Loading...
14-104714-ADCITY OF . Federal Way October 9, 2014 Hoong Park 12218 Pacific Hwy SW Lakewood, WA 98499 CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com RE: P-ermit-#14 1047-14-00-AD;-HOONC_RARK SHORE-P-LAT�-- — - — -- 2814 South 2881h Street, Federal Way Dear Mr. Park, The Community Development Department has received your letter requesting a two-year extension to the Hoong Park Short Plat, a subdivision of one residential lot into two single-family residential lots. The site is located at 2814 South 28e Street, Federal Way (Parcel #3322049131). The proposal was granted preliminary approval on December 2, 2009, and is set to expire on December 2, 2014. This is a first time request to the initial approval. To date, an engineering permit has not been issued. The time extension request is hereby granted approval subject to the conditions listed below. EXTENSION CRITERIA Pursuant to Federal Way Revised Code (FWRC) 19.15.110, "Lapse of Approval — Time Extension," the director may grant a two-year extension to the land use decision, subject to the following criteria: a) Except for the first request for time extension, the applicant has made substantial progress to complete the project; Staff Response: This is a first time request. Staff finds criterion (a) not applicable. b) There are circumstances beyond the applicant's control, which prevent compliance with the time limits of FWRC 19.15.100, or any previously granted extension; Staff Response: The City agrees that the economic climate has changed significantly since the time of the original approval. Additionally, the health conditions of the applicant have hindered progress towards finalizing the plat. Both of these circumstances are beyond the applicant's control. Staff f nds criterion (b) has been met. c) The extension will not create or continue conditions that constitute a code violation or an attractive nuisance, contribute to erosion and sedimentation problems, or impact the public health, safety and welfare; and Staff Response: The project site remains unchanged, and there are no conditions that create a code violation or an attractive nuisance. Staff finds criterion (c) has been met. d) Whether either physical conditions in the vicinity of the project or codes and requirements of the city, applicable agencies, and utility providers have changed to such a degree since initial approval that it would be contrary to the public interest to extend the life of the project, including but not limited to such factors as: Mr. Park October 9, 2014 Page 2 i. Whether the adoption of new codes/standards would substantially affect project layout and storm drainage design; ii. T e adequacy of mitigation and/or impact fees to address the cost of mitigation at the end Af2Le expiration period; i er the delayed project is an impediment to other development projects in the cinity as a result of traffic concurrency reserved capacity. ff sponse. While physical conditions in the vicinity of the project have not changed, the City dopted new codes and standards that would substantially affect project layout, storm crinage design, impact fees, and concurrence capacity as discussed under FWRC 19.15.110(2)(d). In light of the extension request, Public Works staff has identified specific mitigation to address criteria (2)(d) ofFWRC 19.15.110. CONDITIONAL APPROVAL 1. The project must meet stormwater regulations in place at the time of submittal, which is currently in the 2009 Ding County Surface Water Design .Manual (KCSWDM). 2. Pay the Transportation Impact Fee (TIF) to be determined by the fee schedule in effect at the time of plat recording. For estimation purposes, the current TIF fee (2014 rate) is approximately $3,111.94 for each new single-family dwelling unit. CLOSING Unless modified or appealed, this two-year extension of the land use decision will be valid until December 2, 2016. If no further action is taken by this extension deadline (action of beginning construction or submitting to the City a complete building permit application), the decision becomes void. FWRC 19.15.110 does permit additional extension opportunities that can be granted only if applicable criteria are met. Under FWRC 19.15.110(5), this extension decision may be appealed by any person who is aggrieved by this decision. The appeal must be in the form of a letter delivered to the Department of Community Development, and be accompanied by the established fee, within 14 calendar days of the date of this extension decision. Please contact Planning Intern Kalon Thomas, at 253-835-2622 or kalon.thomas@cityoffederalw4y.com should you have any questions about this letter. Sincerely, Isaac Conlen, Planning Manager for Larry Frazier, Interim Director c: Kalon Thomas, Planning Intern Becky Chapin, Associate Planner Ann Dower, Senior Engineering Plans Reviewer Sarady Long, Senior Transportation Planning Engineer 14-104714 Doc. I.D. 66838 Kalon Thomas From: Ann Dower Sent: Friday, September 26, 2014 2:33 PM To: Kalon Thomas Subject: Hoong Park Short Plat Hi Kalon - This extension will need to meet storm water regulations that are in place at the time of submittal, which is currently the 2009 King County Surface Water Design Manual. No other comments. Ann Dower 33325 8th Avenue South Federal Way, WA 98063 Phone: (253) 835-2732 Fax: (253) 835-2709 RECEIVED BY AD # 14 — 1 ()4q- COMMUNITY & EC( MIC DEVELOPMENT DEPARTMENT SEP 15 2014 TO: ATTN: Becky Chapin (Associate Planner) CITY OF FEDRAL WAY FROM: Hoong Park 12218 Pacific Hwy SW Lakewood, WA 98499 (253) 507-0820. Title: First Time Extension of Short Subdivision (2814 South 288t' Street, Federal Way, WA. 1 am glad to meet you to discuss about the 2 year extension on Sept 10, 2014 at F.W. city hall. Yes, I want to extend my SHORT Subdivision of above property.( File #08-105831-00-SU) Last 4 years, I was so sick that I could not do anything right in my life. Even modern medicines and UW medical doctors gave up their hands on my extreme Skin disease. However, I am recovering from it by the miracle hands on me. Thanks God of it. After 1 got the extension, I will contact my previous Surveys Company to finish up this project. 1 am sure they will contact you to wrap up this project within two years. Thank you for your kindness again. Hoong Park. Sept. 11, 2014. - �! CG: R-0 ��f na PS'-6- 2�4G. CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: September 18, 2014 TO: Ann Dower, Senior Engineering Plans Reviewer Sarady Long, Senior Transportation Planning Engineer 1�ZIZu� FOR DRC MTG. ON.• FILE NUMBER(s): RELATED FILE NOS.: PROJECT NAME: PROJECT ADDRESS ZONING DISTRICT.• Kalon Thomas No meeting - please email comments (kalon.thomas@cityoffederalway.com). 14-104714-00-AD 08-105831-00-SU Hoong Park Short Plat 2814 S 288t' St RS 7.2 PROJECT DESCRIPTION. Request for extension of Preliminary Plat Approval, 08-105831-00-SU, 2 years. LAND USE PERMITS: Preliminary Plat, SEPA PROJECT CONTACT. • Robert Bennett Bennett PS & E, Inc P.O. Box 1031, Puyallup, WA 98371 253-836-2288 PSE@OZ.net MATERMLS SUBMITTED: • Letter dated September 11, 2014 requesting a two year extension of short subdivision preliminary plat approval. • Preliminary Short Subdivision Approval, dated 12/2/2009 ■ Exhibit A- Statement of Facts and Conclusions, dated 12/2/2009