Loading...
23-100624- -- w Demolition City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MEMORIAL STADIUM Project Address: 1300 S 308TH ST Permit #:23-100624-00-DE Inspection Request Line: (253) 835-3050 Parcel Number: 082104 9001 Project Description: Demolition of (2) grandstands, (2) ticket booths and (2) concession/restroom buildings. Owner Applicant Contractor FEDERAL WAY PUBLIC SCHOOLS ERIC SHELTONBN BUILDERS B N BUILDERS 33330 8TH AVE S 2601 S 4TH AVE BNBUIL*990K3 (9/15/23) FEDERAL WAY WA 98003 SEATTLE WA 98121 2601 4TH AVE SUITE 350 SEATTLE WA 98121 Additional Permit Information PERMIT EXPIRES Wednesday, 2 August, 2023 Permit Issued on Friday, February 3, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washin ton and the City of Federal Way. Owner or agent: Date: rl-MA I THIS CARD IS TO REMAIN ON -SITE CITY OF Federal Way PERMIT #: Project: Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 23 100624 00 Address: 1300 S 308TH ST FEDERAL WAY PUBLIC SCHOOLS FEDERAL WAY WA 98003-4903 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Final - Building (4050) Approved By Date 10 t Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date CITY OF RECEIVED PERMIT APPLICATION I Way ]� day � EB 03 2S LIT CENTER + 33325 81h Avenue South + Federal Way, WA 98003-6325 i/ U 53-835-2607 + FAX 253-835-2609 + CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT PERMIT NUMBER _ /1 f1 _ VV lJ TARGET DATE SITE ADDRESS 1300 S 308th Street, Federal Way, WA 98003 PROJECT VALUATION $ $120,000 TYPE OF PERMIT NAME OF PROJECT PROJECT DESCRIPTION Detailed description of work to be included on this permit only SUITE/UNIT # ZONING ASSESSOR'S TAX/PARCEL # BC 0 8- 2 1 0 4_ 9 0 0 1 ❑ BUILDING ❑ PLUMBING ❑ MECHANICAL $I DEMOLITION ❑ ENGINEERING ❑ MRE PREVENTION Memorial Stadium Renovation Demolition of all structures to make way for new grandstands, restroom, concession and ticketing structures. Structures to be demolished include two existing grandstanc two existing ticketing booths, two existing concessionibath room structures NAME Federal Way Pubic Schools PROPERTY OWNER MAULING ADDRESS 33330 8th Ave. South ZIP Federal Way s+ 98003 ]FAME -----� ... BN Builders CONTRACTOR APPLICANT PROJECT CONTACT rfhe individual to receive and respond to all correspondence concerning this application) PROJECT FINANCING When ualue is $5,000 or more (RCW 19.27-095) MAILING ADDRESS 2601 4th Ave. Suite 350 CITY Seattle WA STATE CONTRACTOR'S LICENSE # CC BNBUIL*990K3 NAME �. Same as Contractor MAILING ADDRESS CITY NAME Eric Shelton MAILING ADDRESS 2601 4th Ave. Suite 350 CITY Seattle NAME MAILING ADDRESS, CITY, STATE, ZIP STATE Ze WA 98121 EXPIRATION DATE 9 / 15 /23 STATE I ZIP STATE ZIP WA I 98121 PRIMARY PHONE 206-642-9144 E-MAIL. PHONE ----- 206-473-2798 E-MAIL eric.shelton@bnbuilders FAX 206-382-3440 Ulu # 602-056-687 PRIMARY PHONE E-MATT. FAX PRIMARY PHONE 253-732-3231 ericIL helton@bnbuilders. FAX ❑ OWNER -FINANCED PHONE I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and flied against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the c' y as a part of this application. SIGNATURE: `- - - - DATE 2/2/23 PRINT NAME: Eric Shee7ton Bulletin #100 — February 19, 2020 Page 1 of 2 k:\Handouts\Pennit Application CommuNITY DEVELOPMENT DEPARTMENT 33325 8 h Avenue South Federal Way, WA 98003 CITY OF 253-835-2607; Fax 253-835-2609 Federal Way DEMOLITION PERMIT REQUIREMENTS A demolition permit is required to remove any structure on a subject property. Demolition of separate structures may require separate permits. 8: Address of Demolition: . 6 .2� 3d 8 SF w4 Prior to submitting a demolition permi14 the following items must be signed by the respective agency or their approvals attached. Items not applicable to your project should be marked N/A. 1K A completed Construction PermitAPPiication form is also required. US6 ?M mST4 2-2.102tz3 000 00 (A? aWM;Ftk grAw cr gq: 1. ASBESTOS ABATEMENT (Provide ropy of No6ce oflntentfrom Puget Sound Clean Air Agency and ropy of inspection report by AHERA-certified inspector) (City of Federal Way Building Official) �. FUEL STORAGE TANKS ❑ Under grade tank(s) is/are present n Above grade Lank(s) are present ❑ Tank(s) has been pumped Or removed under South IGng Fire & Rescue Permit prior to any dismantling or excavation {South King Fire and Rescue) �cs3i=33°I'��3N 3. SEPTIC SYSTEM DECOMISSIONING *_(K_i,gC,,nty Environmental Ser&,,s SANITARY SEWER f kehave ater & Sewer pistritt} 22. 104213 0oo 0o Ca 5. ELECTRICITY (Puget Sound Energyfraooma Power) 6. NATURAL GAS (Puget Sound Energy) 6 WATER - Public Sou (La av Water & Sewer Cam) 8. WATER - Private Well (King County Environmental Services) ❑ Please Note: Erosion control measures must be in place during the demolition and through completion of the site clean-up.M(Apokant) Bulletin #122 — Apri18, 2021 Page 1 of 1 k:lliandoutslDemolition Permit Requirements 12/27/22, 2:22 PM Approved Transaction au�,N "U99T IOUND Clean Air Agency Notification Case #: 202205925 This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for inspection at all times at the asbestos project or demolition site (Reg III, 4.03(a)(6)). Fee Amount Paid $130.00 Credit Card Transaction * AN0A4E9AD2F0 Transaction Date 12/27/22 Owner's Name Federal Way Public Schools Phone (253) 945-2000 Project Street Address 1300 S 308th St - West Grandstand Bleachers City Federal Way Zip 98003 Contact Person Ton Ross Phone (253) 249-4238 Mailing Address 1211 S 332nd St Federal Way, WA 98003 This project includes asbestos removal. Project Size 50 linear feet / square feet Project Start Date 01/04/23 Completion Date 04/01/23 Asbestos will be removed by a licensed asbestos abatement contractor Contractor Ascendent LLC Contractor Job # 622169 Contact Ton Ross Phone (253) 939-4375 Mailing Address PO Box 1150 Sumner, WA 98390 This project includes a demolition. Demolition Start Date 02/14/23 Completion Date 04/01/23 Demolition will be completed by a demolition contractor Demo Contractor Ascendent LLC Contact ]on Ross Mailing Address PO Box 1150 Sumner, WA 98390 Contractor Job * Phone (253)939-4375 (1) I certify that the information I have provided is to the best of my knowledge true and accurate. (2) I understand that I must file an Amendment to this Notification if: • The type of project has changed. The project types are asbestos and demolition. • The quantity of friable asbestos to be removed meets a larger project category. • The project's start or completion date has changed. (3) I understand one Notification must be filed for each structure. The only exception is for a single-family residence that includes multiple ancillary structures, such as a detached garage or other outbuildings having the same street address. If there is no street address, I have used a building number. (4) I understand the fees for this Notification are nonrefundable. Create Another Notification If you have questions, contact us at asbestos@pscleanair.gov or 206.689.4058. hfps://secure.pscleanair.org/Asbestos/Approved.aspx 1/1 12/27/22, 2:33 PM Approved Transaction auV%\ PUGET SOUND Clean Air Agency Notification Case #: 202205927 This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for inspection at all times at the asbestos project or demolition site (Reg III, 4.03(a)(6)). Fee Amount Paid $65.00 Credit Card Transaction # AKOAA195ES66 Transaction Date 12/27/22 Owner's Name Federal Way Public Schools Phone (253) 945-2000 Project Street Address 1300 S 308th St - Southwest Concessions City Federal Way Zip 98003 Contact Person Son Ross Phone (253) 249-4238 Mailing Address 1211 S 332nd St Federal Way, WA 98003 This project includes a demolition. Demolition Start Date 02/14/23 Completion Date 04/01/23 Demolition will be completed by a demolition contractor Demo Contractor Ascendent LLC Contact Son Ross Mailing Address PO Box 1150 Sumner, WA 98390 Contractor Job * B22169 Phone (253)939-4375 (1) I certify that the information I have provided is to the best of my knowledge true and accurate. (2) I understand that I must file an Amendment to this Notification if: • The type of project has changed. The project types are asbestos and demolition. • The quantity of friable asbestos to be removed meets a larger project category. • The project's start or completion date has changed. (3) I understand one Notification must be filed for each structure. The only exception is for a single-family residence that includes multiple ancillary structures, such as a detached garage or other outbuildings having the same street address. If there is no street address, I have used a building number. (4) I understand the fees for this Notification are nonrefundable. Create Another Notification If you have questions, contact us at asbestos@pscleanair.gov or 206.689.4058. https://secure.pscleanair.org/Asbestos/Approved.aspx 1/1 12/27/22, 2:36 PM Approved Transaction au�k PUGET SOUND Clean Air Agency Notification Case #: 202205928 This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for inspection at all times at the asbestos project or demolition site (Reg III, 4.03(a)(6)). Fee Amount Paid $65.00 Credit Card Transaction # AFOA4F6DEA09 Transaction Date 12/27/22 Owner's Name Federal Way Public Schools Phone (253) 945-2000 Project Street Address 1300 S 308th St - Southeast Concessions City Federal Way Zip 98003 Contact Person Son Ross Phone (253) 249-4238 Mailing Address 1211 S 332nd St Federal Way, WA 98003 This project includes a demolition. Demolition Start Date 02/14/23 Completion Date 04/01/23 Demolition will be completed by a demolition contractor Demo Contractor Ascendent LLC Contact Ton Ross Mailing Address PO Box 1150 Sumner, WA 98390 Contractor Job # B22169 Phone (253) 939-4375 (1) I certify that the information I have provided is to the best of my knowledge true and accurate. (2) I understand that I must file an Amendment to this Notification if: • The type of project has changed. The project types are asbestos and demolition. • The quantity of friable asbestos to be removed meets a larger project category. • The project's start or completion date has changed. (3) I understand one Notification must be filed for each structure. The only exception is for a single-family residence that includes multiple ancillary structures, such as a detached garage or other outbuildings having the same street address. If there is no street address, I have used a building number. (4) I understand the fees for this Notification are nonrefundable. Create Another Notification If you have questions, contact us at asbestos@pscleana1r.gov or 206.689.4058. https://secure.pscleanair.org/Asbestos/Approved.aspx 1l1 12/27/22, 2:26 PM Approved Transaction aUNS FUOU BOUND Clean Air Agency Notification Case #: 2022OS926 This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for inspection at all times at the asbestos project or demolition site (Reg III, 4.03(a)(6)). Fee Amount Paid $65.00 Credit Card Transaction # ALOASCBEFS99 Transaction Date 12/27/22 Owner's Name Federal Way Public Schools Phone (253) 945-2000 Project Street Address 1300 S 308th St - East Grandstands City Federal Way Zip 98003 Contact Person Ton Ross Phone (253) 249-4238 Mailing Address 1211 S 332nd St Federal Way, WA 98003 This project includes a demolition. Demolition Start Date 02/14/23 Completion Date 04/01/23 Demolition will be completed by a demolition contractor Demo Contractor Ascendent LLC Contact Son Ross Mailing Address PO Box 1150 Sumner, WA 98390 Contractor Job # B22169 Phone (253)939-4375 (1) I certify that the information I have provided is to the best of my knowledge true and accurate. (2) I understand that I must file an Amendment to this Notification if: • The type of project has changed. The project types are asbestos and demolition. • The quantity of friable asbestos to be removed meets a larger project category. • The project's start or completion date has changed. (3) I understand one Notification must be filed for each structure. The only exception is for a single-family residence that includes multiple ancillary structures, such as a detached garage or other outbuildings having the same street address. If there is no street address, I have used a building number. (4) I understand the fees for this Notification are nonrefundable. Create Another Notification If you have questions, contact us at asbestos@pscleanair.gov or 206.689.4058. https://secure.pscleanair.org/Asbestos/Approved.aspx 1/1 12/27/22, 2:40 PM Approved Transaction a0VN11%\ PUYET SOUND clean Air Agency Notification Case #: 202205929 This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for inspection at all times at the asbestos project or demolition site (Reg III, 4.03(a)(6)). Fee Amount Paid $65.00 Credit Card Transaction # APOA7F736CF3 Transaction Date 12/27/22 Owner's Name Federal Way Public Schools Phone (253) 945-2000 Project Street Address 1300 S 308th St - Locker Rooms City Federal Way Zip 98003 Contact Person Jon Ross Phone (253) 249-4238 Mailing Address 1211 S 332nd St Federal Way, WA 98003 This project includes asbestos removal. Project Size 120 linear feet / square feet Project Start Date 01/04/23 Completion Date 02/14/23 Asbestos will be removed by a licensed asbestos abatement contractor Contractor Ascendent LLC Contractor Job # B22169 Contact Jon Ross Phone (253) 939-4375 Mailing Address PO Box 1150 Sumner, WA 98390 (1) I certify that the information I have provided is to the best of my knowledge true and accurate. (2) I understand that I must file an Amendment to this Notification if: • The type of project has changed. The project types are asbestos and demolition. • The quantity of friable asbestos to be removed meets a larger project category. • The project's start or completion date has changed. (3) I understand one Notification must be filed for each structure. The only exception is for a single-family residence that includes multiple ancillary structures, such as a detached garage or other outbuildings having the same street address. If there is no street address, I have used a building number. (4) I understand the fees for this Notification are nonrefundable. Create Another Notification If you have questions, contact us at asbestos@pscleanair.gov or 206.689.4058. https://secure.pscleanair.org/Asbestos/Approved.aspx ill PBS Environmental Field Observation Report Abatement Contractor. Ascendant PBS Site Observer(s): Nick San Contractor on Site Personnel: Eric Shelton, Don Burnside (BNBuilders), Larry Schiefelbein (Ascendant) Project Manager Yes No Supervisor Yes No Workers Yes No Name: Larry Schiefelbein How Many? 2 Air Monitoring Personnel on site: Nick San � awi� Project Name: Memorial Field Renovations Project No.: 41519.010 Date: 01/05/2023 Report No. 1 Time 7:00am am Page 1 of 1 Weather/Temperature: Cloudy 40s Summary Phase Status: Other Personnel on Site: BNBuilders WORK DESCRIPTION: Removing ACM hard fittings in the visitor's locker room and garage space WORKER PROTECTION: Hard hats, boots, gloves, safety glasses, high visibility vests, half face respirators, Tvyek suits, METHOD OF REMOVAL Glove bagging, Hand Tools, Power Tools within regulated and restricted work area OBSERVATIONS: 7:00: PBS and Ascendant arrive on site. PBS observer walks through storage house with Ascendant supervisor Larry noting spots for abatement. Today they will begin by abating hard fittings by glove bagging in the visitor's locker room and garage/storage space on the NW ceiling. Ascendant crew begin prepping for abatement. 8:15: Ascendant begin abatement in the visitor's locker room by glove bagging. 8:30 PBS calibrate and begin IWA air sample in the visitor's locker room entrance. 8:45: PBS calibrate and begin Pre -abatement air samples in the NW garage/storage space and central kitchen building office spaces. 10:00: Ascendant continue glove bagging inside the visitor's locker room along the ceiling. 10:30: Pre -abatement samples post flow measured; sample cassettes collected for analysis. 11:30: IWA post flow measured; sample cassette collected for analysis. 12:00: Ascendant and PBS take lunch break. 12:45: PBS and Ascendant return from lunch 1:00: Ascendant begin glove bagging in the NW garage/storage space. 2:00: PBS calibrate and begin OWA air sample in the NW garage/storage space. 2:30: Ascendant complete glove bagging in the visitor's locker room. PBS observer will perform clearance air samples beginning tomorrow. 3:00: Ascendant begin prepping office space containment by hanging up poly walls and setting up DCON. 3:15: OWA post flow measured, sample cassette collected for analysis. 3:30: PBS and Ascendant off -site. ITEMS OF CONCERN CHANGES IN SCOPE: QUANTITY AND TYPE ACM REMOVED THIS SHIFT/ PHASE: BUILDING/AREA/LOCATION 20 ACM Hard Fittings I Federal Way Memorial Field Visitor Locker Room 4 ACM Hard Fittings I NW Garage/Storage Space The individual signing certifies that the above Signature: /(/ 36210L information is correct and accurate. Name: Nick San Date 01/05/23 w u Ln 0 m 00 .n In 0 v Q L O O O O m E C 0 0 O N o d E O O O O O O O 2 Lq N � V Q O O WZFE N fV J Z O O a Q •-1 �� O O CD0 O O C> O f 03 y y F$ LU nMi W m L. Q40 _ fO O O N = L p � m Quj iO LA E O_ o > Q V O W �F W -1 2 O O N ■. F— W W Q \ \ ta d Q Q Oa0 iO O O N O o� I' ~ 00 O O 0 W a Ln lCu LL G Ln N M �Q Ff O r ~ W Q O o ~ N O O co O N w Z W Oz Q H Z Q Z O O } m m LL v Lu a w Z U 66 1 d6 60, N C [WV NW Y = j j Z; O O O O O O Q Q Q O O O O O O aQ LU cc X m a w H u_ Q Z u u L Z O Z ce C WC a af6i C G 1° O LU F Q C O Oc Q C1 Q 01 m W 12 R Y V W J Z~ Q Z O "'1 Y U N \ N \ Z EL < W Y < coz ~ u 'Y Y Ol O 01 S Q J i Q N N !n m mZm i� �.i Q m m m 0 a 5 O N W Ili � Q m ii ii > Z O Z dL N m ° E �" $ sWm LA r rr E `58 u? 1� N co � 0 od .0 a Q Q a N Q ul � J Q m m D' OC U- u Z Z Q w� V — d � O Im O o Q CL to .. LA � E C `6 a m Y m Z l7 u' = Z a O j W d m 2 a/ al Q N m v In w L;n; tA G .�. °' v `° Q fO = m a 3 O to Z mO z z In C L' .D � FA — W U U O u Z > coi W W ~ N 1 N N 1 N N N O O +' U C - W W W G t O\ V\l O\ l O L\n CD m O if O a a v U EC E: IV o 0 0 0 I ol 0 PBS Environmental Field Observation Report Abatement Contractor. Ascendant PBS Site Observer(s): Nick San Contractor on Site Personnel: Eric Shelton, Don Burnside (BNBuilders), Larry Schiefelbein (Ascendant) Project Manager Yes No Supervisor Yes No Workers Yes No Name: Larry Schiefelbein How Many? 2 Air Monitoring Personnel on site: Nick San WORK DESCRIPTION: Removinq ACM Vinvl Floor Tile and Mastic underneath _PBS Project Name: Memorial Field Renovations Project No.: 41519.010 Date: 01/06/2023 Report No. 2 Time 7:00am am Page 1 of 1 Weather/Temperature: Cloudy 40s Summary Phase Status: Other Personnel on Site: BNBuilders WORKER PROTECTION: Hard hats, boots, gloves, safety glasses, high visibility vests, half face respirators, Tvyek suits, METHOD OF REMOVAL Terminator Floor Tile Remover, Hand Tools, within requlated and restricted work area OBSERVATIONS: 7:00: PBS and Ascendant arrive on site. 7:15: Ascendant continue prepping the central kitchen building office room containment for floor tile and mastic abatement setting up DCON, HEPA negative air machines and a small bit of demo work removing cabinets. 7:30: PBS calibrate and begin 5 clearance air samples in the visitor's locker room. 9:00: Ascendant complete setting up the central kitchen building office room and will now begin abatement by removing floor tile with a terminator floor tile remover and removing as much mastic by hand before putting chemical on 9:30: Clearance air samples post flow measured; sample cassettes collected for analysis. 9:50: PBS calibrate and begin 5 clearance air samples in the NW garage storage space. 11:20: Ascendant take lunch. Ascendant supervisor Larry notifies PBS that the floor tile and mastic removal will be finished today, but Ascendant plan on removing hard fittings above the ceiling before encapsulating the space. 11:50: Clearance air samples post flow measured; sample cassettes collected for analysis. 12:00: Ascendant return from lunch break. PBS calibrate and begin HEPA negative air sample outside the central kitchen building office room N side window. 12:30: Ascendant finish removing floor tile and most mastic. They will now apply chemical onto the flooring to remove more. 2:30: HEPA negative air sample post flow measured; sample cassette collected for analysis. Ascendant finish a majority of cleaning with chemical in the containment and will detain clean on Monday 1/9. 3:15 PBS off site ITEMS OF CONCERN CHANGES IN SCOPE: N/A QUANTITY AND TYPE ACM REMOVED THIS SHIFT/ PHASE: BUILDING/AREA/LOCATION Federal Way Memorial Field Office Rooms The individual signing certifies that the above Signature: NGC/t°i 520i information is correct and accurate. Name: Nick San Date 01/06/23 m u LL v o 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 o c d a o o� CD0 o 0 0 o 0 0 o 0 ij CD Qo o to r- to Ln O\i co Ln tC Lq r-a\o to 00 Ul of rn r\n 0 0 0 0 0 0 0 0 0 0 Z a O ,gyp ' N N N N N N N N N Ln F$ Q ~ W M N W m Q W v� Spl7 a o o O o 0 0 0 0 0 0 _ = Q m to a, E oLU > Qai 3 a0 = LL O O O O — O — O - O O O CD F W a W C d ¢ a m a o 0 0 0 0 0 0 0 0 0 Ln cn � 0 W a O H N N N N � N W J �- LL 0. Z Q O C W In ~ O Ln enM iD M co M Ot M to to Ln to LA O M m V! W Z U H O 01 01 01 01 01 fV W Y Z pap N Q H Z Q d OC D Q Z O O X J In M lD M I- M W M O1 M O to V1 N to M In Ln O ni Z m m 0_ W U I n n r r O1 O1 61 01 O1 C O W W Y o 0 0 0 0 0 C. 0 0 0 0 0 0 _ Z o 0 0 0 0 0 0 0 0 0 0 0 0 ZZ g a o 0 0 0 0 0 0 0 0 0 0 0 0 a a elf x w pLWF- VF j Z +_ Q H 0 0 0 0 0 w Z C C O W a E O 0 E O 0 E O 0 E O 0 E� O o w rn w w o, f2 w m w a, cm w w rn o W pC w w w m m 2 2 N w H U a Z uv 0> v N O O O O O'c W .Y yJ Y Y Y Y -le Ln Ln VI Ln N E Z a K W Y Q m Z H U C O J O J O J O J O J w N w IO w f� w 1` w 1` O a J Q J a a7 fa Vn Ln Vl r IA 0 p _ Vl 1► U Q m m m O O O O O m U m 0 m 0 m 0 m L9 w V -0 -0 gS W W U Q m LL Li- > % > > > Z Z Z Z Z O O w Z_ 2 d W ^ m co op r m m &E -P 0 m°' 3 O °��' 5e3W�to � W H W H !L O ^ Ln 0 m co w t0 O O r to O 01 m a0 i t0 O O 5 C 0 Q a N = N N = N = H O Q W W ^ 0 a m m U U U v v U u U v v 2 ii V) v Z Z Q o W u a3 n D O Lnw H W LU N O-cc m d Z W d m O N M 'i V1 t0 a0 01 ulQ n 00 01 Q W = >-Q 3 3 W Z IA m a 0 m Z O Z N C L: LL �.y W W M N M N M N M N M N M N M N M N M N M N M N rn N M N i+ O V I H \ \ \ \ \ \ \ \ \ \ \ \ \ u a�i -rl m +. _ c Z W W p a t0 o t0 0 l0 0 l0 0 l0 0 t0 0 l0 0 l0 Cl m O tD O l0 o l0 0 l0 0 Oo A a W W O a _\ _\ _0 d CL J U U :J _\ 0 _\ O _\ O _\ O _\ O _\ O O 0 O O O O O PBS Environmental Field Observation Report P B S Abatement Contractor. Ascendant Project Name: Memorial Field Renovations PBS Site Observer(s): Nick San Project No.: 41519.010 Date: 01/09/2023 Report No. 3 Time 7:00am am Contractor on Site Personnel: Eric Shelton, Don Burnside (BNBuilders), Larry Page 1 of 1 Schiefelbein (Ascendant) Project Manager Yes No Supervisor Yes No Weather/Temperature: Cloudy 40s Workers Yes No Name: Larry Summary Phase Status: Schiefelbein How Many? 2 Other Personnel on Site: Air Monitoring Personnel on site: Nick San BNBuilders WORK DESCRIPTION: Removinq ACM Vinyl Floor Tile and Mastic underneath WORKER PROTECTION: Hard hats, boots, gloves, safety glasses, high visibility vests, half face respirators, Tvyek suits, METHOD OF REMOVAL Chemical, HEPA Vacuum Hand Tools, within requlated and restricted work area OBSERVATIONS: 7:00: PBS and Ascendant arrive on site. PBS observer attends job site safety orientation. 7:30: Ascendant begin detail cleaning in the central kitchen building office rooms with hand tools scraping and vacuuming up mastic. 7:40: PBS calibrate and begin OWA and H air samples by the entrance to the office rooms and outside the windows 9:40: OWA and H air sample post flow measured; sample cassette collected for analysis. 10:30: Ascendant complete detail cleaning inside the office rooms. PBS observer performs a visual inspection inside the containment noting a few small spots to clean up more mastic. 11:15: Ascendant take lunch. 11:30: PBS calibrate and begin 2 Pre -Abatement air samples in both the east and west concession stands. 12:00: Ascendant return from lunch. Ascendant will now begin wrap and cutting ACM Hard Fittings above the ceiling using a small hole opened in the ceiling of the office room restroom. 1:30: Pre -Abatement air samples post flow measured; sample cassette collected for analysis. 2:00: Ascendant supervisor Larry informs PBS observer that there is are more hard fittings needed to be abated specifically glove bagged in both the visitor and home locker room restrooms and showers of the central kitchen building. 3:00: PBS off site. ITEMS OF CONCERN CHANGES IN SCOPE: N/A QUANTITY AND TYPE ACM REMOVED THIS SHIFT/ PHASE: BUILDING/AREA/LOCATION 850 SF ACM Vinyl Floor Tile and Mastic 34 ACM Hard Fittinqs The individual signing certifies that the above information is correct and accurate. Federal Way Memorial Field Office Rooms Signature: /(/G�/i°i 5:2.0fl Name: Nick San Date 0 m ■ u u m E k S 0 k o d v d � S B/ CD S 8 k U. \ k / \ En� � © » \ \ f \ § ± o mLU a W $ k $ o o a» C L ■ LU > « ¥ _ 2 2 %� 20 o 0 0 0 o a q I e e a j ILU � B 8 B q ° � § § - � c § 7 § Ln o VA /§ q a a A Q 2 �22�2 o j§ §© q§ z & § 6 d o / m / / LU § LU LU § § 8 8 8 8 8 8 z z Lii» 2 \ k\\\\ « « x LU 0- w w � \ 2 q \ � Lu § w § K ~ IL 0 § r 2 Z/ § A u% 2 k UJ < k / \ � \ \ 0 k 2 $ b 3 u « 0 u `�§ u< d xLLI k m LI IlE \ o G TH M ! § a a a § g q k \ \ ® § $ k o § § u < u \ o_ § k 0 7 k k § tn k k § � � o � § m m m m m m / ° f < ` LU x m \ § 2 } k \ \ 0 j > � \ E m m \ \ ` A a) CUm 2 k§ o \ k k k k\ ± y \ u u 6� � G 3 G 3 3 01 PBS Environmental Field Observation Report Abatement Contractor: Ascendant PBS Site Observer(s): Nick San Contractor on Site Personnel: Eric Shelton, Don Burnside (BNBuilders), Larry Schiefelbein (Ascendant) Project Manager Yes No Supervisor Yes No Workers Yes No Name: Larry Schiefe How Many? 2 Air Monitoring Personnel on site: Nick San =; PBS Project Name: Memorial Field Renovations Project No.: 41519.010 Date: 01/10/2023 Report No. 4 Time 7:00am am Page 1 of 1 Weather/Temperature: Cloudy 40s Summary Phase Status: Other Personnel on Site: BNBuilders WORK DESCRIPTION: Removinq ACM Hard Fittinqs in the home and visitor locker rooms WORKER PROTECTION: Hard hats, boots, gloves, safety glasses, high vg isibility vests, half face respirators, Tvyek suits, METHOD OF REMOVAL: Glove bagging, Hand Tools, within regulated and restricted work area OBSERVATIONS: 7:00: PBS and Ascendant arrive on site. 7:30: PBS calibrate and begin 5 clearance air samples in the central kitchen building office rooms. Ascendant begin glove bagging in the visitor and home locker room while wrap and cutting hard fittings in the home and visitor shower space which is shared ceiling space as the ceiling tiles have been demoed out. 9:30: Clearance air samples post flow measured; sample cassettes collected for analysis. 10:30: Ascendant supervisor Larry informs PBS observer that home and visitor locker room shower and restroom have finished abatement and will not begin glove bagging remaining fittings in the visitor locker room. 11:30: PBS off site. ITEMS OF CONCERN CHANGES IN SCOPE: QUANTITY AND TYPE ACM REMOVED THIS SHIFT/ PHASE: BUILDING/AREA/LOCATION 30 ACM Hard Fittings I Federal Way Memorial Field Locker Room: Shower and Restroom The individual signing certifies that the above information is correct and accurate. Signature: N41�oell 5:141 Name: Date 01/10/23 PBS Environmental Field Observation Report Mi. PBS Asbestos Contractor: Ascendent Demolition Project Name: Federal Way Memorial Field PBS Site Observer(s): Ferman Fletcher Project No.: 41519.010 Date: 1/10/23 Report No. Time 11:30 am Contractor on Site Personnel: Page 1 of Project Manager Yes No Supervisor Yes Weather/Temperature: Workers 2 Yes Name: Larry Summary Phase Status: How Many? Other Personnel on Site: Air Monitoring Personnel on site: Ferman Fletcher WORK DESCRIPTION: Glovebagging fittings in Locker Rooms WORKER PROTECTION: 1/2 Face respirator, Tyvek coveralls METHOD OF REMOVAL Glovebaggiing of fittings OBSERVATIONS: 11:30 Ferman Fletcher of PBS arrives onsite. Crew is on lunch and still has 2 fittings to glovebag. 12:20 Begin clearance in Men's Home Locker Room. Crew is glove bagging fittings in the Visitor's Locker Room. 14:30 Collect clearance samples. PBS leaves site. ITEMS OF CONCERN CHANGES IN SCOPE: QUANTITY AND TYPE ACM REMOVED THIS SHIFTI PHASE: BUILDING/AREA/LOCATION The individual signing certifies that the above Signature: information is correct and accurate. Name: Date — LL.� « $ @ E $ $ 2 CD CD CD c o \ ■ CD 8 8 8/ \ 0 8 8 / p E � & & » \ \ \ ƒ m \ \e • a « ' 8 CD CD 0 ! � m m � § � W \ ƒ < m > W] 0 « o 0 0 o c Z � § # < ■ ¥ - z v d \¢ � LL a o o a o < k o o @ I c o c o 0 j LU 2 R@ g 8 q LU U. w § o ma ma %§ m§ q co IA \§ u a a a k k § o < X mmco§§0.Lu ■ u R R K ~ � � � § \ z / / / / 7 / / > § z z » I 2 & # & & & & & « « x w e § } } } } 0 4) e (D, 0) e z \ \ \ \ \ § m m m m FA k § LLJu $ —§ u /co C13 ca co k co a_ z w § F $ 5 5 5 £ , k k � § k a \ \ u<_ ca f 2 2 2 2 2 ° 2 { 2 t \ ai ed u«co u u u u u a = \ m m § ||| | |]|\ r 2 k �� 0 k k $ , 5< § .. = u u u u u \ 2 2! .. / $ Lu Ln u k§ m LU§� uj LU E \ � — § @ 2 m m c m rn ƒ a \ z § \ m < x k § in z 2 k tA & 7 @ \ @ @ § @ § K z 2 LU \ \ m E E \ 2 LU v LU o 3&� I W. JU G c 3 3 3 3 E g = < r- o v o 0 0 o 2 c o 2 8 Lq�% 8 0 0 a f2 -� k / \ \ K & » 0 a k o / § \ $ \ o » & §§ a L y < LU « 2 k § § m m % 7 < - -- § § _2 $ L g t t a LU _ 2 m D ± « aLU o 0 0 0 0 z o§ LU _ \ § z } LU r 0 4 ¥ ¥ -co LU u \ ul §\ § § c \\ oz ■ co §u< x d o a q \ z CD } C./ > & 0 a & » k k § ) � a � § « 2 o � § d f k $ k 0 k § \ \ § q < u Ln s § -j < § ° E § 4 4 § § ƒ m ., kR §�/ u �`°~ / d j « %��(m a | I|�ƒ§ §_ |c\2j £ _ ƒ LUJA § } j \ k k j b $ 4 §< § u u u u u m_ � \ z /// o E o s� - A _ _j LU ar \ \&= a)o 5 m E« o a M ° rn m rn m en cn # s # ± 7 } § / c e < < « � £ 2 2 § f \ / a§ m �$o�z E a 2 2 s 2 2 A / E) 9 Q � § - % ® z z [ ƒ \ » c ■ § » k 4 S � z / uo / w � u \ ) !ZIA PBS Environmental Field Observation Report Abatement Contractor: Ascendant PBS Site Observer(s): Ferman Fletcher Contractor on Site Personnel: Eric Shelton, Don Burnside (BNBuilders), Larry Schiefelbein (Ascendant) Project Manager Yes No Supervisor Yes No Workers Yes No Name: Larry How Many? 2 Air Monitoring Personnel on site: Ferman Fletcher WORK DESCRIPTION: Glove bagginq fittings in West concession stands Elkqo PBS Project Name: Memorial Field Renovations Project No.: 41519.010 Date: 01/11/2023 Report No. 5 Time 7:00am am Page 1 of 1 Weather/Temperature: N/A Summary Phase Status: Other Personnel on Site: BNBuilders WORKER PROTECTION: 1/2 face respirator, Tyvek coveralls METHOD OF REMOVAL: Glove bagging of fittings OBSERVATIONS: 7:30: PBS and Ascendant arrive on site. Crew set-up critical barriers in the east concession stand. 8:00: Set-up and begin clearance in the east locker room. 9:00: Crew exposing fittings and glove bag in east concessions. 12:00 Collect and read clearance for east room. Clearance passes. Ascendant notified. 15:30 PBS and Ascendant leave site ITEMS OF CONCERN CHANGES IN SCOPE: QUANTITY AND TYPE ACM REMOVED THIS SHIFT/ PHASE: BUILDING/AREA/LOCATION The individual signing certifies that the above Signature: information is correct and accurate. Name: Date — u § k k k k • a c c c � 2 \ CD LL / \ \ % 2 & » $ § $ k j m % % m % � R R § 0> 2< W u < < 2 § M < � .. ,. § § v 2 § Q $ L CL 2 $ k <ca 2 2 2 2 2 D -1 - @§ A A G z 0§ 62 / � � « � z- o � o q @ ? > >z ■ §/ aaa5 z LD z \ \ �2 \ \ § @ @ o ' u § 0 $ $ & z §Lud o E E 2 z« ] 2 a» a a a g a §64 � § z %A « L6 Q g § § § § § \ a 3 §/ , 7 ILU <<z 05 ) A ,� LL 1 2 < z � u § cc Lu ��}}m . .& EC ` a .. k W u < _ § t CL2§,2 a ƒ t \ j } \ k k u V) ( < § u u u u u= j §\ <<± ®Z 3 @ u o~� 2 ;-u/ § \ _ 2 § ƒ f= w = u w 0-- o a = m o - § @ 7 m } § 0 5 < < & \ % \ § J u< ƒ/ § E E E J 2 J ptri z z \ o � � \ { D D 4 / t § u \ k § \ u a S ~ J J) 6 PBS Environmental Field Observation Report p Asbestos Contractor. Ascendent Demolition PBS Site Observer(s): Ferman Fletcher Contractor on Site Personnel: Project Manager Yes No Supervisor Yes Workers Yes Name: Larry How Many? 2 Air Monitoring Personnel on site: Ferman Fletcher WORK DESCRIPTION: Glovebagging fittings in East Concession Stand V. � PBS Project Name: Federal Way Memorial Field Project No.: 41519.010 Date: 1/12/23 Report No. Time 8:30 am Page 1 of Weather/Temperature: N/A Summary Phase Status: N/A Other Personnel on Site: BN Builders WORKER PROTECTION: 1/2 Face res irator, Tyvek coveralls METHOD OF REMOVAL: GlovebaggIng of fittings OBSERVATIONS: 8:30 PBS arrives onsite. Ascendent onsite. Work with Larry from Ascendent to geta gallon size sample of vermiculite. He says crew is about an hour away from completing work in the east concessions stand. 10:30 Perform visual inspection on E. Concession's Stand 11:00 Inspection passes. Set up and begin air clearance. 12:30 Crew moves and begins to expose fittings and set up critical barriers in the W. Concessions Stand. 13:00 Collect and read clearance for E. Concessions stand. Clearance passes. Ascendent notified 15:30 PBS and Ascendent leave site. ITEMS OF CONCERN CHANGES IN SCOPE: QUANTITY AND TYPE ACM REMOVED THIS SHIFT/ PHASE: BUILDING/AREA/LOCATION The individual signing certifies that the above Si nature: information is correct and accurate. Name: Date —v 2 7 8 8 8 0 8 E Ln \ \ \ \ \ \ 0.k k o E S E@ m L o» m m m� & §§ o c c c o WSu LU g « x � § 0 0 0 0 0 § § § , . < 2 LLJL _ � / b < f o 0 0 0 K @ m@ m@ z z / � < u k § � L6 o 2 2 m � � / .k U— LU \ § § § § \ / LA o < § z - u§�© § z m 3 d a ) � © \ § z / / / / / LLJ ] « 0 0 0 0 a / z ce x § 0 r a z \ \ § § z tn ix c @ a § « 4 Ll.§ § a j E j)\ E B§( 3 m 3 § q a u o o E 2 f E LU z e o f f f" E g» E z f 2 < vƒ}\ /)'� d 7 j « se 3 \ f§� \ \ E �E� dy k k u < = / N� . _ M.— CLƒ � t § 3 \ o 0 { \ k k w J u 2 ] - n §< § u u u u u ca �k �<� u \ 2 f o _ 2\�LUce _ ƒ \ \ ) \ m E » ° § @ $ 2 $ @ @ Ln % % § § > � e « \ f ~ < / & < $ § IA z a E 5 E a- E / / d/ 0 .r f \ m o z 2 k &_ § G o \ 3 \ S W ƒ ) PBS Environmental Field Observation Report Abatement Contractor. Ascendant PBS Site Observer(s): Nick San Contractor on Site Personnel: Eric Shelton, Don Burnside (BNBuilders), Larry Schiefelbein (Ascendant) Project Manager Yes No Supervisor Yes No Workers Yes No Name: Larry Schiefelbein How Many? 2 Air Monitoring Personnel on site: Nick San a PBS Project Name: Memorial Field Renovations Project No.: 41519.010 Date: 01/17/2023 Report No. 7 Time 7:00am am Page 1 of 1 Weather/Temperature: Cloudy 40s Summary Phase Status: Other Personnel on Site: BNBuilders WORK DESCRIPTION: Removing ACM Hard Fittings in the west concession stands WORKER PROTECTION: Hard hats, boots, gloves, safety glasses, high visibility vests, half face respirators, pgek suits, METHOD OF REMOVAL: Wrap and cutting, Hand Tools and Power Tools, within regulated and restricted work area OBSERVATIONS: 7:00: PBS and Ascendant arrive on site. 7:30: Ascendant begin abatement in the west concession stands removing ACM hard fittings throughout the kitchen and restroom by wrapping and cutting. 8:00: PBS calibrate and begin OWA and H air sample in outside west concession critical and by HEPA negative air machine from the bathroom entrance. 10:00: OWA and H air samples post flow measured; sample cassettes collected for analysis. 11:00: Ascendant complete ACM hard fitting removal and demo of west concession interior. 11:10: Ascendant begin black/gray sealant removal in the west grandstand/press box. 11:50: PBS calibrate and begin 5 clearance air samples in the west concession's building inside the kitchen and both men and women's restroom. 12:00: Ascendant take lunch 12:45: Ascendant return from lunch 1:15: Ascendant complete removal of gray/black ACM sealant in the west grandstand mainly on the top level in an elevated space. 1:30: Ascendant begin removing ACM silver paint in the east grandstand by all the pipe penetrations also cleaning up around the penetrations 1:50: Clearance air samples post flow measured; sample cassettes collected for analysis. 2:00: Ascendant supervisor Larry informs PBS observer that during demolition in the central kitchen building office first aid room, ACM hard fittings were discovered inside the wall cavity on the ground and now Ascendant will be cleaning up and removing the hard fittings. 2:45: Ascendant complete ACM Hard Fitting removal and clean up in central kitchen building office first aid room. 3:00: PBS off site. ITEMS OF CONCERN CHANGES IN SCOPE: QUANTITY AND TYPE ACM REMOVED THIS SHIFT/ PHASE: BUILDING/AREA/LOCATION 36 ACM Hard Fittings I Federal Way Memorial Field West Concession Stands 12 ACM Hard Fittings i Central Kitchen Building First Aid Room in Office Spaces 25 LF of ACM Black/Gray Sealant. 5 LF of ACM Silver Paint I West Grandstand/Press Box, East Grandstand/Bleachers The individual signing certifies that the above Signature: NG�i 7 Qaw, information is correct and accurate. Name: Nick San Date 01/17/23 E S mf ■u k k k k k k k cu 2 f ■ d d o 0 o m o / E t kco o 6 E 0 0 8 8 8 0 § 2IL \ � � \ / \ \ \ 0 « 8 8 8 8 8 8 E § 0 0 o m m m m % 2 > , Lu m W \ x < 0 < 0 0 0 0 x■ 2 co co- k I J & Lu > < ■ Q u/ 2 \$ U.i oo� o 0 0 0 0 Q611 LWI§ k k D o o £ I coco o - 0 o c o � © V - au 0 2 m m_ q_ 0 0 �_ @_ ' _ \ \ / \ k § \ 7_ § o to m 2 m a- fLn 7 z d u - - - - co k .\< k W r a m m Ln Ln z co § mo d k LU LU \ \ \ k / \ \ \ / 0- / \ / o o c o 0 0 0 0 0 . a a § Lu � F- E 2 ( E z ) } J z§ k 2 c c\ c k ( \ ƒ ) • 3 9 2 Wn 7 \ - u 2 h§%§ R k \ \ k \ \ § $ k \ k \ k , ! k(( [ .4 tA n G«a 2 2 7 m§( & u u u u u }�§, u< co ƒƒ d z k k k k 4 | i| § m/ \k % coR % co B M ƒ % < k § w 7 I u u u u u § u §< _ / < u O - o z$ E ® LA7� 0 0 e E $� > % § k R LU coc)) o / k_ § / o ■ m Ln m Ln Ln Ln Ln Ln r- Ln Ln Ln Zo / LU « « k§ SA z f m< m } k j ) \ \ @ \ @ @ \ \ \ m \ y 2 E > ■ E ] 2 y z ° - 7 7 \ ` s S o \ . 0- 0 3 b■ I ce I o\\ G G 3 3 3 PBS Environmental Field Observation Report PBS Abatement Contractor. Ascendant Project Name: Memorial Field Renovations PBS Site Observer(s): Nick San Project No.: 41519.010 Date: 01/18/2023 Report No. 7 Time 7:00am am Contractor on Site Personnel: Eric Shelton, Page 1 of 1 Don Burnside (BNBuilders), Project Manager Yes No Supervisor Yes No Weather/Temperature: Cloudy 40s Workers Yes No Name: Summary Phase Status: How Many? Other Personnel on Site: Air Monitoring Personnel on site: Nick San BNBuilders WORK DESCRIPTION: Demolition WORKER PROTECTION: Hard hats, boots, gloves, safety glasses, high visibility vests, half face respirators, METHOD OF REMOVAL: OBSERVATIONS: 7:00: PBS and Ascendant demo crew arrive on site. 7:30: PBS calibrate and begin 5 clearance air samples in the central kitchen building office first aid room after hard fittings were abated and cleaned in the space between the walls. 9:30: 5 clearance air samples post flow measured; sample cassettes collected for analysis. 10:00: PBS off site. ITEMS OF CONCERN N/A CHANGES IN SCOPE: N/A QUANTITY AND TYPE ACM REMOVED THIS SHIFT/ PHASE: BUILDING/AREA/LOCATION The individual signing certifies that the above Signature: N4�'SlL4L information is correct and accurate. Name: Nick San Date 01/18/23 4 F v _ Ln � W § $ 8 $ S % ■ 0 0 0 d o E 0 E 0 0 o S 0 k _ ' / /CD f 0 I & & \ \ ƒ � _ o g « § 2. 0 0 8 0 0 8 0 0f o> 7 0 § < Uj > W « J < LU & � a o 0 0 0 0 Z 2 IA / § <eLi 3 \} u k e CD0 0 0 � E � § o 0 0 0 0 Im 0 - 2 0 0 k 0 CD c k %§ q q n o § § Z « « x z 2 _ 2 2 u< § © § m_ §b m /�/�z \ / / \ \ / / / k a a § L Lu � a z z © IA z ■ � L. 0 0 0 0 0 _ s q < u t UJ J§ �§ 7 J 7 7 7 § le § § m \ ` a j n u % % \ , ! Oir \\ \ \ u< m - b |\ . r k k 12H 2 § 0 m 2 m Go Im 2 \ q L e� 0 k k %% © $ 0 7 « ui .. ± « o m u u u u u �a_ - z < < u ■ » o k 7 § / § \ 7 § \ % I $ R § G G $ $ $ $ G I / o ■ « �_ f m# 8 f m k§ z z m � CL _ . 2 0 z I 0 § § § O o > LU \ g m q q@\ \ 2 2 lIL m f t ■ § 0 L 7 7 U \ 3 b§ S G G G 0 0 3 0 Eric Shelton From: Smith, Roy < Roy.Smith@southkingfire.org > Sent: Thursday, January 5, 2023 11:23 AM To: Eric Shelton Subject: Demolition permit Follow Up Flag: Flag for follow up Flag Status: Flagged Hi Eric, Per our conversation, please consider this email as confirmation that South King Fire & Rescue has no requirements specifically related to the demolition permit at Memorial Field, 1300 S 308th St. in Federal Way. Sincerely, Roy Smith I Deputy Fire Marshal/Lieutenant I South King Fire & Rescue I Prevention 33325 8th Ave S, Federal Way, WA 98003 Desk:253-946-7349 Mobile:206-966-8027 This email was scanned by Bitdefender Eric Shelton From: Eric Shelton Sent: Monday, January 30, 2023 10:47 AM To: King, Jonathan; Kevin Manning; Don Burnside Cc: jeremiah@sareelectric.com; Brandon Tinckham Subject: RE: 513682623 RE: Memorial Stadium Temp Power Johnathan, Just a follow up. We did have out shutdown today 4:30-6:15am to de -energize the transformers feeding the stadium/demo areas. All went well and the stadium demo area is now De -energized and the other two transformers supplying power to the main campus and Old Kitchen building are re -energized. Thank you for your help on this matter regarding PSE's approval of our planned demolition process. We will use your previous email as confirmation that PSE has no issues with the planned demolition. Thank you, Eric Shelton (He/Him) I BNBuilders 26414th Avenue. Suite 350 1 5eaftle. Yv_a 98121 206.382.3443 office 1 253.732.3231 cell 1 206.382,3440 fax From: King, Jonathan <Jonathan.King@pse.com> Sent: Thursday, January 26, 2023 4:29 PM To: Eric Shelton <Eric.Shelton@bnbuilders.com>; Kevin Manning <Kevin.Manning@bnbuilders.com>; Don Burnside <Don.Burnside@bnbuilders.com> Cc: jeremiah@sareelectric.com; Brandon Tinckham <Brandon.Tinckham@bnbuilders.com> Subject: RE: 513682623 RE: Memorial Stadium Temp Power Hello Eric, I visited your site today to verify the location of your customer owned switch. Once you have had your disconnect/reconnect completed (scheduled for the morning of Jan 30) and confirmed that power has been de - energized to the stadium/demo area and restored to the other two transformers supplying power to the campus, Puget Sound Energy has no issues with your planned demolition proceeding. Thank you, Jonathan King Project Manager Customer and System Projects PUGET SOUND ENERGY 206-452-9624 6905 S 228th ST Kent WA 98032 pse.com * PUGET SOUND ENERGY