Loading...
23-100012City of Federat Way Community- Devciapment Dept. 33325 8th Ave S Federal Way, WA 4$903 Ph: (253) 835-26137 Fax: (253) 835-2609 Project Name: MBUGUA Project Address: 31044 20TH AVE S Building - Single Family Permit #:23-100012-00-SF Inspection Request Line: (253) 835-3050 Parcel Number: 053700 0622 Project Description: 13LUEBEAM - Interior remodel and construction of ramp for converting residence to an adult family home. Owner Applicant Contractor Lender LOISE MBUGUA GEORGE NGANGACSL DESIGNS OWNER is CONTRACTOR OWNER IS LENDER 33025 19TH CT SW 2419 SW 330TH ST FEDERAL WAY WA 98023 FEDERAL WAY WA 98023 Census Category: 434 - Residential alt/add - no change in number of units Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction T e: 'rype V - B Occupancy Load: Floor Area (sq. ft.) Additional Permit Information New / Additional Sq. Feet - 1st Floor ..................... 0 New / Additional Sq. Feet - 3rd Floor ..................... 0 Occupancy #1 - Construction Type ......................... Type V - B New / Additional Sq. Feet - Garage ........................ 0 Plumbing Work Valuation? ................. I ......... I......... 0 Number of Stories ................................................... I Is this an Online or O.T.C. application? .................. No New / Additional Sq. Feet - Total ........................... 0 Comprehensive Plan Designation ........................... SF - High -Density Residential Total Valuation: 8,000.00 New / Additional Sq. Feet - 2nd Floor ..............:..... 0 New / Additional Sq. Feet - Basement .................... 0 New / Additional Sq. Feet - Deck ........................... 0 Mechanical to be Included? ..................................... No Mechanical Work Valuation? .................................. 0 New / Additional Sq. Feet - Other ........................... 0 Plumbing to be Included? ........................................ No Occupancy #1 - Use ................................................ Residence (I or 2 family) Zoning Designation ................................................. RS 7.2 No Fixtures Associated With This Permit II PERMIT EXPIRES Saturday, 6 January, 2024 Permit Issued on Monday, July 10, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date. _�k CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 23 100012 00 Address: 31044 20TH AVE S Project: LOISE MBUGUA FEDERAL WAY WA 98003-4921 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q Footings/Setback (4110)❑ Foundation Wall (4115) 0 Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfill By Date By Date By Date Q Slab/Concrete Floor (4255) Underfloor Framing (4285) © Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date 171 Shear Walls (4245) Q Roof Sheathing (4220) 0 Fire/Draft Stops (4095) Approved to install siding Approved to install roofing Approved By Date By Date By Date Prior to scheduling a Framing inspection; 0 Framing (4120) El Insulation (4150) Electrical, Plumbing & Mechanical Rough -in Approved to insulate Approved to install wallboard and Fire/Draft Stop inspections must be signed - off and approved. IBC 109.3.4 By Date By Date Gypsum Wallboard Nailing (4130) 13 Final - Building (4050) r12 Approved to install mud & tape, Approved By Date By � Date 10 )Z��. El Rough Electrical Final Electrical Right of Way Approved Approved Approved 13) Date 13y Date By Date