23-104680City of Federal Way
Community Development Dept
FILE
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: DUCICH
Project Address: 32226 7TH AVE SW
Project Description: HVAC- Install Furnace & HP/AC Swap
Electrical
Permit #:23-104680-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 926492 0090
Owner
Applicant
Contractor
DAN DUCICH
CRYSTAL WALTZALLRED HEATING
ALLRED HEATING COOLING ELECTRIC
32226 7TH AVE SW
COOLING ELECTRIC LLC
LLC (ELECTRICAL)
FEDERAL WAY WA
505 "F" ST SE
ALLREHC775LO (7/6/25)
98023-5523
AUBURN WA 98002
37816 26TH DR S
FEDERAL WAY WA 98003
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Circuits - Residential 2 Thermostat
PERMIT EXPIRES Sunday, 17 March, 2024
Permit Issued on Tuesday, September 19, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
USNUIN
ty of Federal Way.
Owner or agent: Date:
CITY Gr
Federal Way
THIS C LRD IS TO RE-IIM s ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-30:50
Scheduled inspections niv, be failed if this crud is not on -site. DO NOT LOSE TM$ ('.A-RD. Inspections are listed as close to sequential order as possible
('read le8 to right. too to bottom). Please schedule inspections as appropriate. Work niist not be co%ered until it is approved. Check -,. itlu your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are toe zed on the back of this card.
ELECTRICAL
Q
L-FER Ground (4295)
❑
Ditch cover (4030)
❑
SIablConcrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
PooI Bonding (4195)
❑
Temporary Power (4275)
❑
Seri -ice (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Corer (4020)
Approved
Approved
Approved
Bi-
Date
BS
Date
By
Date
Q
Final - Electrical (4055)
Approved
By
Date /01
MECHANICAL
❑
-Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - Mechanical (4065)
Approved
Approved to release test
Approved
Bx-
Date
By
Date
B-s
Date
PLUMBING
❑
Plumbing Groundwork (4190)
®
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date