Re: File #20-100170-PC, PREAPPLICATION CONFERENCE SUMMARY
Ellenos Milk Silos, 34114 21st Avenue South, Federal Way
Dear Mr. Percich:
CITY HALL
33325 8th Avenue South
Federal Way, WA 98003-6325
(253) 835-7000
www.cityoffederalway.com
Jim Ferrell, Mayor
February 27, 2020
Thank you for participating in the preapplication conference with the City of Federal Way's Development
Review Committee (DRC) held February 13, 2020. We hope that the information discussed at that meeting
was helpful in understanding the general requirements for your project as submitted.
This letter summarizes comments given to you at the meeting by the members of the DRC. The members
who reviewed your project and provided comments include staff from the city's Planning and Building
Divisions and Public Works Department, and representatives from Lakehaven Water and Sewer District and
South King Fire and Rescue. Some sections of the Federal Way Devised Code (FWRC) and relevant information
handouts are enclosed with this letter. Please be advised, this letter does not represent all applicable codes. In
preparing your formal application, please refer to the complete FWRC and other relevant codes for all
additional requirements that may apply to your project.
The key contact for your project is Senior Planner Stacey Welsh. You can contact me at 253-835-2634, or
stacgy.welsh@citvoffederalway.cnin. For specific technical questions about your project, please contact the
appropriate DRC representative as listed below. Otherwise, any general questions about the preapplication
and permitting process can be referred to me.
PROJECT DESCRIPTION
The proposal is to install three or four 9,600-gallon milk silos and a 400 square foot entry vestibule. The
project is proposed at 34114 2V Avenue South, on King County tax parcel 212104-9033.
MAJOR ISSUES
Outlined below is a summary of the major issues of your project based on the plans and information
submitted for preapplication review. These issues can change due to modifications and revisions in the plans.
The major issues section is only provided as a means to highlight critical requirements or issues. Please be
sure to read the comments made by all departments in the following section of this letter.
Planning Division: The project requires a Process III land use application with SEPA.
Building Division: New building codes take effect in July.
Mr. Gregg Percich
Page 2 of 6
February 27, 2020
DEPARTMENT COMMENTS
Outlined below -are the comments made by the representatives of each department present at the preapplication
conference. Each section shouldrbe redd-thoroughly. If you have questions, please contact the representative
listed for that section.
COMMUNITY DEVELOPMENT — PLANNING DIVISION
Stacey Welsh, 253-835-2634, stacey.welsh u�?ciryoffederalwaycom
1. Zoning De ignation and Use — The subject property is designated Commercial Enterprise (CE); the proposed
use is manufacturing/preparation of food products, which is a permitted use in the CE zone as listed
within and subject to the regulations set forth in the Use Zone Chart of FWRC 19.240.010.
2. State Environmental Policy Act (SEPA) — Pursuant to FWRC 14.15.030(1), the project is subject to
environmental review under the State Environmental Policy Act (SEPA), per WAC 197-11-800(2) (h) as it
exceeds the minor new construction exemption of installation of above -ground tanks having a total
capacity of 10;000 gallons or less. An environmental threshold determination made by the Director of
Community Development must be issued and the associated appeal period concluded prior to issuance of
a land use decision. Public notice will be required as established in FWRC Title 14.
3. Land Use Application — Per FWRC 19.15.030(3), improvements and/or additions to an existing developed
site that are not exempt from SEPA shall be processed under process III. Process III is a review process
conducted by city staff with a final decision issued by the Community Development Director. The
Process III decision criteria are contained in FWRC 19.65.100(2).
4. Land Use Review Timeframes — The Planning Division will notify the applicant of the application status
within 28 days of submittal. If the application is determined complete, staff will issue a Letter of
Complete Application. The FWRC limits the administrative review to 120 days from the date of a
complete application. The 120-day review period will stop any time the applicant has been requested by
the city to correct plans, perform required studies, or provide additional information needed to issue a
decision. The review period will begin within 14 days following submittal of requested items. Please be
advised that any request for corrections and/or additional information must be provided within 180 days
of written notification, or the land use application will expire.
5. Public Notice — Process III applications require a public notice and comment period. Within 14 days of
issuing the Letter of Complete Application, a Notice of Application will be published in the Federal Way
Mirror, posted on the subject property, placed at the city''s three designated notice boards, and mailed to
property owners within 300 feet of the subject property.
6. Land Use Application Submittal Requirements — Please refer to the enclosed Bulletin #001, "Submittal
Requirements for Use Process III or IV," to determine what materials must be submitted with the land
use application.
7. Effect of Use Process Decision — In accordance with FWRC 19.15.100(2), "Lapse of Approval - Generally,"
the applicant must substantially complete construction for the development activity, use of land, or other
actions approved; and complete the applicable conditions listed in the Use Process decision within five
years after the final decision of the city on the matter, or the decision becomes void. Provisions for
extension of time are contained within FWRC 19.15.110, "Lapse of Approval — Time Extension."
8. General Zoning Regulations —The use zone chart of FWRC 19.240.010 (enclosed) provides regulations for
the proposed use. The applicant should consult the referenced use zone chart prior to submitting a
20-100170-00-PC Doc ID:80049
Mr. Gregg Percich
Page 3 of 6
February 27, 2020
Master Land Use Application to verify all site components and proposed uses will comply with city code.
The following is only a portion of the zoning regulations governing the proposed use in the CE zone:
Manufacturing and production, general (preparation of food products) (FWRC 19.240.010)
Required Yards, Lot Coverage, Build hg Height, Parking — Required yards, lot coverage, building height,
and parking are:
i. Front/side/rear setback — 20'/15'/15'
ii. Maximum lot coverage — None; the buildable area will be determined by other site development
requirements.
iii. Maximum building height — 40-55 feet AABE. (See special regulations and notes #3 and #4
from the use zone chart.)
iv. Parking — One space for each 1,000 square feet of gross floor area. Additional square footage
proposed triggers additional required parking; however. based on the submitted site plan, it
appears that the site already has more parking spaces than are required by code.
Community Design Guidelines — Review of the proposal under the city's design guidelines, Chapter 19.115
FWRC, is required for the project and will occur in conjunction with the use process review. The
principal'applicable guidelines for the project are noted below. However, this does not necessarily include
all applicable guidelines, and project designers must consult the guidelines in their entirety in preparing an
application. The application must include a written narrative identifying how the proposal complies with
the applicable design guidelines as detailed.
(a) FWRC 19.115.010(2), CPTED — Implement Crime Prevention through Environmental Design
(CPTED) principles to reduce opportunities for criminal activities to occur. The city's Police
Department and Planning Division will evaluate the formal application and review for compliance
with CPTED principles. A completed CPTED checklist must be submitted with your application.
i. Natural Surveillance — Promote visibility of public spaces and areas.
ii. Access Control — Identify techniques that deter unauthorized access and/or inappropriate
access.
a Ownership — Reduce perception of areas as ownerless.
(b) FWIRC 19.115.050, Site Design — Refer to all sections of this chapter for design standards. Key
sections include:
i. (1) General criteria (f)-(g)
ii. (6) Commercial service (a)-(b)
Discussed at Meeting.
1. No new fencing or site lighting is proposed.
2. Applicant asked whether secondary spill containment is required. Staff passed the question on to
Pubic Works Development Services (stormwater) and the Lakehaven Water & Sewer District.
Lakehaven's response is contained in their comment section below. Public Works Development
Services staff stated that according to the King County Stormwater Pollution Prevention Manual, double -
walled stationary liquid storage tanks are exempt from having to provide secondary containment.
10. Outside Agency Permits —It is the applicant's responsibility to identify and obtain all required state, federal,
or other agency permits as may be required.
20-100170-00-PC Doc ID:80049
Mr. Gregg Percich
Page 4 of 6
February 27, 2020
11. Application Fees &Submittal —Please contact the Permit Center atyemutcenteaciWOffederaIwav,gm, or
253-835-2607, for updated fee schedule information for applications and permits.
PUBLIC WORKS — SOLID WASTE AND RECYCLING DIVISION
Rob Van Orsow, 253-835-2770, robe@citMoffe_deralway.com
Review FWRC 19.125.150 for solid waste and recycling design requirements. Help with many design parameters
related to service access is available via the city's contracted solid waste services provider, Waste Management.
COMMUNITY DEVELOPMENT — BUILDING DIVISION
Greg Kirk, (253) 835-2621, re .kir ci offederalwa .com
1. Buik ing Codes. The structure will be treated as a new building permit application and must meet all current
codes including:
• International Building Code (IBC), 2015
Washington State Amendments WAC 51-50
• International Mechanical Code (IMC), 2015
Washington State Amendments WAC 51-52
■ Uniform Plumbing Code (UPC), 2015
Washington State Amendments WAC 51-56
& WAC 51-57
• National Electric Code (NEC), 2014
• International Fire Code (IFC), 2015
Washington State Amendments WAC 51 -54
• AcwstbiAz , Code (ICC/ANSI Al17.1), 2009
• International Residential Code, 2015
Washington State Amendments WAC 51-51
• Washington State Energy Code, 2015 WAC 51-11
2. Budang Criteria. The following applies to the proposed structure:
• Occupancy Classification: N/A ■ Number of Stories: N/A
• Type of Construction: N/A • Fire Protection: N/A
• Floor Area: N/A
• Wind/Seismic: Basic wind speed 85 Mph, Exposure, 25# Snow load, Seismic Zone D-1
3. Building Permit Application Process. A completed building permit application and commercial checklist are
required. The commercial checklist will be filled out by staff and provided at the time of the land use
approval. Copies of application and checklist may be obtained on our web site at MnMK.dVOffederalway.com.
Appointments are required for intake of new commercial building permit submittals. Please contact Permit
Center staff to schedule an intake appointment at (253) 835-2607, or pernutcenter0citvoffederalwn�.�orn.
Some projects may require a third -party review or inspection. The cost to cover these fees is the
responsibility of the applicant. Any third -party fee is in addition to regular permit fees and costs.
Please note, land use approval is recommended prior to submitting the building permit application to
avoid delay in project review. If the project has not received land use approval, it may be placed on hold
until the land use review is completed.
20-100170-00-PC Doc ID:80049
Mr. Gregg Percich
Page 5 of 6
February 27, 2020
4. Review Timing. Federal Way reviews plans on a first in, first out basis; however, there are some small
projects with inconsequential review requirements that may be reviewed out of order.
The first comment letter can be expected within five to seven weeks of the submittal date., Re -check of
plans will occur in one to three weeks after re -submittal.
Revised or resubmitted plans shall be provided in the same format, size, and amount as the originally
submitted plans. Revised/resubmitted drawings shall indicate by means of clouding or written response,
what changes have been made from the original drawings. Plans for all involved departments will be
forwarded from the Community Development Department.
5. Other Permits &Inipections. Separate permits maybe required for electrical, mechanical, plumbing, fire
suppression systems, and signs. Applicants may apply for separate permits at any time prior to
commencement of construction.
When required, special inspections shall be performed by WABO approved agencies, or by agencies
approved by the building official prior to permit issuance. Construction must be approved by all
reviewing departments prior to final building division inspection.
All concerned departments (planning, public works, electrical, & fire) must sign off before the Building
Division can final the structure for occupancy. Building final must be approved prior to the issuance of a
Certificate of Occupancy.
Construction projects may be required to have a pre -construction conference. If a pre -con meeting is
required, the general or representative, all subs, the architect or representative, the engineer or
representative, electrical contractor, and any other interested party, should attend this meeting. Meetings
will occur at the Building Division and will be scheduled by the inspector of record for the project.
6. Site -Specific Requirements.
■ The building permit will require engineering for the tanks (foundation, seismic, tank support).
+ A separate electrical permit is required.
• Provide refrigeration specs.
The information provided is based on limited plans and information. The comments provided are
not intended to be a complete plan review and further comments are possible at time of building
permit plan review.
LAKEHAVEN WATER AND SEWER DISTRICT
Brian Asbury, 253-946-5407, BAsbury cQlakehaven.or�
Lakehaven has no other comment on this application/project, as based on the submittal it appears no existing
and/or future water/sewer system facilities will be required, desired, or affected by the proposed land use
action. If any water or sewer utility conflicts are encountered, the applicant should promptly contact
Lakehaven for additional information.
20-100170-00-PC Doc ID:80049
Mr. Gregg Percich
Page 6 of 6
February 27, 2020
Utility conflicts should be identified and coordination (if necessary); which should occur as early as possible
in the planning process. The project will need to avoid encroachment with existing Lakehaven system
facilities and easements (including any setbacks necessary for structural foundation load zones), in the event
the footprint of the new tanks starts coming too close to the existing water main on the site.
SOUTH KING FIRE AND RESCUE
Sean Nichols, 253-946-7242, se2Ln.nichols@southldngffre.org
No Fire Department comments; contact SKFR if you have any questions.
CLOSING
This letter reflects the information provided at the preapplication meeting and is intended to assist you in
preparing plans and materials for the formal application. We hope you found the comments useful to your
project. We have made every effort to identify major issues to eliminate surprises during the city's review of
the formal application. The completion of the preapplication process in the content of this letter does not vest
any future project application. Comments in this letter are only valid for one year as per FWRC 19.40.070(4).
This is a preliminary review only and does not take the place of the full review that will follow submission of
a formal application. Comments provided in this letter are based on preapplication materials submitted.
Modifications and revisions to the project as presented for this preapplication may influence and modify
information regarding development requirements outlined above. In addition 'to this preapplication letter,
please examine the complete FWRC and other relevant codes carefully. Requirements that are found in the
codes that are not addressed in this letter are still required for your project.
If you have questions about an individual comment, please contact the appropriate department representative
noted above. Any general questions can be directed towards me, the key project contact, Stacey Welsh, at
253-835-2634, or stacev.welsh cityofedetalrvay.com. We look forward to working with you.
Sincerely,
Stacey Welsh, AICP
Senior Planner
enc: Bulletin 001 "Process III or IV Submittal Requirements"
Bulletin 003 "Master Land Use Application"
Bulletin 050 "SEPA Environmental Checklist"
Bulletin 002 "Mailing Labels"
Bulletin 021 "CPTED Checklist Instructions"
Bulletin 022 "CPTED Checklist"
FWRC 19.240.010
Lakehaven Map
c: Greg Kirk, Plans Examiner
Brian Asbury, Lakehaven Water & Sewer District
Sean Nichols, South King Fire & Rescue
Brian Bright, Ellenos Yogurt, 34114 21st Avenue South, Federal Way, WA 98008, brian,l>rlg tt [ el3enn,_c<�m
20-100170-00-PC Doc ID:80049
CITY OF FEDERAL WAY
DEVELOPMENT REVIEW COMMITTEE (DRC)
PREAPPLICATION CONFERENCE SIGN -IN SHEET
Ellenos Milk Silos
20400170-PC
February 13, 2020
NAME
WITH
PHONE
Stacey Welsh
Community Development -Planning
253-835-2634
� U q
A OS
0 -Sso
Zo L_t
V_"V4
\RU&:.P �-
3 3S- U
2-/ 2-Zoe
14. .s►• L
.Aid' i 'i • f R� ^ t-7� i.�i.r •L'r'/+ j.
All
o
NO
00 le.,Ea� th
.E
2020 Google c:. � 200 ft
1/17/2020 _ags_c67d98f65b634el68bdl460640771d5b.r--(800x600)
0 IF
3 V �'•
i as - • . 71
https://gismaps.kingcounty.gov/arcgis/rest/directories/arcgisoutputIPrinting/PrintingService_GPServer/_ags_c67d98f65b634el68bd1460640771d5b.png 1/1
_ CITY OF CITY HALL
33325 8th Avenue South
Federal Way Federal Way, WA 98003-6325
(253) 835-7000
Centered on Opportunity www.cityoffederalway.com
Jim Ferrell, Mayor
January 17, 2020
Mr. Gregg Percich
Jackson Main Architecture
311 1,1 Avenue South.
Seattle, WA 98104
Re: File #20-100170-PC; PREAPPLICATION CONFERENCE SCHEDULED
ELLENOS MILK SILOS, 34114 215, Avenue South, Federal Way
Dear Mr. Percich:
The Communit Development Department is in receipt of your preapplication conference request. The
application has been routed to members of the Development Review Committee (DRC) and a meeting Nvit:l.,
the: project applicant has been scheduled as follows:
10:00 a.m. — Thursday, February 6, 2020
rlylebos Conference Room
Federal Way City I Iall, 2nd Floor
33325 8,h Avenue South
Federal Way, WA 98003
NXIc look forward to meeting with you. Please coordinate directly with anyone else you would like to attend
the meeting as this will be the only notice sent by the departinent. If you have any questions regarding the
meeting, please contact me at stacev.vvi&�Ii(e cit e,f'ti �lr� ialu n .corn, or 253-835-2634.
Sincerely,
Stacey Welsh, AICP
Senior Planner
c: I?llcnos ]'ogurt, 34114 21" .1vc ti., I'cJcr:d ]X ar, G<"� '13003
20-100170-00-PC Doc ID 8001S
CITY OF FEDERAL WAY
COMMUNITY DEVELOPMENT DEPARTMENT
DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL
DATE: 1-17-20
TO: Cole Elliott, Development Services Manager
Scott Sproul, Building Official
Rick Perez, City Traffic Engineer
Brian Asbury, Lakehaven Water & Sewer District
Chris Cahan, South King Fire & Rescue
FROM: 'Stacey Welsh, Senior Planner
FOR DRC MTG. ON: 1-30-20 - Internal
2-,6--20, 10:00 - with applicant
.13..................................................
FILE NUMBER(s): 20-100170-PC
RELATED FILE NOS.: 16-105223-CO
PROJECT NAME: ELLENOS MILK SILOS
PROJECT ADDRESS: 34114 21ST AVE S
PARCEL: 2121049033
ZONING DISTRICT: CE
PROJECT DESCRIPTION: Proposal to install 3 milk storage tanks.
LAND USE PERMITS: Use Process III & SEPA
PROJECT CONTACT: Gregg Percich
Jackson Main Architecture
311 lst Ave S
Seattle, WA 98104
gregg.percich@jacksonmain.com 206-324-4800
MATERIALS SUBMITTED: Master Land Use Application
Written Narrative
Site Photo
Vicinity Map/Aerial Photo
Conceptual Site Plan
Stacey Welsh
From: Larz Hitchcock <Larz.Hitchcock@jacksonmain.com>
Sent: Thursday, January 16, 2020 2:20 PM
To: Stacey Welsh
Cc: Gregg Percich
Subject: RE: Ellenos milk Silos
Attachments: PSM DWG - Ellenos Yogurt Milk Silo Tank Pad 2017-11-01.pdf
Stacey
The picture shows the existing —the proposed are to be identical to those.
Not sure who put 70' (a 7-story tower of milk would be impressive! But no - not on this project).
The attached older Structural design shows two towers at 28' which is probably the most accurate dimension for them.
Note current design is proposing three.
Don't hesitate to contact me with any other questions, comments or considerations.
FYI- I will be out of office Jan 23rd- Feb 10th
Gregg Percich is PIC and is familiar with this project (cc'd)
Larz Hitchcock ARCHITECT, NCARB, LEED AP
Senior Project Manager
1 J�
JACKSON I MAIN Architecture, P.S.
311 First Avenue South
Seattle, Washington 98104
206.324.4800 P
www.j a c ks_on mai n .co m
From: Stacey Welsh <Stacey.Welsh@cityoffederalway.com>
Sent: Thursday, January 16, 2020 2:07 PM
To: Larz Hitchcock<Larz.Hitchcock@jacksonmain.com>
Subject: RE: Ellenos milk Silos
H i La rz,
I received your Pre -Application Meeting submittal and have two questions before I get it routed to our reviewers. What
is the proposed height of the tanks? The application form says 70' but it was entered into the system as 35'. Secondly,
what is the picture showing, existing conditions or?
Thanks,
Stacey Welsh, AICP
Senior Planner
£RY 4f
Federal Way
33325 8th Avenue South
Federal Way, WA 98003-6325
Phone: 253/835-2634
www, cityoffede ra lway.co m
4
A" SLO IAW PAD
sEcnm
slA r- 1 Ier , i'•Q'
SECTOGN O
--ALE, I Irj' • 1,7
B F EACH W O
01
C
AE' C°ND,
l .Qwi sO14wELDCW+OWCWI,jti[q,I ,ac 1 ) CLPANELJOINi a+aut. � EOF ECONC WALL -,I NALL
e;EAT
PANEL
JOIM
_
CAL CONN TO IEICONC W11�1%"0
ANCHORS AT2U'OC
(7; E.—)
HEADER CONN TO IEI CONC WALL
WI I2I KO HILTI KB-R ANCHORS
AT1'<-OCI�-EMBE01
e,k
� r1M�i
1m f•fiA
—
•ICD%1
...c PBH 15x!
L j
r.�• 1 j k 7-N3'i' � I r• fTreM'f, illl
,vclvr, +3-r
FEx mar
nasa�
Fci �u1
DETAL
SCALE, I 1T2* 1•-0'
DETAL (W-AI2 Pffla JOINT 1 DEIAL
ccA E 1 117• • t .❑ 3 SCALE• 1 117 I •0' 4.
0
name: 3t"7 C
HOOKICI RS
,'4'L C K
A HOOKEDBARB
B- B
EMgelS PL
1 �i,votLOlA11
VeW DUAL
A
DETAL 5 DETAL b DUAL
SCALE: I Wr • 1'•q SCALE: I Ir7• - T'•{y 5CizE• I t17 • I' -Or
i
HARTHORNE
HAGEN
ARCHffECTS
1725 alh A,e N
Se0111e. M/ofniny]on yet C9
7dfif1A5- 3555
r
AT FULL SCALE
II not I nth, This drmng
has been reproduced, and
PLAN, tLtVA IIUN,
SECTIONS AND
DETAILS
Pap' clNa Isl+%-OOQ
ore- v-
L11afe6 4:75
Oale NOV 01, 7017
Reis
PSM CONSULTING ENGINEERS, INC. C
2200 SIXTH AVENUEi SURE 601 <
SEATfLE. WA 98121 V) Sh-L S2.0
P: 206,622A590 F. 206.622,0422
_. ps—glnaerz, com
nc rrAlwim; Imm ,Rlr H— ..4t sclrr
CODE INTERNATIONAL BUILDING CODE IRE (2015)
:� WINO LOADS BASIC WIND SPECD, V� = 11OMPN
RISK GIEWF II
WHO EXPOSURE: 10
EARTFOLANSE LOOS SEISMIC RISK OCCUPANCY CATEGORY II
SEISMIC IMPORTANCE FACTOR, lV = 1 Go
PPED 9 ELERATIONS, Se = 128 51 = D<9
SITE CUSS = D
DESIGN ACCELERATIONS, Sol = 085 SO = 050
SEISMIC DESIGN J%: CATEGOD
BASIC SEISMIC FORCE RESISTING SYSTEM FLAT-BOTTONEO TANKS MECHANICALLY ANCHORED
DUST BASE SHEAR = N 2KES
SEISMIC RESPONSE COEFFICIENT, Cs = 0 2B5
AFSPONSE MODIFICATION FACTOR, R = 30
ANALYSIS PROCEDURE USED STATIC LATERAL LOAD PNOCCOURE
�M !� fd
SHOP NSNELN SHALL BE SUBMITTED FOR REVIEW PRIOR F SHOP
SHOP DRAWING SUBMITTALSTHCON( PROCESSED M
THE ENS IS ARE NOT CHANGE THAT
THE
THE PURPOSE OF SHOP DS THE SUBN11CON BY THE INDIAING HI TO
DEMONSTRATE TO THE ENGINEER THAT THE D INSTALLED-
-ANERSTnx ECL THE DESIGN CONCEPT, BY IATION G WHICH
IJAIEAIAL IS INTENDED TO BE FURNISHED D CRE NSTALLE OR CO M AMBLING THE MENDED VG SUB ION ANO
Cc NTRACT D METHODS IF DEVIATIONS- DISCRER PCIES, OR CONFLICTS BETWEEN INGP DRAWING SME PROCESSED
AND THE
THE END DOCUMENTS ARE DRAWINGS
ED SPECIFICATIONS
PRICK ID OR ALTER SHOP DRAWING SHALL
BU ROLL ME PAWESSEO M
THE
W ISF R THE DESIGN pRAWNGS AND ON Y. THIS
REVIEW
SHALL CONTROL K DI SNAIL BE R OLA TI SUBMITTAL
REVIEW IS FOR GENERAL CONFORMANCE ONLY, MS PEv1ESW GOES NOT (•SCAN DIMENSIONS OR OVANIITES
MUMUM SOIL PRESSURE 1500 PSF EXTENSOR FOOTINGS SHALL BEAR 1'-6" (MINIMUM) BELOW FINISH GRADE ALL
FOOTINGS TO BEAR ON ARM UNDISTURBED EARTH BELOW ORGANIC• SURFACE SOBS AND $HALL BE LOWERED IF
SUITABLE SOIL IS NOT FOUND AI ELEVATIONS SHOWN ON DRAWINGS
{
ALL CAST -IN -PUCE COWREIE SHALL BE WITH THE EXPOSURE CATEGORIES, WATER -CEMENT RA110S, ENTRAJNED AIR
AND MINIMUM 28-DAY COMPRESSIVE STRENGTHS AS INDICATED IN THE CONCRETE SCHEDULE ON THIS SHLEI
ELEMENTS EXPOSURE GfCGOM w/r ALP ITC
SUB ON GRACE EXFDSEO TO WEATHER F2 SO C2 OA 7 Soon
CONCRETE MIX DESIGNS FOR ALL CONCRETE ELEMENTS SHALL COMPLY WITH 5ECTIDN 19 3 OF AC1318-IA SOLD ON
THE EXPOSURE CATEGORIES LISTED N THE ABOVE TABLE NO CALCIUM CHLORIDE SHALL BE USED N ANY CON_IYETE
ALL ABLE R LNG BANS FEMALE TI NEW BILLET 10 AS AS TM A615, GRADE fin CONFIRMING M ACT 318 SECTION 20 225
WELDABLE AEINFOACINC BARS SHA1L CONFIRM 10 ASIu A706
ALL CONCRETE REINFORCEMENT SMALL BE DETAILED, FARRIGIED, LABELED, SUPPORTED, SPACED IN FORMS AND
SECURES N PLACE N ACCORDANCE YAM THE PROCEDURES AND AECHNEMENTS OUTLINED N THE LATEST EDITOR OF
ALI 318 AND THE "WNDAL Or STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES. ACI 315
THE LONIRACIOR SHALL SUBMIT CHECKED SHOP DRAWINGS SNOWING REINFORCING DETAILS, INCLUDING STEEL SIZES
SPACING, PLACEMENT AND SUPPORT DETAILS AND TRACER AT EXPANSION JOINTS FOR REVIEW PR'.R TO TMACRII0x
ALL REINFORCING SPLICES SHALL CONFORM f0 THE REOUTACMENIS OF LATEST EOIODN OF 91 318 AND THE SPLICE
TABLE INCLUDED IN THE STRUCTURAL DOCUMENTS UNO ALL WWR SHALL BE UPPED IN (2) FULL MESH PANELS AND
TIED SECURELY
BAR SUPPORTS IN CONTACT WITH EXP05ED SURFACES SHALL BE PLASTIC TIPPED
THE SPECIFIED COMPETE COVER FOR REINFORCEMENT SHAH Nor BE LESS THAN THE FOLLOWING UNLESS URGER
COVER IS NOTED ELSEWHERE
•CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED 10 EARTH 3 IN
•CONCRETE EXPOSED 10 EARTH OR WEATHER 16 TIHOUGI J18 BASS 2 IN
15 BAR w31, OR D31 WIPE AND SMALLER 1-1/2 IN
IO�Q 7G'EIL�Aa•
.[RE EXPANSION HORI ARE
ARE C TIED. S USE -HIED KWIK MOLT II' (REFERENCE TCC REPORT 113) 1])
WHERE SCAEw ANCHORS ATE SPEC TIED. USE "51MPSOx 1TEN ND (REFERENCE JCL REPORT ESR-2713)
WHERE EPDXY ANCTI ARE SPECIFIED, USE "HILL HY-200" OP -SIMPSON SET-XP"(REFERENCE IOC REPORT
ESR-3107 AND ESR-250B)
'H 1L11 HII-RE 500 AND "SIMPSDN SET -MAY NOT BE USED, UNLESS 5PECIFICAIIY PRE-APPROEO BY THE
STRUCTURAL ENGINEER
FOR EPDXY ANCHORS, USE ASIM A193 GRACE 97 1REAOED ROD, UNLESS OTHERWISE NOTED HOLES MUST BE
CLEANED OF DUST AND DEBRIS AND BE FREE OF STANDING WRIER WHEN EPDXY IS INSIALLED SPECIAL INSPECTION
OF EPDXY ANCHORS 15 REQUIRED Do ACT CUT ANY RLINFOACIAC BARS TO INSTALL ANCHORS DEFECTINL HOLES
SHALL BE FILLED SOLID WITH EPDXY
FOR AM """'LION$ TO INE ABOVE, THE LONIPACTOR SHALL SUBMIT TO THE 11ACH.W ENGINEER
NAUEA NCTURER 5 LITERATURE DESCRIBING THE ANCHORS AND LISTING IOC APPROVED ALLOWABLE SHEAR AND TENSION
VALUES
yAT,[ ap.rRlq ryMNpL{ Alp LgvW[S MFOP UP TO IN YEARS AFTFR CONSTRUCTOR, ENGINEER
RECOMMENDS A CRACK REPAIR AND MAINTENANCE :mOGRAM BE IMPLEMENTED FOR T,GSE SIMS EXPOSED To MIER
OR CHEMICALS If IS COMUDN FOR CRACKING DUE TO SHORTENING TO OCCUR THESE CRACKS CO NOT NORMALLY
MAIN THE I AL'CIURAL INTEGAIN OF IIE SUB HEADER THESE SUSS SHOULD HAVE A ONE-TIME CRACK
MAI rENANCE OPERATES, WHICH CONSISTS or
IINERECTIO.N OF SUBS AND SUPPORRNL MEMBERS TWO YEARS AFTER COxSIRUETTCN
DETERMINE CRACKS TO BE REPAIRED
�REPNANG CRACKS
THE To LENGTH OF CRACKING CAN BE TOWED AT W9 FEET OF CRACKS PAR SO/FI OF SUB AREA THE
OWNER SHOULD RESERVE FUNDS ACT THIS ONE TIME MAINTENANCE PROGRAM, 'WHICH 15 TO FAKE PUCE TWO YEARS
AFTER THE COMPLETION OF CONSTRUCTION
EVEN THOUGH CRACKING 15 NORMAL AND MOST OFTEN Nor STRUCTURALLY SIGNIFICANT• WHEN CRACKING OCCURS
DURINC CONSTRUCTION THE CONIRALTOA STALL CONTACT TIC MCIIITLCT/CNGINCCn FOR REVIEW THE CONTRACTOR
SHOULD ELI ODA FT OF EPDXY INJECTED CRACK REPAIR PER SO/FI OF THE SUB
WOE FLANGE SHAPES ToD PLATES
ABE NEW A31
CHANNELS, ANGLES, AND PUA53 IQ BE A51M A} J S fiKSI
PIPE COLUMNS HELIUM BE ASTM AS}. GRACE R, M=3]NSI
HSS RRIC OUNDTRU AND 5HUARE STRUCTURAL TUBE IO BE OTM A500. GRADE B tt.afiN51
xS5 ROUND STRUCTURAL TUBE 10 BE ASIM OW, CAGE d, FY=42N SI
ALL STEEL EXCEPT STEEL EMBEDDED IN CON_?EIE SHALL BE GIVEN ONE SHOP COAT OF AP-RCVED PAINT
WELLS TO BE 3/15 MINIMUM CONTINUOUS FILLET, BY CERTIFIED NELDEFS USING E70XX ELECTRODES
ALL 'WELDING SHALL BE PERFORMED IN STRICT ADHERENCE to A 'WRITTEN 'WELDING PROCEDURE
SPECIFICANOR (ANSI PER Arr DI 1 ALL WELDING PARAUCIERS SHALL BE WITHIN THE ELI INSIDE MANUFACTURERS
RECOMMENOATIONE NEL➢INL PROCEDURES SMALL BE SUBMITTED TO THE OWNERS TESTING AGENCY FOR REVIEW
READ STARTING FABRICATION OR ERECTIONS COPIES OF THE APE SHALL BE ON SITE AND WHOLE TO ALL
WELDERS AND THE 5PCCML INSPECTOR
STEEL 10 STEEL GO LED CONNECTIONS ARE SHOWN to OE 1KSC &TYPB mMfyl�.Iy19y AJM ftF& wdle
NAFAM .4UW a 4 94
G WBFW/ +*g M 9j'q a[A XDA lift AlitWtoOTI fM
BEARING [al[SFQ AND BOLTS SMALL BE TIGHTENED TO SNUG -TIGHT CONDITION
ANCHOR BOLTS EMBEDDED IN CONCRETE OR MASONRY ARE A5TM F1554 GRADE 36, UNLESS OTHERWISE NOTED USE
HEADED ANCHOR BOILS, NOT J BOLTS DO .NOT ENLARGE HOLES IN BASE PULE BY B, +vING BENDING OF ANCHOR
8OUR 15 PERMITTED ONLY WITH THE FLOOR APPROVAL FROM THE ENGINEER
WHERE NOT SPECIFICALLY SHOWN M DETAV, CONNECTIONS SHALL BE BOLTED FRAME BEAU CONNECTIONS PER ALSO
STANDARDS
DURING ERECTION. STRUCTURAL STEEL SHALL BE SECURED FROM COLLAPSING WITH IENPOPAM BRACING
SUBMIT SHOP ORININGS PREPARED BY AN EXPERIENFEo CETAILEA FOR RENEW PRIOR To ANPHICATIQN SHOP
DRAWINGE To BE COMPLETE, SHOWING ALL WELDS AND UATENAL GROSS .NTNDE A PUN LOCATION OR DETAIL
REFERENCE FOR EACH SHOP DRAWING FOR MINOR STCEL-TO-STEEL CONNECTIONS OF 12"AHD SMALLER STEEL
MEMBERS IF AN EXPLICIT CONNECTION IS HOT SHOWN ON THE STRUCTURAL DRAWINGS GENII EA IS to PU3POSE A
CONNECTION SIMILAR TO THE CONNECTIONS ON 1NE DRAWINGS OR PER ,MSC STANDARD CONNECTIONS ON THE SHOP
DRAWING, CLOUD THE CONNECTION AND STATE VERIN SHOP DRAWINGS NOT MEETING THESE CONDITIONS 'MILL =T
REJECTED REVIEW Or SHOP DRAWINGS BY THE EN -.VEER IS FOR DESIGN INTENT ONLY AND WEE NOT INCLUDE
vEAIFICAIIDx OF a VERSIONS AND CLARIFIES'A RI:ICATION OF DIMENSIONS AND QUANTITIES ARE THE RESPONSIBILITY
OF THE CONTRAL
STEEL FABRICATORS AND )STALER', BASE 81D TO INCLUDE STEEL DEIAILER AND FABRICATOR TIME AND COS > FOR
F3UTINE CONSTRUCTION QUESTIGNS AOUTNE CONSTRLONG' QUESTIONS INCLUDE DIMENSIONAL DN[STONS AND MINOR
'HALING QUESTIONS ROUTINE CONSTRUCTION QUESTIONS ARE PART or THE NORMAL CONSTRUCTION PROCESS - AND
ARE TO BE INCLUDED 1N THE BASE BID
GENERAL NOTES
Mf SI PUC IUBLL ENLINEER'HAS PERrOAMORE STRUCTURAL DESIGN AND PREPARED THE STRUCTURAL INCHING
DRAWINGS FOR THIS PROJECI THE CONSTRUCf1DN MUST BE PERFORMED IN STRICT ACCORDANCE IN THE
SIRUCTURAL DRAWINGS ANY DEVIATION FROM THE DRAWINGS MUST BE APPROVED IN WRITING BY THE STRUCTURAL
ENGINEER ERRORS AND/OR OMISSIONS FOUND DN THE STRUCTURAL DRAWINGS MUST BE BROUGHT TO THE
5 RECTUM ENGINEER'S ATTENTION IMMEDIATELY
IRONIC TURAL DRAWINGS ARE THE PRIME CONTRACT DRAWINGS STRUCTURAL DRAWINGS SHALL BE USED IN
CONJUNCTION WITH ARCHITECTURAL DRAWINGS PRIMARY STRUCTURAL ELEMENTS ARE DIMENSIONED ON lHE STRUCTURAL
PUNS AND DETAILS THE CENTRAL CONTRACTOR SHALL VERIFY AND COORDINATE DIMENSIONS AMONG ALL DRAWINGS
ANY DISCREPANCIES CONTRADICHONS OR OMISSIONS SHALL BE REPORTED TO THE ARCHITECT Fon RESOLUTION PRIOR
TO PROCEEDING WITH WORK OR FABRICATION Or THE ITEM(S) IN ONESTION
THE STRUCTURAL ENGINEER IS RESPONSIBLE FOR THE DESIGN OF THE PRIMARY STRUCTURAL SYSTEM, EXCEPT FOR
ANY COMPONENTS NOTED ABOVE RESPONSIBILITY FOR ANY SECONDARY STRUCT-1. A40 NON-STRUCTURAL SYSTEMS
NOT SHOWN ON THE STRUCTURAL PUNS PESTS WIN SOMEONE OTHER THAN THE STRUCTURAL ENGINEER
THE STRUCTURE SHOWN ON THESE DRAWINGS IS STRUCTURALLY SOUND ONLY IN ITS COMPLETED FORM THE
CONIFA[TOR SHALL PRONCE ALL NECESSARY OWN, To ST41LIZE THE BUILDING DURING CONSTRUCTION
THE STRUCTURAL ENGINEER IS NOT RESPONSIBLE FOR, AND WILL NOT MOVE CONTROL OF, CONSTRUCTION MEANS
NETHOM, TECHNNLES, SEQUENCES OR PROCEDURES- OR FOR SAFETY PRECAUTIONS AND FIOGRAMS IN CONNECTION
WITH THE CONSTRUCTION WORK- NOR WILL HE BE RESPONSIBLE FOR THE CONIRACTOPS FUTURE TO CARRY OUT THE
CONSTRUCTION WORK IN ACCORDANCE WITH THE CONTRACT GoCURENTS
FIELD MENSUREMENTS AND THE VERIFICATION OF FIELD DIMENSIONS ARE No[ PART OF THE STRUCTURAL ENGINEERS
RESPONSIPIUry THE CONTRACTOR M151 CHECK ALL (ASSUMED) EXISTING CONDITIONS SHOWN ON THESE DRAWINGS
FOR ACCURACY AND NOTIFY THE STRUCTURAL ENGINEER OF ANY DISCREPANCIES
OMISSIONS FROM THE ORAWNGS OR SPECIFICANDNS OR THE INADVERTENT MISLABELING OF DETAILS OF WORK WNICH
ARE MANIFESTLY NECESSARY TO GPM OUT THE INTENT OF THE DRAWINGS AND SPECIFICATIONS, OR WHICH ARE
CUSIOMARILY PERFORMED, SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED OR INAWERIENT
MSTAR ELED DETAILS or THE WORK BUT THEY SHALL BE PERFORMED AS IF FULLY AND CORRECTLY SET FORTH AND
DESCRIBED IN ME DRAWINGS AND SPECIFICATIONS
9ECFLL FY9[EFEb1 ��E
QIIIMG I®fCldll Trulelld Ab tms n mlr�� m�Ime`
wmr xfLrpq[NI Ha.tipA URXW
f
NCI JIB CH 2O tS 2 25 J
>M u
M9A
gll[Lr [glv[W ry[,i M WlC3'JN h+Ck4
o J4 RX]j
Lr W wG
ALI JIA IIT2 A
CI[VAO$ V MISS( 45LAAd11 ICN.M t�CB
4CWOI{NL f6 ,W 1A1$V AN�'ii rr gr y}�.
RENfll
ri]/
N!IIlf :Y 7 Ae0.WEp s50M IrC p! r t!N >'SE
Ap 11f p 11 jiA
1Cf L 3gA1 K12II ll(y-E
PRIOR lO CONCRETE PLACEMENT, FADE- SPECIMENS FOR STRENGTH
IESIS, PREFORM SLUVP AND AIR CONTENT ICBM AND D[r[AMNE
I
ASM C172
4. FLIT
I900 10
NClrK ]WT]NJAAA.S 'J ]lane IaIIT[ "IC,3MII IWa .POI
b 111 %]j•K31
A%{f
C[i[g1Lt7A rqR 4.Mi. UDGm—LgWSCY.3 9TwPNi
MENNAR BENG FORMED
1
ACI JIY'Z6 rcTi(9j
or WILD rALEP S
WAGRk VTH
PA110N
0 IRS
IO[NTFICAIgN VMNINLS Tp [DVfOAM Ip IRS SPECIFICATION
1
AISL 36o S[C LION A15 AND
N INE AWRWED CQu (RUCTION DOCUMENTS
WRCA�[ qS Y pprLvm
IRSPcSrgR (R WELDING
COMPLETE AND PARML PENETRATION GROVE WELDS
X
MS ON 1
1704 3 1
j PLUG AND/OVA SHOT WELDS
X
X
3 SINGLE PASS FILLET WELDS < S/HE'
A
K
SHOP 5R,,'cAm 51FEL
STRUCTURAL STEEL ELEMENTS FABRICATED AT SHOP WHICH 6 FULLY NSC
NOI AEOMREO
NOT REQUIRED
1IPP 25
QiTWEQ fgpvft M6- mincnu ITS
IWECTI N 9AY - Iw - -- � -
s[ tl�+CH if }'Qa IIC:aI
iF121 if
INSPECIIWS IN SHOP
HARTHOPM
HACEN
ARCHITECTS
1725 BUT, AVe N
Seattle, Washington 98109
206/285-3555
PRELIMINARY
1-
AT FULL SCALE
11 no1 I lI this drawing
has been reproduced, and
IS not at posted scale
GENERAL NOTES
AND SPECIAL
INSPECTIONS
N.locl Ne. 161ej-07a2
aro.11 me
OAMI u'—
Bole 11a4 al. 2017
Revisions
PSM CONSULTING ENGINEERS, INC. C
2200 SIXTH AVENUE. SUITE 601 ' ^
SEATT9LE, WA 121 v I Sheet SLo
P: 206. 22.4590 1: 206,622.0422
Nvnrv.Psm-en9lne ers,com
MASTER LAND USE APPLICATION
A: RECEIVED DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES
33325 8`h Avenue South
CITY OF nr7��� Federal Way, WA 98003-6325
Federal Way
�A� � � 2oLY 253-835-2607; Fax 253-835-2609
wwwxityofrederal�vay_ci n
CITY OF FEDERALWAY
COMMUNITY DEVELOPMENT
APPLICATION NO(s) A00 / 70 � R� Date .
Project Name
Property Address/Location S�
Parcel Number(s)
Project Description c
PLEASE PRINT
Type of Permit Required
Annexation
Binding Site Plan
Boundary Line Adjustment
Comp Plan/Rezone
Land Surface Modification
Lot Line Elimination
Preapplication Conference
Process I (Director's Approval)
Process II (Site Plan Review)
Process III (Project Approval)
Process IV (Hearing Examiner's Decision)
Process V (Quasi -Judicial Rezone)
Process VI
_ SEPA w/Project
SEPA Only
Shoreline: Variance/Conditional Use
Short Subdivision
Subdivision
Variance: Commercial/Residential
Required Information
C_ I e C__ Zoning Designation
G Comprehensive Plan Designation
Value of Existing Improvements
Value of Proposed Improvements
International Building Code (IBC):
Occupancy Type
.a Construction Type
Applicant
Name: ?WC-1G CCj+
Address: StL Or /-)-Jc:;, lj
City/State: SC_A,TrL!C_, WA,
Zip: 416
Phone: p &2-ut 1_. 0
_'ate'
Email: et/ CA CIA Lq 6 GC yj l�l CbN'L
Signatur ►}
Agent (if different than Applicant)
Name: LYL G;Z 0�
Address: 3H [ yL+ 2tis['
City/State:� WA5 f�l OR•
P one: Oleo, to b
Fax: 'L�Co SC1o"off
Email:,IZ,t
Signature:
Owner
Name:
Address:
City/State:
Zip:
Phone:
Fax:
Email:
Signature:
Bulletin #003 — January 1, 2011
Page 1 of 1
k:\Handouts\Master Land Use Application
JACKSON I MAIN
ARCH ITECTUR E
January 13T", 2020
To the City of Federal Way
33325 8t" Avenue South
Federal Way, WA 98003-6325
RECEDED
JAN 14 2020
CITY OF FEDERAL WAY
COMMUNfTY DEVELOPMENT
RE: Written Narrative as Required for Pre -Application Conference
Project: Ellanos Milk Silo Addition
Address: 34114 2V Ave S. Federal Way, WA
Narrative:
1
This project is the addition of three (3) 9,600-gallon milk silos and a small (400sf) entry vestibule
to this area of the building for the Ellenos Yogurt company. Width the exception of the area of
impact for the above -mentioned work there is no changes or alterations planned to: The site,
site grading, site circulation, the building, exiting or any other work in any other way or form.
The scope of work is:
• An Expansion to the existing stair in this area for better circulation
■ A 400sf entry with shed roof, using the same building materials
■ A new slab area to support 3 milk silos (300sf±)
0 Pumps, electrical and other equipment as required to light, power and assist in the
operation of the entry and these new silos.
Sincerely,
Larz Hitchcock, NCARB, LEED AP BD+C
Senior Project Manager
JACKSON I MAIN Architecture, P.S.
311 First Avenue South
Seattle, Washington 98104
206.324.4800 P
www.jacksonmain.com
JACKSON I MAIN ARCHITECTURE, P.S. 311 FIRST AVENUE SOUTH, SEATTLE, WA 98104 206.324.4800 1ACKSONMAIN.COM
r
�fl
mimmmmm_u +
S aF. !!h st Lakeland
North
rx Steel
Lake Park
Federal Way S312.1hSt
The Common,;
At federal Way
'40\
'elebration
Park
(LO
34114 21 st
Avenue South
S So illk,
ti ::eote,
Round Table Pzza
CR
Denny -
cost--o Wholesale
M
Auburn
s to
Ellenos Milk Silos
JM#: 18057
Jan 1 Oth 2020
Vicinity Map
BAN 14 2020
MY OF FEDERAL WAY
COMMUNrTY DEVELOPMEPF!
RECEIVED
JAN � � 2020
corOF FEDERAL WAY
muNITY DEVELOPMENT
A R C 1-4 1 T EO.TU RE
311 FIRST AVENUE SOUTH
SEATTLE, WA 98104
t206.324A800
WWW,JACkSONMAIN.COM
an
4879
REGISTERED
ARCHITECT
GREGG A. i'ERCICH
STATE OF WASNINGTON
PROJECT NO. 18057,00
PROJECT MGR.- GP
DRAWN BY; LH
CHECKED BY: GP
COVER SHEET
Al■01
jAcKSON I MAIN ARCHITECTURE P.S. 62017,