Loading...
15-106453-CN1 eral wa f l 2 t ry Jim Ferrell, Mayor January 21, 2016 Linda J Elder PO Box 3991 Federal Way, WA 98063 Be: 15-106453-00-CN; Steel lake Crest - Concurrency Decision Dear Ms. Elder: The Public Works Traffic Division has completed the Concurrency test for the subject project, consisting of 28 Single Family lots. A traffic Concurrency test summary is attached for your review. Based on the submitted information, the PW Traffic Division made the following determinations: Approved. All intersections impacted by one or more weekday evening peak hour trips from the proposed development meet the City of Federal Way LOS standards with programmed improvements. A Capacity Reserve Certificate (CRC) for the project is attached. The CRC certificate allows your project to proceed with other applicable permit processes. The CRC is valid until the development permit expires, is withdrawn or canceled whichever occur first. The CRC cannot be sold or transferred to property not included in the legal description provided by the applicant in the application for a CRC. - If you have any questions or need additional information, please feel free to contact me at (253) 835-2743 or saradv.lonpta` )ci#voffederaiwaY_com. Sincerely, Sarady Long Senior Transportation flan ineer SL:su Enclosures cc: Project File Day File I:\dept\pw4a\con currency\ 15 8 10 6453 _steel lake crest\cn approval determination letter _steel lake crest.doc 33325. 8th Avenue South, Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com PUBLIC WORKs DEPARTMENT CITY OF 33325 81h Avenue South 100 Federal Way Federal Way Fax 98835-6325 2709 253-835-2700;Fax 253-835-2749 www.ciMffederalway.com CAPA CITY RESER VE CERTIFICATE (CRC This CONCURRENCY DETERMINATION is made this 19`h day of Ianuaa 2016 by the City of Federal Way (COFW), a political subdivision of the State of Washington (hereinafter called the "City"). WHEREAS, the developer intends to develop the property described as Steel Lake Crest Preliminary Plat reviewed under City file CN Number(s)15-106453-CN (hereinafter called the "development"); and WHEREAS, RCW 36.70A requires that the City adopt and enforce ordinances which prohibit development approval if the development causes the level of service on a transportation facility to decline below the standards adopted in the comprehensive plan, unless transportation improvements or strategies to accommodate the impacts of the development are made concurrent with the development; and WHEREAS, the City adopted its comprehensive plan in November 1995; and WHEREAS, Chapter 19 of the COFW Revised Code was amended by the creation of Chapter 19.90 Division III on June 10, 2006 by Ordinance 06-525 effective January 1, 2007; and NOW, THEREFORE, a concurrency certificate is issued for the development of 28 Lots Preliminary Plat based on the facts and conditions set forth herein. Development Parameters This CONCURRENCY DETERMINATION is based on the following development: Development type: Single Family Residential Development size: 28 Lots Property address: xxxx 281h Ave S Federal Way, WA 98023 Parcel No. (s): 092104-9182, 9096, 9183, 9161 Number of New PM Peak Hour Vehicles Trips Generated: 29 Validity of Concurrency Determination This CAPACITY RESERVE CERTIFICATE is valid only for the specific development approval consistent with the development parameters and the City file number contained within this certificate. If the development is changed, expired, cancelled or withdrawn, it will be subjected to reevaluation for concurrency purposes. Terms of the Capacity Reserve Certificate This CAPACITY -RESERVE CERTIFICATE is valid until the underlying development permit_ expires, is withdrawn or cancelled, whichever occurs first. Approved By: Date:,Lj�- Printed Name: Richard A. Perez P.E Title: City Traffic Engineer CITY OF Federal Way APPLICATION (NO(S): Project Name Property Address/Location Parcel Number(s) Project Description CITYWIDE CONCURRENCY TEST SUMMARY 15-106453-CN Steel Lake Crest 092104-9182, 092104-9096, 092104-9183, 092104-9161 28 Lots Subdivision Public Works Department 33325 8th Avenue South Federal Way WA 98003-6325 253.835-2700;Fox 253-835-2609 www-cityoffederalway.co m Date: January 8, 2016 Based on the traffic distribution, intersections impacted by at least one or more evening peak hour trips were analyzed for meeting Concurrency LOS standards (v/c less than 1.2 for signalized and 1.0 for unsignalized) consistent with the City of Federal Way Transportation Concurrency Management code as described in FWRC 19.90. Table 1 below shows a summary of the LOS analysis for the study intersections with V/C ratio a ovc 0.60 for intersection outside City Center at the anticipated build -out year. Where a performance measure does not apply to the entire intersection, the table shows the measure for the worst movement of the intersection. For detailed LOS calculation, please contact the Public Works Traffic Division. Note: Any changes to the development uroiect that require additional review will he billed on an hourly basis Table 1: Concurrency Intersection Level of Service (LOS) lntersecrinn 21117 Background LDS 201'1 With Project LOS Conditions Standard Met" Condition, Standard Vic } Nice? 11) Zone }North -South Street �Earst-Chest Street VC 458 I lMiIitary Rd S I - .--. .. S Star Lake Rd - -- -- Pi 0.83 - y - t -0.84 Y 64 -t w 5 75G Mi€i Rd 5$3 - [€.ttt : ,U --0.84 1050 1 :Pacific Hwy S 1 1056 l Milita Rd S IS �. S 288 St 288 St -- _ I. " ' �-' II . I, l'•' I! 0•84 ^T0.78 --- --- 0.77 - _ � _. Y •.- ------- �_Y . 1 0.78 Y - -. 0.77 1651 ? Pacific Hwy S IS Dash Point Rd - W� 2051 IPacific Hw S I S 304 St 0.68 Y 0.68_1'. . '2058 j military Rd S 304 St W I 0.63 _ 0.64 _ 7 Y' _ 0.64 }' .1� 0.65 Y.. . -0.62 _S 2250 �IPacific Hw S IS 3 308 St --- 2540 l Ave S S 312 St -_ I: f 0.62 Y _ _ Y' .; - - - 2545 8 Av S _ - - -- - -.8 S 312 St III 0.75 -0.85- . - ) 0.75 1' _ - - 2546 Av S 7 8 Av 5 S 31_2 St _ _ 8_ 12 Bl _:, . -_.. I. b.74 1 _ t:r <- - 0.86 1 Y - U.75 �'•Y:"':. 3028 121 Av SWSW W _t_ 320 St O.T4� 0.67 - _0.7_4� y1_ . - 0.74 .Y. - Y 0.68 Y - 0.74 L-Y - 3040 _J _ �� 1 Av S _ - S 320 St 3046 l 8 ave S S 320 St W�W � 3060 I 32 Av S IS 320_St 0.63 0.d7 _;Y N. Y.v 0.63 l ! - 0.67 Y S S 320 St .3061 } Weyerhaeuser Wy - W 0.97;- 4050 I Pacific Hwy S S 336 St _ 0.97� 0.81 0.86� _ -�( � Y -- Y, ^ - 0.82 j ` } _ 0.86 I X 4250 (Pacific Hw�yrS 4848Pacific Hwy S S 340 St S 348 St ~ 0.94 u 0.94 1: 850 _ 16 Av S _�� - --- -- 5050 Enchanted PkwX S 5246 Pacific Hwy S_ SR 18 _ S 352 St _ _ S 356 St -_-- _ - 0.67 0.81 - - 9' ~ --------- . 0.67 Y 0.80 �( - Enchanted 5251 I Pkwy S S 356 St 0.78 y i. N. i5340 i�- tPacitieHpoj3 � i:83T33E ^�0.7 ";.. .'; 0.7{1 V. .. All intersections outside the City Center met the City of Federal Way LOS standards: Yes Test Result: If "Fail", identify intersections and possible mitigation: For sizfF uSet Passed: _':E� Fail: Concurrency Test performed by: Saradv Long Date L:\DEPT\PW\TRA\Concurrency\158106453_SteeI Lake Crest\Concurrency LOS Summary HE CITY OF �Federal Way APPLICATION (NO(S): Project Name Property Address/Location Parcel Number(s) Project Description Public Works Department CITY CENTER CONCURRENCY TEST SUMMARY 33325 8th Avenue South Fede298003-6325 253835a[W}ayWA53-835-2609 www.cityoffederalway.com 15-106453-CN Date: January 8, 2016 Steel Lake Crest 0 092104-9182, 092104-9096, 092104-9183, 092104-9161 28 Lots Subdivision Based on the traffic distribution, intersections impacted by at least one or more evening peak hour trips were analyzed for meeting concurrency LOS standards (v/c less than 1.1) consistent with the City of Federal Way Transportation Concurrency Management code as described in FWRC 19.90. Table 1 below shows a summary of the LOS analysis for the study intersections at the anticipated build -out year. For all other study intersections and detailed LOS calculation, please contact the Public Works Traffic Division. Note: Anv changes to the development project that reauire additional review wlll be billed on an hourly basis. Table 1: City Center Zone Concurrency Level of Service (LOS) Intersection 2017 Background LOS 2017 VYith Projrrt I.OS Conditions V/C Standard Met? C'ottditigns Vic Standard Met? ID _ _Zone North -South Street East-West Street 2549 CC 14 Av S S 312 St _ _ �__ .. 0.5 0.50 '2550 CC_ Pacific Hwy S S 312 St_ 0.73 0.73 __ 2552 T CC_ 20 Av S �_��_���S 312 St __— _ _ — --- _ ---------- [1.3y 2554 CC CC 23 Av S _ S 312 St 0.42_ 0.42 2652 ^ACC 20 Av S S 314 St — -- 0.35� r 0.15 2654 CC 123 Av S I S 314 St 0.23 re ` 0.23 2750 � ^ CC 1 Pacific Hw S � 1 S 316 St 0.76 _ 0.47 — 0.33~ -� LI „ i r a N 0.76 0.4'+ 034 2752 CC_120 Av SS 316 St _ 2754 CC_ 23 Av S_-�— —�-� ; S 316 St — ..W —� — —;S 2855 CC_j23 Av S 317 St 0.61 0.61. 3048 _ CC—ri I Pl S ; S 320 St 0.86 0,86 3050 __ -� W CC Pacific Hwy S *:S 320 St 0.8 0.80 3052 _ CC ?'20 Av S _ _ '-IS 320 St _ 0.74 82 _ 0.82 0,74 0.82 3055 CC-123 Av S �Y — ;IS 320 St ---_____— .--._..........._.,.-._.......__.__ _._____Y______� 3056 I CC 1 Gatewa Blvd S S 320 St 0.67 0.67 t 3057 CCµ}I-5 SB Rri S 320 St 0.63 0.63 3255 CC 123rd Ave S _— lS 322nd St - 0.19 [1.1 1J 3348 S� CC 11 Pi S �S 324 St 0.25 0.25 _ _ 3350 CC ElPacific Hwy T �— ;S 324 St -- - --� 6.82 0.82 CC Average v/c Ratio = 0.56 Y :: 0.56 All signalized City Center intersections met LOS standards: Concurrency Test Result: [f "Fail", identify intersections and possible mitigation: 1��ar itn#1 h5r rhaiti: Passed: !FE Fail: urrency Test performed by: Sarady Long Date I Z0 L:\DEPT\PW\TRA\Concurrency\158106453_Steel Lake Crest\Concurrency LOS Summary 1/1