. Washingto ; and,the City of Federal Way.
Owner or agent: I _ Date:
CITY Of
Federal Way
THIS CARD IS TO REM -Al\ ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
Scheduled inspections tna-; be :ailed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspection_ as appropriate Work unit not be co+:ered until it is appro,ed- Check .xith your inspector if
you are unsure about an -, of the inspections or the inspection sequence. (fin-?oing inspections are logged on the back of thS card -
ELECTRICAL
❑
By
DEER Ground (4295)
Approved
Date
❑
By
Ditch corer (4030)
Approved
Date
❑
By
SlablConcrete Floor (4255)
Approved to place concrete
Date
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
FeederslSub-panels (4043)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
BY
Date
By
Date
By
Date
El
Final - Electrical (405;)
Approved
By
Date
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (412-)
❑
Final -Mechanical (4065)
Approved
Approved to release test
Approved
Bv
Date
B}•
Date
B,%°
PLUMBING
0
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
El
Final - Plumbing (4075)
Approved to corer
Approved
Approved
By
Date
By
Date
By
Date