23-105192Electrical
City of Federal Way FILFE Permit #:23-105192-00-EL
m Comunity Development Dept
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Iph: (253) 835-2607 Fax: (253) 835-2609
Project Name: FOREST LANE CONDOMINIUM
Project Address: 2100 S 336TH ST Parcel Number: 259620 0000
Project Description: REPLACING (1) HEAD ON A & REPLACING ALL CARPORT LIGHTS
Owner
Applicant
Contractor
FOREST LANE CONDOMINIUM HOA
MERIDIAN CENTER ELECTRIC
MERIDIAN CENTER ELECTRIC INC (01)
2100 S 336TH ST UNIT A-1
11 109 66TH AVE E
MERIDCE318SG (2/28/25)
FEDERAL WAY WA 98003
PUYALLUP WA 98373
11109 66TH AVE E
PUYALLUP WA 98373
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Circuits - Commercial 4
PERMIT EXPIRES Tuesday, 16 April, 2024
Permit Issued on Thursday, October 19, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
dshi�llon TNL f Federal Way.
°II
Owner or agent: Date:
�0OvI
A�
cir.r w
Federal Way
THIS CARD IS TO REII_-I1 ON -SITE
Construction Inspection Record
IISPEC'TION REQUESTS: (213) 83;-,
Scheduled inspections M7 be failed if thrs card is not an -site- DO NOT LOSE THIS CARD. Inspecti�gis are listed as close to ;equent:al order as possible
(read left to rift- tap to bottoa,- Please scheduI-tinspections as appropriate. Work mist not be covered until it is approved. Check vith your inspector if
volt are Insure about my of the inspections or the inspection sequence- On -going inspections are logged on the back of this card -
ELECTRICAL
Q
LTFER Ground (4295)
❑ Ditch cover (4030)
l_ -
SlabiConcrete Floor (4255)
Approved
Approved
Approved to place concrete
B�
Date
Bi Date
By
Date
❑
❑�
Pool Bonding (4195)
❑ Temporary Power (4275)
Service (4235)
Approved
Approved
Approved
By
Date
By Date
By
Date
0
Feeders/Sub-panels (4045)
❑ Rough Electrical (4225)
Q
Ceiling Cover (4020)
Approved
ApV C c lv e d
• sppro4 ed
By
Date
Bj• Date
Bj'
Date
Final - Electrical (4055)
By
} pproved
�dj
MECHANICAL
❑
Mechanical Rough -in (4165)
❑ Gas Piping (4125)
❑
-Final - Mechanical (4065)
Approved
Approved to release tat
Approved
B
Date
B} Date
i By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
0 Rough Plumbing (4230)
0
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By Date
By
Date