Loading...
23-102023Electrical tyy.Davaopme l f Permit #:23-102023-00-EL Cnmmuniiy, Qevalaptneni Ilcpi. 33325 8Sh Ave S I reaeat way. WA 9sooa � Inspection Request Line: (253) 835-3050 Ph: (M) 835.2607 Fax: (253) 835.2609 FIL Project Name: MEMORIAL FIELD Project Address: 1300 S 308TH ST Parcel Number: 082104 9001 Project Description: Install sports field light poles and fixtures only for Federal Way Stadium Field. All other electrical work done by others Owner Applicant Contractor FEDERAL WAY PUBLIC SCHOOLS ASHLEY MUIR-GUILF-Lightworits Electric LIGHTWORKS ELECTRIC COMPANY 33330 8TH AVE S Company LIGHTEC9221-4 (7/23/23 FEDERAL WAY WA 98003 20915 SW 105TH AVE SUITE A 20915 SW I05TH AVE SUITE A TUALATIN OR W062 TUALATIN OR 97062 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Low Voltage - Other (Commei 4 PERMIT EXPIRES Saturday, 14 October, 2023 Permit Issued on Monday, April 17, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of 11anity-4-Federal Way. Owner or agent: Date: city or '0 Federal 'Way THIS CARD IS TO RE_1LUN ON` -SITE Construction Inspection Record INSPECTION REQUESTS. (253) 835-30-50 Scheduled inspections may be failed if this card is not on-srtr. DO NOT LOSE THIS C ?.RD. inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule uuspeetions as appropriate. Work must not be covered until it is approv ed. Check uv-ith your inspector if you are unsure about any of the inspections or the itmpectiou sequence. On -going inspections arc lo2?ed on the back of thus card. ELECTRICAL ❑ L'FER Ground (4295) Q Ditch cover (4030) El Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date Q Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date "!" Final - Electrical (4055) Approved By MECHANICAL ❑ Mechanical Rough -in (4165) Q Gas Piping (4125) 0 Final -Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING El Plumbing Groundwork (4190) 0 Rough Plumbing (4230) Approved to cover Approved By Date 11 By Date Final - Plumbing (4075) Approved Date