Loading...
23-103493City of Federal Way Commwiity Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: COLLINS AEROSPACE Project Address: 32125 32ND AVE S Mechanical Permit #:23-103493-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 215465 0050 Project Description: BLUEBEAM - Relocation of diffusers and return grilles for tenant improvements. Owner Applicant Contractor I-5 TECH INVESTORS LLC VEN OGORODNIKPACIFIC AIR CONTROL PACIFIC AIR CONTROL INC (GENERAL) 2360 CORPORATE CIR SUITE 330 INC PACIFAC230P8 (10/1/23) HENDERSON NV 89074 1916 220TH ST SE SUITE M101 1916 220TH ST SE SUITE M 10 1 BOTHELL WA 98021 BOTHELL WA 98021 Additional Permit Information Mechanical Work Valuation? ............. .............. ..-- 28595.70 Is this an Online or O.T.C. application?.................. No Ducting Mechanical Fixtures of PERMIT EXPIRES Monday, 29 January, 2024 Permit Issued on Wednesday, August 2, 2023 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date. ITT FINALED THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 23 103493 00 Address: 32125 32ND AVE S Unit 110 Project: I-5 TECH INVESTORS LLC FEDERAL WAY WA 98001 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check -with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Mechanical Rough -in (4165) 0 Gas Piping (4125) 0 Final - Mechanical (4065) Approved Approved to release test Approved n/ % By � Date 16 By Date By G Date �/ I�1 Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date