Loading...
23-105076City of Way De m Comunity Developclop ment Dept. FILE 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PHILLIP Project Address: 30042 12TH LN SW Project Description: Remove and replace gas furnace Mechanical Permit #:23-105076-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 515320 0230 Owner Applicant Contractor DOUGLAS & ARLENE PHILLIP JENNIFER MASTERSA A A HEATING & A A A HEATING & A/C (GENERAL) 30042 12TH LN SW AIR CONDITIONING AAAHEHA775D8(4/20/25) FEDERAL WAY WA 22641 83RD AVE S 22641 83RD AVE S 98023-3448 KENT WA 98032 KENT WA 98032 Additional Permit Information Mechanical Work Valuation?. .......... ...... ................ 5000 is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures Furnaces 1 PERMIT EXPIRES Tuesday, 9 April, 2024 Permit Issued on Thursday, October 12, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Oy4gt'� f Cit deral Way. Owner or agent: Date: CITY or -- --- Federal Way THIS C_VRD IS TO RE_1LUN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-30-50 Scheduled inspections imr, be failed if This card is :rot on -site- DO NOT LOSE THUS C-kn. Inspections are listed as close to sequential order as possible (read left to right. top to bottom),. Please schedule inspectioas as appropriate. Work must not be co-,: ered until it is appro ed. Check :vith yotu inspector if ,sou are unsure about anv of the inspections or the inspection sequence. On -Doing inspections are logged on the back of this card - ELECTRICAL ❑ B` L�R Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ Bs Slab/Concrete Floor (4255) Approved to place concrete Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Ser%ice (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panets (4045) ❑ Rough Elecfrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date BS Date B)- Date ❑ Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final - - Mechanical (4065) Approved Approved to release tat Approved B3 Date By Date By Date` PLUMBING Q Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date