Loading...
23-1051130 Plumbing city nityDFederal lopmenWay Permit #•23-105113-00-PL Community Development Dept 33325 8th Ave S Federai Way, WA98003 FILE: = Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PALISADES AT DASH POINT CONDOMINIUMS Unit 11-C Project Address: 31839 48TH CIR SW Parcel Number: 661320 0330 Project Description: PleLike For Like shower replacement using existing footprint and plumbing.ase enter a description Owner Applicant Contractor LARRY E BENGTSON MARIA BRITTONSPECIALTY SPECIALTY CONTRACTORS NW LLC 11100 MAIN ST CONTRACTORS NW, LLC (PLUMBING) BELLEVUE WA 17880 NE AIRPORT WAY SUITE 110 SPECICN793OZ (8/31/25) 98004 PORTLAND OR 97230 17880 NE AIRPORT WAY SUITE 110 PORTLAND OR 97230 Plumbing Fixtures Bathtubs 1 Showers i PERMIT EXPIRES Saturday, 13 April, 2024 Permit Issued on Monday, October 16, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of OVM I tont of Federal Way. r Own r� e o agent:Date: cnr as Federal Way THIS CARD IS TO RE-1LA1\ O\-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-30-50 Scheduled inspections nix, be failed if this card is :Lot on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible I Egad Ieft to fight. top to bottom). Please schedttIe inspections as appropfiate Work nntst not be coy: Bred 11niLI it 15 approved. Cnecl: \'Lill •vOl1r ;ILSpeCCof if ;'oil are unsuie about am of the inspections or the inspection sequence. On- going inspections are log zed on the back of this cud. ELECTRICAL L"FER Ground (4295) ❑ Ditch corer (4030) ❑ SlabiConcrete Floor (4255) Approved Approved Approved to place concrete By Date By Date B- Date ❑ PooI Bonding (4195) ❑ Temporar-y Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ FeederslSub-panets (404) ❑ Rovah Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (405.;) Approved By Date MECHANICAL ❑ Mechanical Rough -in (41653 ❑ Gas Piping (4125) ❑ Final -'Mechanical (4065) Approved Approved to release test Approved Br Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) :approved to cover Approved Approved By Date Bv Date By 1 �� Date