Loading...
18-101975-PCCITY OF Federal Way June 11, 2018 1F Ell LE CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway.. com Jim Ferrell, Mayor Eugene Han hansremanagement _,z mail.com 21021 76`h Ave West, #76 Edmonds, WA 98026 Re: File #18-101975-00-PC, PREAPPLICATION CONFERENCE SUMMARY Han Fast Food, 32108 391h Avenue South, Federal Way Dear Mr. Han: Thank you for participating in the preapplication conference with the City of Federal Way's Development Review Committee (DRC) held May 23, 2018. We hope that the information discussed at that meeting was helpful in understanding the general requirements for your project as submitted. This letter summarizes comments given to you at the meeting by the members of the DRC. The members who reviewed your project and provided comments include staff from the City's Planning and Building Divisions and Public Works Department, and representatives from Lakehaven Utility District and South King Fire and Rescue. Some sections of the Federal Way Revised Code (FWRC) and relevant information handouts are enclosed with this letter. Please be advised, this letter does not represent all applicable codes. In preparing your formal application, please refer to the complete FWRC and other relevant codes for all additional requirements that may apply to your project. The key contact for your project is Jim Harris, 253-835-2652, jim.harris@cityoffederalway.com. For specific technical questions about your project, please contact the appropriate DRC representative as listed below. Otherwise, any general questions about the preapplication and permitting process can be referred to your key contact. PROJECT DESCRIPTION Proposal to demolish existing single family residence and commercial nursery and construct 3,770 sf fast food restaurant and 2,135 sf coffee shop drive-thru. Divide property into 2 lots. MAJOR ISSUES Outlined below is a summary of the major issues of your project based on the plans and information submitted for preapplication review. These issues can change due to modifications and revisions in the plans. These major issues only represent comments that the DRC consider most significant to your project and do not include the majority of the comments provided. The major issues section is only provided as a means to highlight critical requirements or issues. Please be sure to read the entire department comments made in the next section of this letter. .Mr. Han June 11, 2018 Page 2 ■ Planning Division Use Process III and SEPA review required. • Public Works Development Services Division This project is subject to the requirements of the 2016 King County Surface Water Design Manual and the City of Federal Way Addendum. This includes meeting Conservation Flow Control, Enhanced Basic Water Quality Treatment and Best Management Practices requirements. • Public Works Traffic Division ■ Transportation Concurrency Management (FWRC 19.90) — A transportation concurrency pen -nit with application fee of $4,790.00 is required for the proposed project. ■ Traffic Impact Fees (FWRC 19.91) — Traffic impact fees are required for fast-food restaurants. ■ Transportation Impact Analysis (TIA) — A queuing study prepared by a licensed engineer in Washington may be required. • Frontage Improvements (FWRC 19.135.040) — Construct street frontage improvements and dedicate right-of-way (ROW) along the property frontage on S 320th Street, Military Rd S, and 39th Ave S. • Access Management (FWRC 19.135.260) — The development shall meet access management standards. ■ Block Perimeter (FWRC 18.55.010 & FWRC 19.135.251) — The development shall meet block perimeter requirements of 1,320 feet for non -motorized access, and 2,640 feet for streets. ■ Intersection Sight Distance — Submit intersection sight distance analysis consistent with AASHTO guidance. DEPARTMENT COMMENTS Outlined below are the comments made by the representatives of each department present at the preapplication conference. Each section should be read thoroughly. If you have questions, please contact the representative listed for that section. COMMUNITY DEVELOPMENT — PLANNING DIVISION (Jim Harris, 253-835-2652, j im. harris@cityoffed eralway.com) Zoning Designation and Use — The subject property is located in a Neighborhood Business (BN) zoning district. The master land use application form submitted for the preapplication conference identifies retail use; however, the site plan identifies two fast food restaurants with drive-thru lanes. Therefore, the Development Review Committee is reviewing the proposal as fast food use. Fast food is a permitted use in the BN zone per FWRC 19.215.020. 2. Land Use Application — Fast food use is permitted subject to the required Use Process II review. However, as proposed, the development project will require a Use Process III application due to the required environmental review explained in item #3 below. Use Process III is an administrative review conducted by city staff with a final decision rendered by the Director of Community Development. State Environmental Policy Act (SEPA) Environmental Review — The proposed development requires environmental review as the proposal exceeds the following State Environmental Policy Act 18-101975-00-PC Doc ID:77712 Mr. Han June 11, 2018 Page 3 (SEPA) flexible thresholds adopted by the city set forth in FWRC 14.15.030(1)(c) - Office, commercial, recreational, service or storage buildings up to 12,000 square feet and up to 40 parking spaces. In your environmental checklist, you will also need to address the building demolition. The environmental review is conducted concurrently with the Use Process III application and a completed environmental checklist will be required. An environmental threshold determination made by the Director must be issued prior to the Process III land use decision. 4. Land Use Review Timeframes — The Planning Division will notify the applicant of application status within 28 days of submittal. If the application is determined complete, staff will issue a Letter of Complete Application. FWRC limits the administrative review to 120 days from the date of complete application. However, the review timeframe is suspended at any time that additional information is requested by the City. The applicant must submit requested information within a 180- day timeframe, unless an extension is granted pursuant to FWRC 19.15.050(2). 5. Public Notification — Process III applications and SEPA determinations require public notice. Within 14 days of issuing the Letter of Complete Application, a Notice of Application for the Use Process III will be published in the Federal Way Mirror, posted on the subject property, placed at the City's three designated notice boards, and mailed to all property owners located within 300 feet of the site. The mailed notice is required for projects which are located 300 feet from property zoned SE (suburban estates), RS (single-family residential) or RM (multifamily). Notice for the SEPA determination will be given simultaneously. The applicant is required to submit two sets of stamped mailing envelopes and a map showing the subject property and the 300-foot radius map for the mailing. A mailing labels handout is enclosed, and identifies a City service offering to prepare the required mailing labels. 6. Binding Site Plan — Division of any land for sale or lease which is classified for commercial, business, office, or industrial development, or which is to be developed as a manufactured home park shall be required to obtain an approved binding site plan (BSP) in accordance with FWRC 18.20. A binding site plan shall be submitted according to the requirements for content and form for short subdivisions per FWRC 18.20.020. Binding site plans are processed under the provisions of short short subdivisions in FWRC 18.30. Pursuant to FWRC 18.30.010, short plat (and binding site plan) applications are administratively processed through the Department of Community Development. The administrative review process requires that the Director of Community Development issue a decision on the binding site plan request and confirm conformance with FWRC 18.30.110(2). Public notice of the complete binding site plan proposal is required per FWRC 18.30.080, and a 15-day public comment period is provided. However, no public hearing will be required unless an appeal is filed. If the director issues an approval of the binding site plan, the approval typically includes and requires construction of associated infrastructure improvements. As required by the city's Public Works Department, all infrastructure improvements must be designed, reviewed, and constructed prior to recording the binding site plan. 18-101975-00-PC Doc ID:77712 Mr. Han June 11, 2018 Page 4 Prior to construction of binding site plan, engineering approval must be granted by the Public Works Department. Please see Development Services Manager Cole Elliott's comments below for specific information regarding engineering requirements. A master land use application and short plat handout are enclosed; relevant code sections can be accessed at: www.codet)ul)lisliiiiig.coiii/WA/Federal. 7. Critical Areas —No critical areas or buffers are shown on the city's inventory in relation to this property. 8. General Zoning Regulations — Use Zone Chart 19.215.020 provides regulations for fast food restaurant uses in the BN zone. The following list is only a portion of the zoning regulations governing the proposed use in the BN zone. The applicant should consult the referenced Use Zone Chart prior to submitting a Master Land Use application. a. Setbacks — 0-ft. front/(either north or east property line, 10-foot minimum along other frontage, and 20-foot building setback per note 3, along south and west property lines adjacent to residential zones. b. Maximum Height — 35 ft. above Average Building Elevation (ABE), with limitation of maximum height of 30 feet above ABE within 100 feet of residential zone, (30 foot max. applies for much of the site). c. Parking — 1 space for each 80 square feet of gross floor area for fast food. The conceptual site plans are deficient and do not provide the required parking stall count. d. Lot Coverage — No maximum lot coverage applies to the proposed use. e. Hours of operation of these uses may be limited to reduce impacts to nearby residential uses, per note 4. f. Drive -through — Access to and from the drive -through facilities must be approved by the Public Works Department. Drive -through facilities must be designed so that vehicles will not block traffic in the street while in line and will not unreasonably interfere with on -site traffic flow. [See also Community Design Guidelines related to drive -through facilities, in the next section.] 9. Community Design Guidelines — Review of the proposal under the city's design guidelines, FWRC Chapter 19.115, is required for the project and will occur in conjunction with the Use Process review. The principle applicable guidelines for the project are noted below. However, this does not necessarily include all applicable guidelines, and project designers must consult the guidelines in their entirety in preparing an application. The application must include a written narrative identifying how the proposal complies with the applicable design guidelines, as detailed. FWRC 19.115.010(2) CPTED — Implement Crime Prevention through Environmental Design (CPTED) principals to reduce opportunities for criminal activities to occur. The city's Police Department and Planning Division will evaluate the formal application and review for compliance with CPTED principals. A completed CPTED checklist must be submitted with your application. 18-101975-00-PC Doc D177712 Mr. Han June 11, 2018 Page 5 i. Natural Surveillance — Promote visibility of public spaces and areas. ii. Access Control — Identify techniques that deter unauthorized access and/or inappropriate access. iii. Ownership — Reduce perception of areas as ownerless. b. FWRC 19.115.050 Site Design — Refer to all sections of this chapter for site design standards. Key sections include: i. (1) General Criteria (b), (c), (d), (e), (f), and (g) ii. (2) Surface Parking Lots (a), (b), (c) and (e) iii. (4) Pedestrian Circulation and Public Spaces (a), (b), (c), (d), (e) and (f) iv. (5) Landscaping v. (6) Commercial service (a) and (b) vi. (7) Miscellaneous (a) and (b) 1. (b) Drive-thru facilities, such as banks, cleaners, fast food, drug stores and service stations, etc., shall comply with the following: (i) Drive-thru windows and stacking lanes are not encouraged along facades of buildings that face a right-of-way. If they are permitted in such a location, then they shall be visually screened from such street by Type III landscaping and/or architectural element, or combination thereof; provided, such elements reflect the primary building and provide appropriate screening. (ii) The stacking lane shall be physically separated from the parking lot, sidewalk, and pedestrian areas by Type III landscaping and/or architectural element, or combination thereof-, provided, such elements reflect the primary building and provide appropriate separation. Painted lanes are not sufficient. (iii) Drive-thru speakers shall not be audible off site. (iv) A bypass/escape lane is recommended for all drive-thru facilities. C. FWRC 19.115.060 Building Design — Key design requirements of this section apply to the project as follows. i. (1)(c) Materials and design features of fences and walls should reflect that of the primary building(s) and shall also meet the applicable requirements of FWRC I9.I20.I20, Rockeries and retaining walls. ii. (2) Note: It appears that several facades are 60 feet or greater in length and will be visible from either public rights -of -way and/or nearby residential uses, and therefore must implement at least two of the four following options on each facade. Options intended to break up the mass of large buildings include fagade modulation, landscaping, canopy or arcade, and associated pedestrian plazas. iii. (3) Building facades shall also include methods of articulation and accessory elements, for example display windows, window openings with visible trim material, vertical trellis, artwork, decorative masonry or metal patterns or grillwork, relief, material variations, etc. 1. See provisions regarding articulation of blank walls. d. FWRC 19.115.070 Building and Pedestrian Orientation — Design requirements of this section apply to the project as follows: (1) (a-d). e. FWRC 19.115.090(1) District Guidelines for BN— Key design requirements of this section apply to the project (F)VRC 19.115.090(1)(a)-(f)). 18-101975-00-PC Doc ID:77712 Mr. Han June 11, 2018 Page 6 10. Signage — See FWRC 19.140 for specifics about sign requirements. Separate sign permits are required. 11. Rockeries — See FWRC 19.120.120 for specifics about retaining wall requirements of height, location, landscaping and material composition. 12. Landscaping — Landscape requirements are contained in FWRC Chapter 19.125 "Outdoors, Yards, and Landscaping." Following are the key landscape requirements for the project. (a) Per FWRC 19.125.060.5, for properties within the Neighborhood Business, BN zone: 1. Type I landscaping a minimum of 15 feet in width shall be provided along the perimeter of property abutting a residential zoning district (west and south property lines). 2. Type III landscaping five feet in width shall be provided along all properties abutting public rights -of -way and ingress/egress easements. (b) Per FWRC 19.125.040.4, all trash enclosures shall be screened from abutting properties and/or public rights -of -way by a 100 percent sight -obscuring fence or wall and appropriate landscape screen. (c) Per FWRC 19.125.040.22, building walls which are uninterrupted by window, door, or other architectural feature(s) listed in Chapter 19.115 FWRC, Community Design Guidelines, FWRC 19.115.060(3)(b), that are 240 square feet or greater in area, and not located on a property line, shall be screened by landscaping. Such planting shall include trees, shrubs and groundcover appropriate for the area proposed. (d) Per FWRC 19.125.070.2.a, required interior parking lot landscape areas shall be provided at the following rate within paved areas: commercial developments shall provide the following: twenty-two square feet per parking stall when 50 or more parking stalls are being provided. 13. Tree Density Requirements — A tree/vegetation retention plan shall be submitted with the Process III application. The plan must be prepared by a registered landscape architect and may be incorporated into the overall landscape plan. The minimum tree density requirements for BN zones is 20 tree units per acre. A tree unit worksheet must be completed and submitted with the Process III application. Generally, a tree unit is a value placed on the size of a retained tree and a replaced tree (i.e., the larger the tree the higher the value). Retained trees are valued higher at a range of 1 to 3 tree units depending on the diameter at breast height (dbh). Replacement trees are valued between .50 and 1.5 depending on the mature canopy area of the species. Required perimeter landscaping and internal parking lot landscaping are counted toward meeting the tree unit requirements. Replacement trees are assigned tree units from 0.5 to 1.5 depending on species size. A matrix of the tree units is provided in FWRC 19.120.130-2. 14. Clearing & Grading — The applicant is required to provide a preliminary clearing and grading plan as a component of Process III approval. Consult FWRC 19.120.040(1) for items that are required to be included on the plan including the anticipated amounts of cut and fill. Any needed rockeries or retaining walls must be limited to six feet in height as measured from finished grade at base of wall to top of wall with a minimum three-foot landscaped setback at the base of each rockery or retaining wall. Rockeries and retaining walls visible from a public right-of-way or adjacent property shall be composed of rock, brick, or other textured/patterned wall styles. 18-101975-00-PC Doc ID:77712 Mr. Han June 11, 2018 Page 7 15. Parking Lot Design — Design criteria is based on the enclosed department handout. Typical 90- degree design standards are 9'x18' stalls with 25.5' drive aisles. Up to 25 percent of the required stalls may be designated compact at 8'xl5' with 25.5' drive aisles. Wheel stops shall be provided on all stalls adjacent to pedestrian pathways. 16. Rooftop Mechanical Equipment — Per FWRC 19.110.070, heating ventilation and air conditioning, mechanical equipment, and similar appurtenances that extend above the roofline must be surrounded by a solid sight -obscuring screen that is integrated into the architecture of the building and obscures the view of the appurtenances from adjacent streets and properties. Please provide screening details on the elevation drawings. 17. Garbage and Recycling Enclosure — Per FWRC 19.125.150, the design of the enclosure area should be consistent with the architectural design of the primary structures on the site. The enclosure shall be screened from the abutting property by a 100 percent sight -obscuring fence or wall. Storage areas shall not interfere with the primary use of the site. The enclosure area shall be located so that collection of materials by trucks will not burden pedestrian or vehicular movement. The storage area shall not be located in areas incompatible with noise, odor, and increased pedestrian and vehicle traffic. 18. Time Limitations — The applicant must substantially complete construction for the development activity and complete the applicable conditions listed in the decision within five years after the final decision. Requests for time extensions may be granted by the Director of Community Development if criteria set forth in FWRC 19.15.110 can be met. 19. Application Fees —Please contact the Permit Center at 253-835-2607 for updated fee schedules for Use Process III application, SEPA checklist, concurrency, engineering review, and building permit. PUBLIC WORKS DEVELOPMENT SERVICES DIVISION (Cole Elliott, PE, 253-835-2730, cole.elliotW,ci offederalwa .corn ) Land Use Issues — Stormwater 1. Surface water runoff control and water quality treatment will be required per the 2016 King County Surface Water Design Manual (KCSWDM) and the City of Federal Way Addendum to the manual. This project meets the requirements for a Full Drainage Review. At the time of land use site plan Binding Site Plan submittal, a preliminary Technical Information Report (TIR), addressing the relevance of the project to the nine core and five special requirements of the KCSWDM will be required. A Level 1 downstream analysis shall also be provided in the preliminary TIR. The City Addendum can be found at the following website: www.ei!yoffederalway.com/node/1 467. 2. The project lies within a Conservation flow control area, thus the applicant must design the flow control facility to meet this perfonnance criteria. In addition to flow control facilities, Best Management Practices (BMP's) are required as outlined in the KCSWDM. The project also lies within an Enhanced Basic Water Quality Area. Water Quality Treatment shall be designed to meet the treatment criteria of the Enhanced Basic Water Quality Menu. 18-101975-00-PC Doc ID:77712 Mr. Han June 11, 2018 Page 8 3. In addition to the KCSWDM, our initial review suggests that FWRC Section 19.30.120, "Nonconforming Water Quality Improvements" applies to this site. Specifically, the following items are applicable: Lb. Redevelopment which involves the construction or replacement of a building footprint or other structure having a surface area of 5,000 square feet or more, or which involves the expansion of a building footprint or other structure by 5,000 square feet of surface area or more; l.c. Redevelopment which involves the repair or replacement of 5,000 square feet or more of an impervious surface, when such redevelopment is not part of a routine maintenance activity; 1.d. Redevelopment which involves the collection and/or concentration of surface and/or stormwater runoff from a drainage area of 5,000 square feet or more; Therefore, water quality treatment will be required for the entire site, including new and existing pollution generating impervious surfaces. Treatment options must be selected from the Enhanced Basic Water Quality Menu provided in the KCSWDM. 4. If infiltration is proposed, soil logs prepared by a licensed geotechnical engineer or septic designer must be provided to verify infiltration suitability. 5. Detention and water quality treatment facilities for subdivisions are required to be above ground (i.e. an open pond), within a separate storm drainage tract, and dedicated to the City for future maintenance. Detention and water quality facilities may be within the same tract. Underground facilities are allowed only with approval from the City of Federal Way Stormwater Management Division. 6. Detention and water quality facilities for private commercial developments within the City Center Core may be placed underground. 7. Detention and water quality facilities for private commercial developments outside the City Center Core must be above ground (i.e. open pond). For short plats, the detention and water quality facilities shall be within a separate tract, which will be owned and maintained by the owners of the platted lots. Underground facilities are allowed only with approval from the City of Federal Way Public Works Department. 8. Show the proposed location and dimensions of the detention and water quality facilities on the preliminary plans. 9. If more than one acre will be disturbed during construction, a National Pollutant Discharge Elimination System (NPDES) construction storm water permit may be required. Information regarding this permit can be obtained from the Washington State Department of Ecology at littp://www.ea.wa.gov/programs/wq/stormwater/`construction/index.html or by calling 360-407- 6048. 10. If work is to be done below the ordinary high water mark, a Hydraulic Project Approval (HPA) permit may be required. Information regarding this permit can be obtained from the Washington Department of Fish and Wildlife. 18- 101 975-00-PC Doc 11):77712 Mr. Han June 11, 2018 Page 9 Right -of -Way Improvements 1. See the Traffic Division comments from Erik Preston, Senior Traffic Engineer, for traffic related items. 2. If dedication of additional right-of-way is required to install street frontage improvements, the dedication shall be conveyed to the City through a statutory warranty deed. The dedicated area must have clear title prior to recording. 3. All stormwater treatment and detention requirements outlined above may apply to any improvements within the public right-of-way. 4. FWRC 11.05.110 requires that overhead utility lines be relocated underground if over 500 feet, or three spans are affected by a project. This condition will be applied to Military Road S. EN Permit Issues 1. Engineered plans are required for clearing, grading, road construction, and utility work. Plans must be reviewed and approved by the City. Engineering review fees for binding site plans are $1,669 for the first 12 hours of review. Additional review time is charged at $139 per hour. A final TIR shall be prepared for the project and submitted with the engineering plans. Both the TIR and the plans will require the signature/seal of a professional engineer registered/licensed in the State of Washington. 2. In addition to engineering approval, short plats and subdivisions are required to obtain a separate permit for grading. Details and fees may be obtained from the Building Department. 3. The Federal Way Public Works Development Standards Manual (including standard detail drawings, standard notes, and engineering checklists) is available on the City's website at: www.cityoffederalwM.com/node/ 1467 to assist the applicant's engineer in preparing the plans and TIR. 4. Bonding is required for all street improvements and temporary erosion and sediment control measures associated with the project. The bond amount shall be 120 percent of the estimated costs of the improvements. An administrative fee deposit will need to accompany the bond to cover any possible legal fees in the event the bond must be called. Upon completion. of the installation of the improvements, and final approval of the Public Works Inspector, the bond will be reduced to 30 percent of the original amount and held for a two-year maintenance period. 5. The developer will be responsible for the maintenance of all storm drainage facilities (including the detention and water quality facilities) and street systems during the two-year maintenance period. During that time, the Public Works Inspector will make periodic visits to the site to ensure the developer's compliance with the maintenance requirements. Upon satisfactory completion of the two-year maintenance period, the remainder of the bond will be released. Maintenance for public roads and subdivision drainage facilities then become the responsibility of the City. Maintenance for private roads and drainage facilities, including short plats, remain the responsibility of the individual property owners. 18-101975-00-PC DocID:77712 Mr. Han June 11, 2018 Page 10 6. When topographic survey information is shown on the plans, the vertical datum block shall include the phrase "DATUM: N.G.V.D.-29" or "DATUM: K.C.A.S.," on all sheets where vertical elevations are called out. 7. Drawings submitted for plan review shall be printed on 24" x 36" or 22" x 34" paper. Site plans shall be drawn at a scale of 1" = 20', or larger. Architectural scales are not permitted on engineering plans. Provide cut and fill quantities on the clearing and grading plan. 9. Temporary Erosion and Sediment -control (TESC) measures, per Appendix D of the 2016 KCSWDM, just be shown on the engineering plans. 10. The site plan shall show the location of any existing and proposed utilities in the areas affected by construction. PUBLIC WORKS TRAFFIC DIVISION (Erik, Preston, PE, 253-835-2744, erik.preston(a)cityoffederalwa'y.com) Transportation Concurrency Analysis (FWRC 19.90) Based on the submitted materials for 5,026 square feet of fast food restaurant and estimated credits for existing uses, using the Institute of Transportation Engineers (ITE) Trip Generation - 10U' Edition, land use code 210 (Single -Family Detached Housing), land use code 817 (Nursery (Garden Center)) with a pass -by rate of 26%, and land use code 934 (Fast -Food Restaurant with Drive-Thru Window) and a pass -by rate of 50%, the proposed project is estimated to generate approximately 22 new weekday PM peak hour trips. Alternatively, the applicant may submit a site -specific trip generation study for the proposed development. 2. A concurrency permit is required for this development project. The PW Traffic Division will perform concurrency analysis to determine if adequate roadway capacity exists during the weekday PM peak period to accommodate the proposed development. Please note that supplemental transportation analysis and concurrency mitigation may be required if the proposed project creates an impact not anticipated in the six -year Transportation Improvement Plan (TIP). The estimated fee for the concurrency permit application is $4,790.00. This fee is an estimate and based on the materials submitted for the pre -application meeting. The concurrency application fee must be paid in full at the time the concurrency permit application is submitted with land use application. The fee may change based on any changes in the estimated weekday PM peak hour trips as identified in the concurrency application. The applicant has the option of having an independent traffic engineer prepare the concurrency analysis consistent with City procedures; however, the fee remains the same. Transportation Impact Fees (T1F) (FWRC 19.91) Based on the submitted materials for 5,026 square feet of proposed fast food restaurant and credits for 11,466 feet of existing nursery and one single-family residence, the estimated traffic impact fee is $125,637.00. Please note, the actual impact fee will be calculated based on the fee schedule in effect at 18-101975-00-PC Doc ID:77712 Mr. Han June 11, 2018 Page 11 the time a completed building permit application is filed and paid prior to permit issuance (F)vVRC 19.100.070 3(a)). Transportation Impact Analysis (TIA) (FWRC 19.135) 1. A drive-thru queuing study prepared by a licensed engineer in the State of Washington may be required to assess internal drive-thru queuing and its effect on site access, depending on the site layout chosen. Such a queuing study would be required for the northern restaurant in Scheme 9 if King County permits a driveway on S 320th St. 2. An intersection sight distance evaluation and analysis for the proposed access driveway with S 320th Street is required if a new driveway is permitted or approved by King County. Street Frontage Improvements (FWRC 19.135) The applicant/owner would be expected to construct street improvements consistent with the planned roadway cross -sections as shown in Map III-4 in Chapter III of the Federal Way Comprehensive Plan (FWCP) and Capital Improvement Program (CIP) shown as Table III-10 (FWRC 19.135.040). Based on the materials submitted, staff conducted a limited analysis to determine the required street improvements. The applicant would be expected to construct improvements on the following streets to the City's planned roadway cross -sections: S 320th St is a Principal Arterial planned as a Type "A" street, consisting of an 86-foot street with curb and gutter, 6-foot planter strips with street trees and street lights, 8-foot sidewalks, and utility strips in a 120-foot right-of-way (ROW). Assuming a symmetrical cross section, 10-foot ROW dedication and half -street improvements are required as measured from the street centerline. Additional curbing or other improvements may be required in the ROW to limit access as determined by King County access approval. ■ King County is the approving agency for the frontage improvements on S 320th St within the existing ROW. The required frontage improvements must be coordinated with and approved by King County. ■ Military Rd S is a Minor Arterial planned as a Type "K" street, consisting of a 44-foot street with curb and gutter, 6-foot planter strips with street trees and street lights, 8-foot sidewalks, and utility strips in a 78-foot right-of-way (ROW). Assuming a symmetrical cross section, half -street improvements are required although no ROW dedication would be required as measured from the street centerline. • 39th Ave S is a Local Street planned as a Type "W" street, consisting of a 28-foot street with curb and gutter, 4-foot planter strips with street trees, 5-foot sidewalks, and street lights in utility strips in a 52-foot right-of-way (ROW). Assuming a symmetrical cross section, half -street improvements are required although no ROW dedication would be required as measured from the street centerline. 2. The applicant may be required to dedicate additional right-of-way (ROW) to accommodate a revised property corner radius at the corner of Military Rd S / S 320th St. 18-101975-00-PC Doc ID:77712 Mr. Han June 11, 2018 Page 12 3. The applicant may make a written request to the Public Works Director to modify, defer, or waive the required street improvements (FWRC 19.135.070). Information about right-of-way modification requests is available through the Public Works Development Services Division. These modification requests currently have a nominal review fee of $278.00. 4. Tapers and transitions beyond the project frontage may be required as deemed necessary for safety purposes. The taper rate shall be WS2160 or as directed by the Public Works Director. Access Management (TWRC 19.135) Access management standards are based on roadway safety and capacity requirements. FWRC 19.135.280 provides access standards for streets based on planned roadway cross -sections. Please note that access classifications are per Drawing 3-IA in the Public Works Development Standards. 2. Please show all neighboring driveways within 150 feet of the proposed driveway(s). Per FWRC 19.135.280, driveways must be located no closer than 150 feet to any street intersection or to any other driveway, whether on or off the subject property. The city may further limit or prohibit access to or from driveway onto arterial streets as deemed appropriate for safety. 4. Military Rd S is Access Class "4", which permits full access as close as 150 feet to any other street intersection or driveway, whether on or off the subject property. Separation distances shall be measured from centerline to centerline of roadways and driveways. 5. S 320th St is Access Class "1", which permits full access only at signalized intersections, left -turn access as close as 330 feet, and right -in -right -out as close as 150 feet to any other street intersection or driveway, whether on or off the subject property. Separation distances shall be measured from centerline to centerline of roadways and driveways. Access may be further restricted on Military Rd S (and possibly S 320th St by King County) if such access would interfere with the 9501 percentile queue lengths from any existing traffic control device. 7. For driveways that serve uses other than single-family residential uses and zero lot line townhouse developments, the maximum driveway width is 30 feet for a two-lane two-way driveway and 40 feet for a three -lane two-way driveway (FWRC 19.135.270). Driveway widths may be increased in order to provide adequate width for vehicles that may be reasonably expected to use the driveway, as determined by the Public Works Director. 8. King County is the approving agency for the proposed access on S 320th St, so the applicant must make a request for access, ROW use permit, or similar request to the County and coordinate with the County for approval. As such, the following requirements may or may not be required by King County. Submit an intersection sight distance analysis for the design vehicle used at the proposed access driveway with S 320 Street. The analysis shall be conducted in accordance to the latest AASHTO guidelines (3.5 ft object height, 3.5 ft driver's eye height, 14.5 ft back from the edge of the traveled way for passenger vehicles). The analysis must bear the seal of a licensed 18-101975-00-PC Doc ID:77712 Mr. Han June 11, 2018 Page 13 engineer in the state of Washington. The sight distance triangle shall be depicted on the plan set. The right -turn out is of particular concern. Please provide photo documentation of the sight distance analysis. A minimum of one photo looking to the left and one looking to the right will show the location of the viewer in accordance to AASHTO guidelines. The Site Plan with plan and profile sheets should also be incorporated into the report to provide the site distance documentation. Indicate if there are any street trees, landscaping requirements, or any other objects existing or proposed to be within the sight distance triangle. State if the sight distance requirements are met or not and provide any traffic safety mitigation measures. King County may also require traffic analysis of the signalized intersection of Military Rd S & S 320th St with mitigation possible. Design Criteria (FWRC 18.55) Block perimeters shall be no longer than 1,320 feet for non -motorized trips, and 2,640 feet for streets (FWRC 18.55.010 and FWCP Policy TP4.2). Therefore, a pedestrian connection between 39th Ave S and either S 320 St or Military Rd S would be required through the property. The pedestrian connection should be a Type "AA" Non -Motorized Path, consisting of a 12-foot sidewalk with 4- foot planter strips in a 20-foot right-of-way (ROW). This requirement may be modified by the Public Works Director if connections cannot be made for reasons outlined in the FWRC. 2. Staff may be supportive of a ROW modification request to reduce this cross-section or a proposal to connect 39th Ave S to S 320th St and Military Rd S using on -site pedestrian connections. 3. A minimum driveway throat length of 40 feet is required as measured from the face of curb to the first conflicting drive or parking aisle. Driveways accessing roadways with a speed limit greater than 35 mph, or commercial driveways with higher percentages of trucks or large vehicles may be required to provide a 50-foot throat length. Misc. Safety Related Comments The City will monitor traffic conditions (queuing, collisions, etc.) on Military Rd S and shall reserve the right to limit access to right -in and right -out or other access configuration at such time deemed necessary by the Public Works Director. PUBLIC WORKS — SOLID WASTE AND RECYCLING DIVISION (Rob Van Orsow, 253-835-2770, probyfr wkyoffederalway.com) Solid Waste & Recycling Design Considerations Solid waste and recycling design considerations for commercial or multi -unit residential housing include: Space Required and Enclosure Basics • Adequate space allocation for interior and exterior garbage, recycling, food waste, waste oil, yard debris, hazardous waste, or biohazard collection containers. Minimum recycling space allocation 18-101975-00-PC Doc ID:77712 Mr. Han June 11, 2018 Page 14 is established by FWRC 19.125.150 (attached). Note that this typically makes up only about 1/3 of the combined space needed for solid waste and recycling containers combined. • In general, per unit services costs are lower for larger containers emptied less frequently. Sites that do not allow ample space for containers will tend to have higher service costs over the long tern. • Basic solid waste and recycling services can be accommodated within a single enclosure with clear interior dimensions measuring 10' deep by 20' across. A two -door swing -open or roll -open gate should span the front of the enclosure. When gate doors are opened, no structure or hardware should remain above grade across the enclosure opening. Gate pins/holes are preferred for holding gates in both closed and open positions to ease service access and maximize the life of gate hardware. • Sites may require a larger enclosure, or multiple enclosures, to accommodate on -site user access and/or additional waste types and containers. • Plan for user access to interior waste and recycling storage areas/containers, and convenient access to exterior containers screened by enclosure(s). Vehicle and Service Access Plan for unobstructed enclosure ingress and egress for service vehicles, preferably in -line with enclosure openings. Allow appropriate turning radii for service vehicles, and minimize potential `blind spots' during entry and while backing. Screening Specification for Enclosures • Consider landscaping, setbacks and screening requirements, based on FWRC 19.125.040 (4) & (5). Large Scale Projects and On -Site Waste Compaction ■ Note that larger -scale commercial or multi -unit housing developments may see long-term savings from the use of on -site waste compaction equipment. Planning elements for this equipment includes larger enclosure dimensions, defined overhead clearances, power utility access, and drainage management. o For grocery stores, restaurants, or multi -family facilities, "Self -Contained" waste compactors are preferred over "Stationary" or "Break Away" compactors. Compactors may need to be covered and connected to the sanitary sewer, since compacted wet wastes can cause leakage and surface water nuisances. • Mixed -use developments may also benefit from on -site waste compaction equipment. Additional mixed -use development considerations include: o Designated chutes and/or internal facility maintenance areas or services for tenant use, o Movement of wastes and recycling items from interior units to collection areas, and o Enabling access by business tenants and/or residents to exterior waste and recycling enclosure(s). Help with many design parameters related to service access is available via the City's contracted solid waste services provider, Waste Management. Contact: Dian Young, Route Manager, at 253-804-6815 (office) or 253-455-0355 (cell). 19-101975-00-PC Doc ID:77712 Mr. Han June 11, 2018 Page 15 COMMUNITY DEVELOPMENT — BUILDING DIVISION (Peter Lawrence, 253-835-2621, Peter.Lawrence(a,,citvoffederalway.com + Building Codes. The structure will be treated as a new building permit application and must meet all current codes including: • International Building Code (IBC), 2015 Washington State Amendments WAC 51-50 • International Mechanical Code (IMC), 2015 Washington State Amendments WAC 51-52 • Uniform Plumbing Code (UPC), 2015 Washington State Amendments WAC 51-56 & WAC 51-57 ■ International Fire Code (IFC), 2015 Washington State Amendments WAC 51 -54 • National Electric Code (NEC), 2017 + Accessibility Code (ICC/ANSI A117.1), 2009 + Washington State Energy Code, 2015 WAC 5 1 -11 + Building Criteria. The following applies to the proposed structure: ■ Occupancy Classification: A-2 , B UNK Type of Construction: V-B + Floor Area: 3,770/ 2135 • Number of Stories: one + Fire Protection: UNK + Wind/Seismic: Basic wind speed 85 Mph, Exposure, 25# Snow load, Seismic Zone D-1 • Building Permit Application Process. A completed building permit application and commercial checklist are required. The commercial checklist will be filled out by staff and provided at the time of Land Use Approval. Copies of application and checklist may be obtained on our web site at www. cityoffedera lway.com . Appointments are required for intake of new commercial building permit submittals. Please call or email to schedule an intake appointment with the Permit Center staff at (253)835-2607 or pennitcenter@cityoffederalw@;X.com. 18-101975-00-PC DocID:77712 Mr. Han Tune 11, 2018 Page 16 Some projects may require a third party review or inspection. The cost to cover these fees is the responsibility of the applicant. Any third party fee is in addition to regular permit fees and costs. Please note, Land Use Approval is recommended prior to submitting the building permit application to avoid delay in project review. If the project has not received Land Use Approval, it may be placed on hold until Land Use review is completed. Review Timing. Federal Way reviews plans on a first in, first out basis; however, there are some small projects with inconsequential review requirements that may be reviewed out of order. The first comment letter can be expected within 5-7 weeks of submittal date. Re -check of plans will occur in one to three weeks after re -submittal. Revised or resubmitted plans shall be provided in the same format, size, and amount as the originally submitted plans. Revised/resubmitted drawings shall indicate by means of clouding or written response, what changes have been made from the original drawings. Plans for all involved departments will be forwarded from the Community Development Department. • Other Permits & Inspections. Separate permits may be required -for electrical, mechanical, plumbing, fire suppression systems, and signs. Applicants may apply for separate permits at any time prior to commencement of construction. When required, special inspections shall be performed by WABO approved agencies or by agencies approved by the building official prior to permit issuance. Construction must be approved by all reviewing departments prior to final building division inspection. All concerned departments (Planning, Public Works, Electrical, & Fire) must sign off before the Building Department can final the structure for occupancy. Building final must be approved prior to the issuance of a Certificate of Occupancy. Construction projects may be required to have a pre -construction conference. If a pre -con meeting is required, the general or representative, all subs, the architect or representative, the engineer or representative, electrical contractor, and any other interested parry, should attend this meeting. Meetings will occur at the Building Department and will be scheduled by the inspector of record for the project. Site -Specific Requirements. ■ Fire separation distance. • Accessibility. • Dedicated outdoor air system required. • Electrical vehicle charging stations infrastructure. • Demo permit required. ■ Roof top mechanical screening requires structural engineer's evaluation and design. The information provided is based on limited plans and information. The comments provided are not intended to be a complete plan review and further comments are possible at time of building permit plan review. 18-101975-00-PC Doc ID:77712 Mr. Han June 11, 2018 Page 17 LAKEHAVEN WATER AND SEWER DISTRICT (Brian Asbury, 253-946-5407, BAsbury@lakehaven.org) Water ■ A Water Certificate of Availability issued separately by Lakehaven may be required to be submitted with any land use and/or building permit applications (check with land use agency for requirement). Certificate is valid for one (1) year from date of issuance. If Certificate is needed, allow 1-2 work days to issue for typical processing. 2018 cost for a Water Certificate of Availability is $60.00. • Other nearby hydraulic model results indicate that Lakehaven's standard maximum allowable system liquid velocity of 10 ft/s, at no less than 20 psi, is exceeded at a fire flow rate above a minimum of 2,500 GPM. If more precise available fire flow figures are required or desired, Applicant can request Lakehaven perform a system hydraulic model analysis (separate from, or concurrent with, an application for Availability). 2018 cost for a system hydraulic model analysis is $220.00. • If additional hydrant(s) required or indicated, a Lakehaven Developer Extension (DE) Agreement will be required to construct new water distribution facilities necessary for the proposed development. Additional detail and/or design requirements can be obtained from Lakehaven by completing & completing & submitting a separate application to Lakehaven for either a Developer Pre -Design Meeting or a Developer Extension Agreement. Lakehaven encourages owners/developers/applicants to apply for Lakehaven processes separately to Lakehaven, and sufficiently early in the pre- design/planning phase to avoid delays in overall project development. • The site has one (1) existing water service connection (SN 25607, 1" meter). • A water service connection application submitted separately to Lakehaven is required for each new service connection to the water distribution system, or any modification to an existing water service connection (e.g., larger meter/service, irrigation, abandonment of existing service(s), re -activation, etc.), in accordance with standards defined in Lakehaven's current `Fees and Charges Resolution'. Each non - single -family property requires separate domestic (per building, typically, some exceptions allowed), irrigation (if irrigated landscaped areas are incorporated into the site development), and fire protection (if required or installed) water service connections & meters. • To satisfy premise isolation requirements, the installation & satisfactory testing of an approved backflow prevention assembly (BPA) adjacent to each domestic, irrigation & fire -protection (if applicable) service meter is required pursuant to WAC 246-290-490 & Lakehaven standards regarding premise isolation. For domestic & irrigation, as low health cross -connection hazards, either a double check valve assembly (DCVA) or a reduced pressure backflow assembly (RPBA) is required. For fire - protection, a double check detector assembly (DCDA) or a reduced pressure detector assembly (RPDA) is required for 3" & larger fire protection service connections; for 2" & smaller fire protection service connections a separate full -flow meter with a DCVA or RPBA is typical. Contact Lakehaven's Cross - Connection Control Program Manager (Chris Zoepfl, CZoepfle"kehaven.om, 253-946-5427) for additional information on premise isolation/BPA installation & testing coordination. • The associated DE Agreement must achieve a point of either Substantial Completion or Acceptance, as determined by Lakehaven, prior to activating any new domestic or irrigation water service connection(s). ■ Based on the proposal submitted, preliminary estimated Lakehaven water service connection fees/charges/deposits (2018 schedule) will be as follows. Actual connection charges will be determined upon submittal of service connection application(s) to Lakehaven. Connection charges are separate from any DE fees/charges/deposits & are due at the time of application for service. All Lakehaven fees, charges and deposits are typically reviewed & adjusted (if necessary) annually, and are subject to change without notice. 18-101975-00-PC Doc ID:77712 Mr. Han June 11, 2018 Page 18 o Water Service/Meter Installation, new Domestic, 11/2" preliminary size (x2): $778.07 meter drop -in charge (each). Actual size TBD by Lakehaven based on applicant's estimated maximum domestic GPM usage rates. o Water Service/Meter Installation, new Irrigation, 1" preliminary size: $531.85 meter drop -in charge. Actual size TBD by Lakehaven based on applicant's estimated maxi num irrigation GPM usage rates. o Water Service/Meter Installation, Irrigation, convert existing 1" domestic meter to irrigation: $0.00. Actual size TBD by Lakehaven based on applicant's estimated maximum irrigation GPM usage rates. o Capital Facilities Charge(s)-Water: $4,023.57 per Equivalent Residential Unit (ERU). Actual amount due TBD by Lakehaven based on applicant's estimated annual total water usage rate. Water system capacity credits are available for this property from system capacity charges previously assessed, paid directly to Lakehaven, and/or credited to the property for 3.34 ERU. Please contact Lakehaven for further detail. Sewer ■ A Sewer Certificate of Availability issued separately by Lakehaven may be required to be submitted with any land use and/or building permit applications (check with land use agency for requirement). Certificate is valid for one (1) year from date of issuance. If Certificate is needed, allow 1-2 work days to issue for typical processing. 2018 cost for a Sewer Certificate of Availability is $60.00. • A Lakehaven Developer Extension (DE) Agreement will be required to construct new sanitary sewer system facilities in Military Rd S necessary for the proposed development, including extend -to -far -edge (SE) in accordance with long-standing Lakehaven policy. Additional detail and/or design requirements can be obtained from Lakehaven by completing & submitting a separate application to Lakehaven for either a Developer Pre -Design Meeting or a Developer Extension Agreement. Lakehaven encourages owners/developers/applicants to apply for Lakehaven processes separately to Lakehaven, and sufficiently early in the pre-design/planning phase to avoid delays in overall project development. • The associated DE Agreement must achieve a point of either Substantial Completion or Acceptance, as determined by Lakehaven prior to activating any new sewer service connection(s). • Based on the proposal submitted, preliminary estimated Lakehaven sewer service connection fees/charges/deposits (2018 schedule) will be as follows. Actual connection charges will be determined upon submittal of service connection application(s) to Lakehaven. Connection charges are separate from any DE fees/charges/deposits & are due at the time of application for service. All Lakehaven fees, charges and deposits are typically reviewed & adjusted (if necessary) annually, and are subject to change without notice. o Sewer Service Connection Permit: $280.00 fee (per building). o Capital Facilities Charge(s)-Sewer: $3,808.67 per ERU. Actual amount due TBD by Lakehaven based on applicant's estimated annual domestic water usage rate. o Latecomer Charge: $17,975.96 (expires 2/10/2020). SOUTH KING FIRE AND RESCUE (Chris Cahan, 253-946-7243, chris.cahan@southkingfire.org) Water Supply Fire Flow The required fire flow for this project is 1750 gallons per minute. A Certificate of Water Availability shall be requested from the water district and provided at the time of building permit application. 18-101975-00-PC Doe M:77712 Mr. Han June H, 2018 Page 19 Fire Hydrants: This project will require the installation of 1 new fire hydrant in an approved* location. *Hydrant(s) spacing along access roads and location in relationship to buildings and sprinkler FDC shall be approved by Fire Marshal's Office Fire hydrants shall be in service prior to and during the time of construction. Emergency Access Fire apparatus access roads shall comply with all requirements of Fire Access Policy 10.006 http:Hsoutlikin fg ire.or DocumentCenter/Home/View/24 Designated and marked fire lanes may be required for emergency access. This may be done during the plans check or prior to building final. Requirements and marking options can be found in title 8 of the Federal Way Revised Code:litip://www.codgpublishing.com/WA/FederaIWa� Fire apparatus access roads shall be installed and made serviceable prior to and during the time of construction. Fire Department Lock Box A recessed fire department "Knox" brand key box shall be installed on the Fast Food Restaurant near the front entrance. Location will be approved by the plan reviewer or Deputy Fire Marshal onsite. Fire Sprinkler System An NFPA 13 fire sprinkler system will be required in the Fast Food Restaurant if the occupant load exceeds 100. Fire Alarm A Fire Alarm System will be required in the Fast Food Restaurant. City Code requires an automatic fire detection system in all buildings exceeding 3,000 square feet gross floor area. If equipped, the fire alarm system is required to monitor the sprinkler system including water flow. Provide full notification as required by NFPA 72. This fire detection system shall be monitored by an approved central and/or remote station. Fire Suppression System An approved fire suppression system is required for all type 1 kitchen hoods. CLOSING This letter reflects the information provided at the preapplication meeting and is intended to assist you in preparing plans and materials for formal application. We hope you found the comments useful to your project. We have made every effort to identify major issues to eliminate surprises during the City's review of the formal application. The completion of the preapplication process in the content of this letter does not vest any future project application. Comments in this letter are only valid for one year as per FWRC 19.40.070 (4). 18-101975-00-PC Doc ID:77712 Mr. Han June 11, 2018 Page 20 As you know, this is a preliminary review only and does not take the place of the full review that will follow submission of a formal application. Comments provided in this letter are based on preapplication materials submitted. Modifications and revisions to the project as presented for this preapplication may influence and modify information regarding development requirements outlined above. In addition to this preapplication letter, please examine the complete FWRC and other relevant codes carefully. Requirements that are found in the codes that are not addressed in this letter are still required for your project. If you have questions about an individual comment, please contact the appropriate department representative noted above. Any general questions can be directed towards the key project contact, Jim Harris, 253-835-2652. We look forward to working with you. Sincerely, m Harris Planner enc: Master Land Use Application Process III Submittal Requirements Binding Site Plan Handout Mailing Label Handout FWRC Chart 19.215.020 Tree Unit Worksheet & Recommended Tree List Lakehaven Map c: Cole Elliott, Public Works Development Services Manager Erik Preston, Senior Traffic Engineer Chris Cahan, SKFR, via email Brian Asbury, Lakehaven Water and Sewer, via email 18-101975-00-PC Doc ID:77712 Lkeen WATER. & SEWER DISTRICT S A� -24 " °1 �4 ONR Y � A ®.DI Ex. 6" Sewer Svc Stub 9+/- ft deep 2368000051 3828 Ex. WtrSvc 25607 1" Meter 2368000040 32108 7 v s32r`SrS •�� Future 12" T C` Sewer Trunk 2368000105 32105 . • • •' .r cs � U Q 2 ov A m 2368000100 32111 2368000035 32116 r_ NJ rvv 1 C: LaKenaven vvater ana Sewer District neither warrants nor guarantees the accuracy of any facility information provided. Facility locations and conditions are subject to field verification. Han Retail 18-101975-00-PC 0 50 100 Feet 6/1/2018 BIA CITY OF FEDERAL WAY , )EVELOPMENT REVIEW COMMITTEE RC) Preapplication Conference Sign -In Sheet 18-101975 -PC, Han Retail - Fast Food Preapplication Conference May 17 , 2018 NAME WITH PHONE & EMAIL Jim [-Tanis FW Planning 253 835-2652 Jim.harrls@cityoffederalway.com di e- Eti « It L_) o :-vs Dw, „W, � � r Zs - ` 3 s- z -F 3 4 Vtw.,, . et e,.ga�c_,t o 4e kt,,.: C ZSa --E 3S- a7 5y y eiev 6H!'-W�m aa c,.0 if 'L 3 q4(a • 77W' , 'C;"L,Cs1' ), tRKLjfAv194 WATee 253 a—s-V0r7 (L C GDIPIPPl EXMN• 2SS 8' �_2(e07 C��O �El�v2/1�J /� -.qe a_/*. -va ✓vl A i r � �/L�rvf'JSQ./fi�lG 2a - 4-�3 59-0 Gf r0 �'�I� %G�ir✓Y� L1 �Crji /1 lid �L _ 1G� Aj � • �e d 6 3 z/ 7y'71 (LJ Ay, C00'%- lway- cUK C C ;A-L Eugene Han 2102176" Ave W #6 Edmonds, WA 98026 Jim Harris City of Federal Way 33325 8th Ave S Federal Way WA 98003 May 14, 2018 Dear Mr Harris: RESUBMITTED MAY 14 2018 CITY OF FEDERAL wAY COMMUNITY DEVELCOMEN7 Enclosed is a third version of our proposed site plan. We would like to make this our primary site plan and the other two site plans that we've previously submitted as alternates. Please let us know if you have any questions or would like to discuss any of these items. We look forward to meeting with you and the committee on May 24th. Regards, Lit'-C- 4- Eugene Han RECEIVED MAY 0 8 2018 CITY STATEMENT OF EXISTING AND PROPOSED USE COMMUNITY DEVELOPMENT The existing nursery and single family residence will be demolished. A new 2135 sf coffee shop with drive-thru and new 3770 sf fast food restaurant are proposed. Project will require a Short Plat to subdivide into two (2) lots. See attached Site Plan - Scheme 5 for PreApp Conference discussion. We have a�so included Scheme 4B as an alternate for discussion. DEVELOPER QUESTIONS FOR THE CITY OF FEDERAL WAY Are proposed uses allowed by code? v� ® What is the Land Use Process for this development? " S • What studies/documents are required with formal application? • How long should the land use process take? How long do the land use permits last? / Are the proposed drive-thru layouts allowed? Any restrictions? .-T ® Are the proposed new access allowed? Full access on Military Road? • How can we confirm the access point on S. 320th Street? • Are there any property dedications required? • Are any roadway improvements required? j C -3 ZU 1 R.O.W. E 15.5' ZONED RS9.6 320th St NEW DRWY. 24.0. I 1 _ cli o 77 _ \ — 24.0' COFFEE 2135 SF I Read Pktr 2135�80^ 26.7 stalls Prvd Pk = 2135 80= 27 stalls^'I ao 6 REMOVE EX. NURSERY BLD� fLOT 1 Q Or -LOT-LINE -_ 20,626 SF I 11 C6 Ft 1 i_ ------ 1 _ t NEW LOT LINE UNDERGROUN fI I I 1 OMTM VAULT 1 r* ZONED BN t a S3. 'I 10 � t -- 1 y/Cfll r L H/C O U') 11.7' FAST FOOD $ f� �L \ 3770 SF LOT 2 ` 12 Regd Pktq 3t s77%111 tall �35,460 SF }� N = 47. Pryd PkV 40 stalls 7 16.0' 30.O, <' y 12.1Y 40 10 L6 170' t REMOVE EX. ZONED RS9.6 HOME PROJECT DATA PARCEL#: 2368000040 LOT SIZE:1.32 AC OCCUPANCY USE: A-2 CONSTRUCTION: V-B IV I 0 40 1 inch = 40 ft. HAN 32108 I . ,., .Inn & Suites ederal Way S 3201h St S 320th st �32106 39th Avenue South 3 sairsisr s � The Lodge at V Peas[ y Canyon N 33"- da S P SSG Q N sr. s Horlrr - iws Frsnlna � s a:em sr VICINITY MAP RECEIVED MAY 0 8 2018 COMM Nf Y DEV OPMENT 0 +; i I f III im Military R°ad S. _ V co NEW DRWY• 6 M IREM r EX. oDRWY. (d .9 w o z w J Z 0 W z I 70 00 = m L w U) u :2 w w V J Q U C 0 L c cn cn a� v E Q L o J y � J w 0 u 7 � L w c L otf 1 Vj N J =3 �o 0 _N m t� o5� RECEIVED MAY 0 8 1018 CITY OF FEDERAL WAY COMMUNITYDEVELOPMENT f--A N Q CAM m 0 d- MitiitaY7l Road S R.O.►�I�O�� - r REMOVE f EX. DRWYJ- O 301' — 1 1 1 I f o N co O�M 1 CC•Jj _ _ J N N f a'i co � 0Zl w 1. .. 0 0 a; a O0 v N M fA OD Z LO CO cN ,o•e� —.o L � I �^ . H/C � M L _, 0 U- O �. r7 z rn Q II II m U- d Y W a o N rn ��p77 X m iL 11 / W o cLLI n WCO f ' - V c.+ i , P,•� ui ,tis l o NEW DRWY- M 30.0' o I h co of co o W Z N O LLI on ul CC W LO m W U C Q O c� c C" 0 0 a E J D Jw Sin J L` Lu J W 0 1 � N J � o 0 N ro O i C) S, CITY OF Federal Way Centered on Opportunity May 10, 2018 F I E CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com Jim Ferrell, Mayor Pedro Deguzman pedro@terraformadesigngroup.com Terraforma Design Group Inc. 5027 51" Ave SW Seattle, WA 98136 RE: File #18-101975-00-PC; PREAPPLICATION CONFERENCE MEETING Han Retail, 32108 391h Ave S , Federal Way Dear Mr. Deguzman: The above -referenced proposal has been assigned to me as project planner. At this time, the application and preliminary site plan have been routed to the members of the Development Review Committee. A meeting with the project applicant and Development Review Committee has been scheduled as follows: Thursday, May 24, 2018 — 9:00 AM Hylebos Conference Room City Hall, Second Floor 33325 8 h Avenue South Federal Way, WA 98003 We look forward to meeting with you to discuss your proposal. Contact me at jim.harris@cityoffederalway.com or 253 835-2652 if you have any questions. Sincerely, aJ'Harris Senior Planner c: Eugene Han, hansremanagement@gmail.com 18-101975-00-PC Doe. LD. 77713 CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT DEPARTMENT DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: May 10, 2018 TO: Cole Elliott, Development Services Manager Peter Lawrence, Plans Examiner Rick Perez, City Traffic Engineer Brian Asbury, Lakehaven Water & Sewer District Chris Cahan, South King Fire & Rescue FROM: Jim Harris FOR DRC MTG. ON: May 17, 2018 May 24, 2018, 9:00 AM - with applicant ............................ ...... --- ......... FILE NUMBER(s): 18-101975-00-PC RELATED FILE NOS.: None PROJECT NAME: HAN RETAIL PROJECT ADDRESS: 32108 39TH AVE S ZONING DISTRICT: BN PROJECT DESCRIPTION: Proposal to demolish existing single family residence and nursery and construct 3,770 sf fast food restaurant and 2,135 sf coffee shop drive-thru. Divide property into 2 lots. LAND USE PERMITS: TBD PROJECT CONTACT: PEDRO DEGUZMAN MATERIALS SUBMITTED: Preliminary Site Plan Applicant questions sheet 4k 0TY Federalof Way RECEIVED MAY 082018 CfTY OF FEDERAL WAY MASTER LAND USE APPLICATION COMMUNfrY DEVELOPMENT DEPARTA'lENT OF CommuNiTV DEVELOPMENT 33325 8`h Avenue South Federal Way, WA 98003-6325 253-835-2607-Fax 253-835-2609 ►V %ylY.cltyo_ffc dCraIwU.coi31 APPLICATION NO(s) I v C/ 7_5 Date Project Name Han Retail Property Address/Location 32108 39th Avenue South, Federal Way, 98001 Parcel Number(s) 2368000040 Project Description Proposed 3770 sf Fast Food Restaurant and 2135 sf Coffee Shop with drive-thru on the existing 1.32 acre property. The existing nursery and single family home will be removed. The property will be divided into two (2) lots. The existing Military Road driveway will be moved. A new 320th St. driveway proposed. Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference Process I (Director's Approval) Process II (Site Plan Review) V Process III (Project Approval) Process IV (Hearing Examiner's Decision) _ Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only _ Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial/Residential Required Information BN - Neighborhood Business Zoning Designation Commercial Comprehensive Plan Designation $89,00 Value of Existing Improvements $2,500,000 Value of Proposed Improvements International Building Code (IBC): A-2 Occupancy Type VB Construction Type Bulletin #003 — January 1, 2011 Applicant Name: Eugene Han Address: 21021 76th Avenue West #6 City/State: Edmonds, WA Zip: 98026 Phone: (206) 271-2562 Fax: Email: hanSTemanagement@ 11.com Signature: Agent (if different than Applicant) Name: Pedro DeGuzman, PE - Terraforma Design Group, Inc. Address: 5027 51st Avenue SW City/State: Seattle, WA Zip: 98136 Phone: (206) 923-0590 Fax: Email: pedro@terraformadesigngroup.com Signature: Owner Name: Song Young Address:C- C.i Ly/51ate: ALt%3 Phone:n�— Fax: —�—� Email: ��Snv� ✓._��`` %���'��. C�� Signature: Page IofI k:Wandouts\Master Land Use Application A�kCITY OF Federal Mr. George Cook, P.E. Assistant Vice President Quadrant Homes PO Box 130 Bellevue, WA 98009 CITY HALL Way 33325 8th Avenue South Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com December 17, 2007 Re: Federal Way File #07-106465-00-AD; NOTICE OF COMPLETE APPLICATION Small Lot Detached Demonstration Project Selection -- South 320`b Street Small Lot Subdivision 31800 32°" Place SW, Federal Way Dear Mr. Cook: The Department of Community Development Services is in the process of reviewing information you submitted on November 30, 2007, and December 5, 2007, for your proposal to be selected as a Small Lot Single Family Demonstration Project. The specific proposal is to develop 117 single family lots on a 19.12 acre site zoned RM 2400. Pursuant to the requirements of the Federal Way City Code (FWCC), the City has 28 days to determine whether an application is complete. COMPLETE APPLICATION Please consider this letter as a Letter of Completeness. Pursuant to the FWCC, the application is deemed complete as of December 13, 2007, based on the submittal requirements for Small Lot Detached Single Family Demonstration Project Selection (FW Bulletin #064). Per the procedures specified in FW Bulletin #064, the Director of Community Development Services shall issue a written decision regarding whether or not your proposal has been selected as a Small Lot Single Family Demonstration project no later than 60 days following this notice. Please note, this notice of complete application only applies to the requirements associated with selection criteria for a small lot single family demonstration project. If your project is selected to proceed with a formal application, said application shall be reviewed for completeness per the applicable requirements and separate notice provided. If you have any questions on the project selection process, please contact me at 253-835-2644, or janet.shull@cityoffederalway.com. Sincerely, I Janet Shull, AICP Senior Planner c: William Appleton, Development Services Manager Scott Sproul, Assistant Building Official Kevin Peterson, Engineering Plans Reviewer Brian Asbury, Lakehaven Utility District Rick Perez, Traffic Engineer Chris Ingham, South King Fire & Rescue Doc I D. 43417 A�kCITY OF Federal January 22, 2008 Mr. George Cook Quadrant Homes PO Box 130 Bellevue, WA 98009 CITY HALL W33325� 8th Avenue South a Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com Re: Permit #07-106465-00-AD; CONDITIONAL APPROVAL South 320'h Place Small Lot Development; 31800 32"d Place SW, Federal Way Dear Mr. Cook: The City of Federal Way is pleased to inform you that your proposed small -lot demonstration project on South 320`h Street was conditionally selected to advance to the formal submittal phase for development as a Small Lot Single Family demonstration project. The proposed South 3201 Place small lot subdivision has been found to be generally consistent with the small lot demonstration project selection criteria pursuant to Federal Way City Code (FWCC) 20-155. The proposal is designed to provide a variety of housing design choices; provide attention to architectural design and building.material selection; and provide for a pleasant streetscape design with incorporation of alley -loaded garages and incorporation of front porches along the public street. We believe that with a . few modifications to the submitted proposal, the South 320th Street Small Lot Demonstration Project will be a welcome addition to the City's housing stock and serve as a good model for small lot subdivisions. As you are aware, the purpose of the City's Small Lot Single Family Demonstration Project program is to provide additional opportunities for homeownership and a greater variety of housing types in Federal Way. In implementing this demonstration program, the City is looking for innovation in site design as well as a high quality housing product. With these program goals in mind, the South 320`h Place small lot single family housing proposal is hereby conditionally approved as a Small Lot Single Family Demonstration Project, subject to the following conditions: 1) Minimum requirements for usable on -site open space pursuant to FWCC 20-156(c) must be achieved and the formal application shall provide verification of open space quantity. 2) Pursuant to FWCC 20-156(b), the site plan shall be modified to re -locate the active open space area PT-2 (tot lot) to a more centralized and easily accessible location (for example a location in the vicinity of lots 31-35) which is more accessible and visible to the overall community. 3) Pursuant to FWCC 20-179(c), the site plan shall be modified to either eliminate the need for, or minimize the aesthetic impact of, retaining walls terracing lots 12 through 28.Options to be Permit #07-106465-00-AD Doc.1.D. 43565 Mr. George Cook Page 2 January 22, 2008 considered may include, but not be limited to, incorporating house designs that relate to sloped lots and/or increasing lot size in areas with steeper grade. 4) In order to achieve a sense of community throughout the project (small lot demonstration selection criteria FWCC 20-155[c][3]), the house designs utilized for the project shall: a) Incorporate front porches on all homes (e.g. series 1570 elevation A shows a stoop not a porch). b) Limit double garages to alley access locations only. c) Incorporate a minimum level of trim detail including window trim, window grids, and planter boxes (e.g. series 1470 elevation A is not acceptable for the demonstration project). 5) Pursuant to FWCC 20457, "Pedestrian and Bicycle Access," the following pedestrian connections shall be established: • The pedestrian connection shown within the Olympic Pipeline easement shall be connected to South 3206' Street for access to transit. ■ Provide for an additional pedestrian connection to the BPA easement (future trail) in the vicinity of Lot 48. In addition to the conditions above, staff is recommending that the following additional plat modifications be considered in order to improve the overall site aesthetics and sense of community for the demonstration project. 6) Modify the site plan to provide open space in the location of Lots 1 and 2 to contribute to sense of community, provide a distinct entry treatment, and provide a pedestrian connection to open space at east end of property. 7) Align the two alleys in vicinity of lots 64-67, 72, and 103-105 to provide direct pedestrian connectivity. 8) Limit the paving width within the alley in the rear of lots 1-11 to the 16-foot minimum and plant the remaining four feet with shrubs and groundcover to soften the edge transitioning to the storm drainage and wetland area tracts. 9) In addition to item 8 above, consider additional site design elements to better incorporate the storm drainage/wetland facility/buffer area portion of the site as an open space amenity accessible to the residents. For example, incorporate some limited trail access within the buffer/open space area and look to innovative design solutions to the design of the drainage facility to lessen the aesthetic impact of pond walls and associated retaining walls. With this approval, you may submit formal applications for subdivision and environmental review. Please contact Senior Planner Janet Shull, AICP, at 253-835-2644 to discuss submittal requirements. Permit #07-106465-00-AD Doc I.D. 43565 Mr. George Cook Page 3 January 22, 2008 Please also find enclosed with this letter a copy of a table staff prepared in response to your request that we evaluate and respond to your proposed project timeline. Please note that even under ideal conditions (faster -than -typical staff review time and few if any resubmittal requirements, for example), Quadrant's desired construction start date of May 12, 2008, can not be achieved. Again, contact Senior Planner Janet Shull, AICP, with any questions with regard to the project review procedures and scheduling. Thank you for your interest in small lot single family housing. If you have any questions, please contact Senior Planner Janet Shull, AICP, at 253-835-2644, or 'anet.shull ci offederalwa .corn. We look forward to working with you. Sincerely, Greg Fewins, Interim Director Community Development Services Department Eric: Review Process Timeline Comparison Table c: Cary Roe, Public Works Director/Assistant City Manager Ken Miller, Deputy Public Work Director Janet Shull, Senior Planner Margaret Clark, Senior Planner Deb Barker, Senior Planner Isaac Conlen, Senior Planner William Appleton, Development Services Manager Kevin Peterson, Engineering Plans Reviewer Rick Perez, Traffic Engineer Sarady Long, Traffic Analyst Chris Ingham, South King Fire and Rescue Brian Asbury, Lakehaven Utility District Permit 407-106465-00-AD Doc 1.D 43565 Task Quadrant Target Date Best Case Scenario Target Date Standard Target Date Notice of complete small lot application issued (Application submitted November 30, 2007) 12/17/07 (actual issuance date at 17 days) 12/28/07 (28 -day decision) Derision by City on Slit -III Lot 1)elnonmratiott Project 1116?2008 111.C120.08 ii] 2I26120{]$ ' (60-day decision) Submit Preliminary Plat 1/23/2008 1/23/2008 2/29/2008 DRC 2/7/2008 3/13/2008 Lettcr of ['oluplctcr]ess at1 I'relitriP of `� 6 (16-day decision) (25-clay rlecisw:l) Issue NOA/Post Site 2/13/2008 4/2/2008 Submit E N Plans 2/15/2008 2/15/2008 2/15/2008 Issue SEPA 3/1/2008 4/19/2008 SEPA comment/Appeal period ends 3/31/2007 5/19/2008 Issue Public Notice for H.E. Hearing 4/2/2008 5/21/2008 H.E. Report due to H.E. H. E. Decision Due 4/8/2008 4/30/2008 5/29/2008 6/19/2008 City Council L.U.T.C. 5/19/2008 7/7/2008 City Council 1e6sion 5. :.0- .... &312008 — if1512608' E.N. Approval 5/8/2008 6/4/2008 7/16/2008 Start Construction 5/12/2008 6/9/2008 7/21/2008 Notes: 1: "Standard" Target Dates scenario should also be considered a "best case" scenario since it assumes that at each milestone, the project is ready to move forward, not waiting for resubmittals or additional information at any critical point in the review process. 2. Applicant did not provide target dates for SEPA decision, so may not have factored that process into their timeline. 3. Both city target date scenarios would necessitate issuing SEPA decision on the heels of the NOA. This may not allow adequate time for staff review and document preparation. 4. Applicant is proposing concurrent E.N. review and Preliminary Plat review. 5. Application for right-of-way vacation is not addressed in any of these timelines but if pursued will affect the overall project timeline. Permit #07-106465-00-AD Doc I D 43564 School Access Analysis New development creates a need for analysis of student pedestrian safety. The Federal Way School District would prefer an analysis of walking paths to schools and bus stops from new subdivisions be prepared by the developer prior to final comments on impacts. Generally a walking route should be planned to assure that school -age pedestrians from a neighborhood: ■ Cross the fewest number of streets to reduce vehicle -pedestrian exposures. ■ Walk on sidewalks or paths where available. ■ Walk the shortest possible distance on streets without sidewalks or wide shoulders. ■ Walk on the left side of the road facing traffic on streets where practicable. ■ Avoid high speed, high volume roads and roads with high truck volume. ■ Make maximum use of protective techniques (traffic control devices, existing crossing guards, and school patrols). • Use easements with walkways through parks or other available areas where student safety is maximized. Walkways and paths must be cleared of vegetation for maximum visibility. The analysis of walking paths to schools and school bus stop locations from a new subdivision should include the following information: ■ School location ■ Description of sidewalks, pedestrian paths and shoulders including: ➢ Condition and width of shoulder and sidewalks; ➢ Whether shoulders are paved, gravel or grass, or non-existent; ➢ Whether sidewalks and pathways are immediately adjacent to the traffic lanes or are separated by a planting strip or other means from moving traffic; and ➢ The location of drainage or irrigation ditches. ■ Location of all crosswalks, including type of crossing protection offered. ■ Medians, pedestrian refuge islands and other pedestrian safety features. ■ Posted speed limits and warning signs, especially all 20 mph school speed limit zones. ■ All stop and yield signs. ■ Traffic signals, including presence of marked crosswalks and pedestrian signal indication. Traffic signal timing and phasing for pedestrian crossing. ■ Major sight line obstructions as measured from the height of children. ■ Bicycle lanes or paths. 0 Other relevant pedestrian safety factors observed. Page 1 of 2 Janet Shull - Re: South 320th Place From: Kevin Peterson To: Joey Bullock Date: 1 /4/2008 9:37 AM Subject: Re: South 320th Place CC: Janet Shull Joey, Strictly speaking, the City does not have a clearing and grading permit. Not only that, the City restricts mass clearing/grading on subdivisions. We only allow clearing and grading in those areas necessary to construct the plat infrastructure. Bottom line, we do not permit clearing/grading without some associated, approved permit (commercial, residential, multi- family building permit and/or engineering approval, which is how we review/approve plats). I'm not the expert on this. Janet Shull would probably be better prepared to outline the procedure, but she's out today and I'm out Monday, and I wanted to get you a response, so you may just want to verify this with her: The only way we allow for mass clearing and grading of a plat is the applicant must request it at the Hearing Examiner meeting (a written request to the City should be submitted at the time of preliminary plat application, that way we are prepared ro address the issue at the Hearing). Specific reasons should be included to support the request (i.e. amounts of cut and fill and areas needed to be cleared and graded to construct just the plat infrastructure, etc.) that show little or no benefit in not being allowed to mass clear and grade the site. Typically, the Examiner will take it under advisement and City staff will either support or oppose the request. However, the ultimate decision lies with the City council, so the applicant should be prepared to address the issue at both the Land Use/Transportation Committee meeting and the City council meeting. You should also be prepared to address the amount of significant trees (FWCC Section 22- 1568) that will be removed, retained, and/or replaced, as a result of the mass clearing and grading of the site. Hope this helps answer your question. Let me know if you need anything else, and please contact Janet to verify the procedure I laid out. Kevin Peterson City of Federal Way Engineering Plans Reviewer 33325 8th Ave S P.O. Box 9718 Federal Way, WA 98063-9718 Ph. (253) 835-2734 Fax (253) 835-2709 kevin.peterson@cityoffederalway.com file://C:\Documents and Settings\default\Local Settings\Temp\XPgrpwise\477DFE59CHPO... 1/7/2008 Page 2 of 2 >>> Joey Bullock <joeyb@paceengrs.com> 1/3/2008 9:42 AM >>> Kevin - I was looking for information on obtaining a Clearing and Grading permit online but not having much luck. Do you know where I can find the city requirements and/or checklist for Clear and Grade? thanks Joey Bullock, Project Designer II PACE Engineers, Inc. 1601 2nd Avenue, Suite 1000 Seattle, WA 98101.3511 p. 206.441.1855 1 f. 206-448-7167 paceengrs.com Civil I Structural I Planning I Survey file://C:\Documents and Settings\default\Local Settings\Temp\XPgrpwise\477DFE59CHPO... 1/7/2008 QUADRANT HOMES, MORE HOUSE. LESS MONEY. RECEIVED 6--) COMMUNITY ®EVELOPMENT DEPA URT 14725 SE 36th Street, Suite #200 P.O. Box 130 Bellevue, WA 98009 December 28, 2007 Ms Margaret Clark, AICP City of Federal Way P.O. Box 9718 Federal Way, WA 98063-9718 Re: South 320"' Place Dear Margaret: .JAI 0 3 2000 Tel. 425.455.2900 Fax 425.646.8377 OuadrantHomes.com Here is a copy of the BPA easement that traverses the South 320t' project site. The easement contains right to BPA for removing "danger" trees outside of the easement corridor. Please let me know if you have any questions. SincerelJy- George E. Cook, P.E. adrant Homes Q I r /;ITS Trsct No_ TRANSMISSION LINE EASEMENT sew T( The GRANTOR, herein so styled whether one or more, WAT,"HR J. Ax=S and uA LYS E. `A husband and wife, � t n for and in coaridera:ion of the sum of - 1W RIIN>R C - - - - - - - - - - - - - - - - - - - - - --------------------------- - - - - -- -Dollars (f200.00 ). in hand paid by the UNITED STATES OF AMEB1CA,reeeipt of which is hereby acltnowledged, hetety arpara, bargains, sells and conveys to the UNITED STATES OF AMERICA and its assigns, a perpetual easement and right to enter and erect, maintain, repair, rebuild, operate and patrol one or moreline(s) of electric power transmission struc- tunes and appurtenant signal lines, including the right to erect such poles, transmission structures, wires, cables and appurtenances as are necessary thereto, in, over, upon and across the following -described parcel of land in the _ \ County of King in the State of Washington , to -wit: That portion of Tract 18 of Midway Suburban Tracts in the SitfJ,SWj of Section 10, Tova&ip 21 North, Rmice 4 &st, Willalaatta Meridian, King County, Washington, which lies within a strip of land 62.5 feet in width, Bring on the southerly side of, running parallel with, and adjoining the Bonneville Porter Administration's existing 200-foot right of way for the Covington -Tacoma transmission lines Nos. 1 and 2, the location of said 200-foot right of way being shown in an instrument recorded in Volume 2178 of Deeds, page 26, Records of King County. t FILED f� for Record at Request of IIaIISeJLi.��' Y87-0268 F1LED F R EC D T THE ll tt Sv REOUES ❑ : 1 WEYE 0. SE PANY rederal LN7-t _��;�_9e, BOX TAC M . W 9 77 87i05 01 000696 D RECD F 6.00 EAJGI eff CRSHSL ****6. 00 THE GRANTOR, WEYERHAEUSER COMPANY, a Washington corporation, for and In consideration of TEN AND NO/100 DOLLARS (s10.00) and other good and valuable consideration In hand paid, grants to ICING COUNTY FIRE DISTRICT #39, GRANTEE, the right to use, as a septic tank dralnfield, the following described real property, situate In the County of King, State of Washington: See EXHIBIT A attached, Incorporated by reference herein. IN WITNESS WHEREOF, said corporation has caused this Instrument to be executed by Its proper officers and Its corporate seal to be hereunto affixed this 27t11 day of ._�P1 1987. WJGY'ERHAZUSER COMPANY By: Vice President mz— ilff mz Attest: 313tant ecra y STATE OF WASHINGTON, ss. i COUNTY OF KING �o On this 27th day of AP>cil 1987. before me personally appeared Rnbcxt C. lane and Robert N. Mo ensen . to me known to be the Vice President and Assistant Secretary respectively, of WEYERHAEUSER COMPANY, the corporation that executed the within and foregoing Instrument, and acknowledged said Instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned. and on' oath stated that they were authorized to execute said Instrument and that the seal affixed Is the corporate seal of said corporation. _ N WITNESS WHEREOF, I have hereunto set my hand and affixed my offlcal seal ay and year fir above 1 en. NOTARY PUBLIC • My appointment e I res: ri1 1 1989 VOLtir�r.q• SPA an R_ ,o-3-CT 34 l sac: Xo- W /DTS 3•—a-36 TRANSMISSION LINE EASEME`:-1 The GRANTOR, herein so-.tylcd abctl:cr one or more, IRIS MV-' KA-�, s ridor " ber Aeparate estate, for and in consideration of the sum of — 1rM "11-7 iUR=) 71l!'4TiY-Irm fbllars ( S 525.00 ), in hand paid by the UNITED STATES OF AMF:RICA,receipt of which is hereby acknowledged, hereby grants, bargains, sells and conveys to the UNITED STATES OF. AMERICA and its assigns, a perpetual easement and right to enter and erect, maintain, repair, rebuild, operate and patrol 1 Or MkOrE line(s) of electric power transmission.struc- cures and appurtenant signal lines, including the right to erect such poles, transmission structures, wires, cables and appurtenances as are necessary thereto, in, over, upon and across the following -described parcel of land in the County of Ling in the State of ift3bJM9t= , to -wit: ?hat n of Tr%CtQ 1, 2 and 3 of Iiidwap Suburb*n Tracts in the SfF f SDetion 10, Tamahip 21 Borth, iiLrLp 4 Xast, willanette meridian, Xing Cotmtyr lissbicgton, WUch lie■ v4+1"ss A strip of land 62.5 feat in width lying on the soutbsrll side Of, nonina parallel vi.Ch, and adjoining the uB*1—n Till* pam'v Adadmi.straati.eu's existing Wo foot right of WK-Y for the Coritl;toa— Taz trr�s�dasica 13ues MOB- and 2, tha location of said. 200 foot right of v&Y is sham in 3nstrtaants rmcorded in volume 2178 of Deeda, Page 20; Volume 2165 of Deeds, page 6n ; Volume 2178 of Deeds, Page 29 and Volume 2178 of Doeds, Patio 32s records of KIag C,oDmty, Washinstoo. Preliminary Site Plan _' .SOU- M 3201h STREET QUADRANT HOMES MINA% South _ 0TH T., Fede'-al Nay, 6VA Ocmbc 2, zone Ak m :.,: Conceptual Landscape PlanWasarg. 1+0404- 4 bill r ' 6 �t LOT NUMBER LOT AREA (sf) MIN FRONT SETBACK (it) WN REAR 5ET9ACK (ft) MN SIDE SETBACK (fl) 1 2988 1 10 20 2-3 3315 1 10 20 5 4 1 2975 1 10 20 5 5-6 3145 10 20 $ 7 3060 10 20 5 a 3145 10 1 20 5 9-10 _Nm 10 26 5 1t 3889 1D 20 5 12-17 2713 20 T5 5 18 2901 20 15 5 19 2972 20 15 5 20 2907 20 15 5 21 3456 20 15 5 22 2749 20 15 5 23 274s 20 15 5 24 2742 20 15 5 25 2739 10 15 5 26 2735 10 15 5 27 2732 20 15 5 25 2729 20 15 5 29 2729 20 s3 5 30 2722 20 15 5 31 2719 20 15 5 32 2715 20 15 5 33 2712 1 20 1 15 5 34 3695 20 15 5 35 7380 30L 15 5 36 3731 20 15 5 37 4392 20 15 5 38 2970 20 15 5 39 2972 20 15 5 40 um 20 f s 5 41 3057 20 15 5 42-46 2970 i 20 15 5 47 3032 20 15 5 46 5477' 2D 15 5 49 3459 YO 15 5 50 2894 20 75 5 52 2687 20 15 5 5J 2709 20 15 5 54 4029 20 15 5 55-59 2952 20 15 5 60 5030 2O 15 5 61 4882 20 15 5 62 3092 20 15 5 53 3102 20 15 5 84 3522 20 SS 5 tis S197 20 15 5 66 3146 20 15 5 67 3087 20 15 5 58 W57 20 15 5 69 3192 26 15 5 70 3243 20 15 5 71 3295 1 20 15 5 72 3722 20 15 5 73 3948 10 20 5 74--77 2890 10 1 20 5 78 4177 fo 20 5 79 410s TO 20 5 80 3332 10 28 5 82-85 2890 10 20 5 as a055 10 20 5 67 4024 10 20 5 58 21590 10 20 5 89 2824 10 20 5 90 2956 10 20 5 91-93 2890 10 20 5 94 43T8 10 20 5 95 1 4296 10 20 5 96 2890 10 20 5 97 2844 10 20 5 98-101 2890 10 20 5 102 4070 10 20 5 103 3279 1 20 1 10 5 104-11E 2718 20 1 10 5 117 30t9 20 70 S 52' RIGHT OF WAY 1d R�r �. �_ 5- �-- I(— 10' 8'--y 5' S 4.5" 'PARALLEL[4-S'- �S I I PARKING I 52' RIGHT-OF-WAY SECTION PROPOSED FEDERAL WAY STANDARDS !ROW 52' 52' !PAVEMENT 28' 28' WIDTH :SIDEWALK 5' 5' 'MOTH !_ANDSCAPE 4 5' 4' TRIP IJT LITY STRIP 2.5' 3' r PT-1 ACTIVE OPEN SPACE (36,746 SF) I - 52' - 61 ' I: 62 U Q �� ---__-- f 34 ' -- 63 Ld 25' Fr m 11NG R/W 65 if 66 167 T= .'o - .I 34' PRIVATE STREET --I 0000 ■ l -zo' pRrvrTe AU Er 5' !�— —"r — 5' LANDSCAPE 00 \\\ 37 ��, 38 \, r 0\ - . I ♦ ALLEY SECTION 34' PRIVATE STREET SECTION s41 \\ \\ \\ ,\ 1 0 25 50 100 42 ,\\, \� 1 V Q� 1 HORIZ. Scale PROPOSED FEDERAL WAY STANDARDS PROPOSED FEDERAL WAY STANDARDS ♦\ \ \ \ \ 43 `\ --_� .36 ■ ,/ In Feet zo' za' Row 34' 34' \ \ \ \ \ \ ti LEGEND NT 16' 16' PAVEMENT WIDTH24' 24' `, \\ 45 \\ \ \. ASPHALT PAVEMENT X 0 q SIDEWALK ,WDTH 5, 5' � \, ■ \ \, 46 \\ 1 t1 1 �•• r SIDEWALKS �� / DRIVEWAYS ER 2' 2' (LANDSCAPE :STRIP (ONE SIDE) 5' (BOTH SIDES) I 47 \ 1� \ \� ,� \ - .�� LANDSCAPE STRIP 48 Ery- �r- � \,, � � r T— 2 ■ r- f 35 ACTIVE OPEN �� a a PROPERTY LINE (OUTSIDE CITY LIMITS) - .r l� 1 SPACE (10,431 SF) — — RIGHT OF WAY LINE —77 3 i 5 ' 57 50 ' 49 54 ' 4 i ' i 3I I I I I I I 1 I 1 I { � I �33 32 ; 31 i 30 + 29 28 27 iI 26 25 ` 24 23 i 22 I 55 56 7. 57 Do . 7 59 60 \ i , ry } �, i 1 . I 94 _ I� 95 } I 11 �11 i - *19 1 L 1 \ 80 ; I ; 93 1 E------- - �I +L--------- �- 78 l { 81 92 - ' 68 \ i 77 82 ! 91 �. F---------a F-- ----8--3 ---- -g--6 -��.- ------- i I 176 .. 69 1! r-- - -- --- - - - - - -s 745 2a I $4 S9 70 ------ 1 I---- --- _- -- --� � li 74 r 1I I— $5 i I [ 88 71 fh--------i -----------1 I F--_----- I r.JE 73 _1 86 i� 87 72 -z I I _ 25' I 4. 103 1 104 i 165 i 1a6 i 11 I I I I R/W I - ! —f AMLY) 96 97 98 _ - __ I 7 9-- 9 100- 101 -1102_-�� I [ I j I I`I I �I I I I I 1 I I 1 1 I If i I I 1 l I 1= E I .JI 3 1 I- I_ i ;108 i109 1 110 : 111 1 112 : 113 : 114 ; 115 : 1161 117 � I I I I I I 1 I I I TY OF FEDERAL WAY R/W j SOUTH 320th STREET R/W I�-- ---_ — �J — � — R/W — � � � 60 I 1601 211 AV,,,, Suite 1000 DESIGNED Seatlle, WA 98101 DRAWN p. 206 441 185511. 20&44&7167 D CHECKECNi! I Slruclum.I I Planning I Survey 51V REVISION DATE BY PD An E,4needK SendGD Vwy Daceenars-cam — — — — — — — — — — — Z — \1 QUADRANT HOMES 14725 SE 36TH STREET BELLEVUE, WA 98009 I 10 i r---------- 'i 9 8 I s�' I 6 I� 5 {1 $ 4 I I I I I I 151, 17 i 1 i j9 I r I I 1 I I ! I I [ I I DETENTION POND ST-1 (c1y,44F3 9f) r Y if a a w 4 0 t r \ 1'21 20 \\ T- 3 OPEN SPACE (112,630 SF) CITY OF FEDERAL WAY FIRE DEPT, I 2 � — L oC LU w—. R/W - wir a� } wQ }� W — — — R/W 95 DATE SOUTH 320TH PLACE JOB NUMBER NOVEMBER 2007 05809 SCALE SITE PLAN SHEET NME P058DRSP 1 "=50' SHEET 1 OF` !11■A■1:0± FU 1 UKt ROAD FXTFNSTC LOT NUMBER LOT AREA (s r) MIN FRONT SETBACK (H) MIN REAR SETBACX 00 MIN SIDE $ETBACK (ft) 0 5 2-3 3315 10 20 5 4 2975 10 20 5 5-•6 3145 Ili 5 7 3060 10 20 5 8 3145 10 20 5 9-10 3060 10 20 5 11 3689 10 20 5 12-17 2713 20 15 5 ,8 2901 20 15 5 19 2972 20 15 5 20 2907 20 15 5 21 3455 20 15 5 22 7749 20 15 5 23 20 15 5 24 20 15 5 2s 10 15 5 26 10 ,5 5 27 q271920 20 15 5 28 20 15 5 29 20 15 5 39 20 15 5 31 15 5 32 2715 20 15 5 33 2712 20 15 5 34 3695 20 15 5 35 7360 30 15 5 36 3731 2D 15 5 37 4392 20 15 5 38 2970 20 15 5 39 2972 20 15 5 40 3358 20 15 5 41 21057 1 20 15 5 42•-46 2970 20 15 5 47 3032 2.0 15 5 48 5477 20 15 5 49 3489 20 15 5 50 2694 20 15 5 52 2687 20 15 5 53 2709 20 15 5 54 4028 20 15 5 55-59 2952 20 15 5 60 5059 20 15 5 61 4882 20 15 5 62 3092 20 15 5 63 3102 20 15 3 64 3522 20 15 5 65 3197 20 15 5 66 3146 20 15 5 67 3047 2D 15 5 68 3357 20 1s 5 69 3192 2D 15 5 70 3243 20 15 5 71 3295 20 15 5 72 3722 20 15 5 73 394o ,0 20 5 74-77 2890 10 20 5 78 4177 10 20 5 79 41D5 10 20 5 80 3332 10 20 5 62-85 26" 10 20 5 86 4055 10 20 5 87 4024 10 20 5 B8 2890 10 20 5 89 2824 10 20 5 90 2956 10 20 5 41-93 2890 10 20 5 94 4318 10 20 5 95 4296 10 20 5 96 2890 10 20 5 97 2844 10 20 5 99-101 2890 10 20 5 102 4070 10 20 5 103 5279 20 ,0 5 104-116 2718 20 10 1 5 117 3019 1 20 1 ,0 I 5 - — —— Raw—�-- DESIGNED DRAWN CHECKED I- 52' RIGHT OF WAY ROr Q 5 s q�5 10 r 6J s PARALLEL 4.5' 2.5 PARKING j I II 52' RIGHT-OF-WAY SECTION PROPOSED FEDERAL WAY STANDARDS ROW 52' 52' 6 PAVEMENT 28' 25' F WIDTH V WIDTHALK 5' S• (LANDSCAPE 4.5' 4' STRIP [UTILITY 2 5' 3' STRIP I W Q C N M 52' f _61A. I 62 I L.LI U - 34• +� Q � N LL' O X= 1 I I - + ISRNG R/W 1 6 i 7 r 20' PMVa4TE ALLEY--y I ~g�4.�e� I ALLEY SECTION PROPOSED FEDERAL STANDAF 20' 20' 16" 16' 34' PRIVATE STREET --� y ll ��♦• I 5• LANDSCAPE �" I I 37 12' 12' I 10 \ 38 �\ �- \ \ 39C' ^ \ . 34' PRIVATE STREET SECTION fv ♦ • \ 41 \ \ FEDERAL WAY �\ 711 42 \, ♦N \ �'\\ �\ \\ . \ HORIZ. 0 25 50 100 Scale In Feet PROPOSED STANDARDS • 48 36 ow 34' 34' ',`p \ \\\.� , s. LEGEND \\ \ 4�i ^\\�'� 1 • � .. D AVEMENT 24' /�24' �® \\ 45 \\ .'•�\jj, • \ ASPHALT PAVEMENT ♦ \ 46 \ m� r H^"• 0 0 1 pDTHALK SIDEWALKS / DRIVEWAYS •-{CPiE SIDE) (BOTHSIDES)IF \I 47 \\ �I�\ J \ 5� JLDER 2' 2• IjANDSC-E 5' \ \ _ , . ��� T f,� r -^ J LANDSCAPE STRIP TRIG \ T-2 PROPERTY LINE \ ACTI E OPEN 35 • 1• (a1 uVIT S A C E RIGHT OF WAY LINE I (10. 1 SF) i17� ___-r--.- rq a �s a T �T is r a f5PGA f �`j 1 3 50 1 9 33 1 3 13i 30 29 28 27 26 25 24 23 22 sFl �\ \ `�J► + I I I I � I I j` f I I I I I I r 1 1 I I _s 56 \ Ll _ t_ \ \ \ + -�- �- u-II_a_ \ 57 58 59 21 20 -`6�0 94 --9-5 --- 7r I I II II II II II II I ! 11 LLLr--------- 12 13 14 15 16 1.7 18 19 .---______y1I -------- 1 ,9380 + I 96 i I !i 10 [ I ! I I I I I \-------- �� ----- --� r--------� r----------� 78 - I 81 I �i 92 97 9 [ L_Bssf_(rm�-- L------- I ------ 1 I --� r-----_- \ I 77 [; I L� 82 �j 91 ! 98 i 3 8 I T-3 ` 68 I I I !I- - I I = 28 OPEN SPLrOFG F-----___4 r-------- 1 a I -_----__I r----_--_ 76 I I 83 i li 90 I - 2f99 II �II I IL769 - ------ - ------ -y-------- s 50._-- - _ 89 6 I !; �7)0 r----_----------- --------;i74 8_ }+ c„as .f 5 88 101 it LJ I I I 73 !. 86 ��.1 I ��� 87 I I 102_-_----- + + , I •� I I � i l. 4 L— -~)—_--- -- �j ---3_ C 25 - ! 1 nn I:, -F. f t7111,il,' 1 :JIr.. 103 1104 1105 1 D6 1107 1108 1109 1 110 1 111 I 1112 1113 1 114 1 11~51 1161 117 I I ! I I I I I I I ! I � I I ! ! I I I I I I I I I R/W: Irl I + I I I I I I f I Y) Y .OF FEDERAL WAY R/W r_ R/W I — _ — — — — —- SOUTH 320th STREET r \ I 1601 2nd Avenue Suite 1 Seattle, WA90,0, QUADR µ 206.441,18551 f. 2062a8.71 4725 S ISTH 5 EE1 Civil I Structural I Planning 1 Survey STMME, WA 98009 1 P,�� L L___ I � I 95 ./ NOVEMBER 2007 1ck.E Y LLL%%%' / �v � n w RAL WAY V � FIRE DEPT. 0 A R/W SOUTH 320TH PLACE JOB NUMBER 05809 SITE PLAN SHEET NAME PO58095P SHEET 1 OF a� o(D o I- o' r 0 0 LO 0 Ln N 0 m 0 O N U ca N L U r z-A( O Q CO 0 U c L ca ^ LL �� AOOmft IM I- 'Fj,�� _ - .li.���._ ,r�� �i'a�:..,� a. H` �„S[j� • � ` •�!� � w1 I ` � ►�, _ ' - �- - � ._ - - ��� �� �`� ' r ram! . IA ti FF LU * io V, j ol- el ~'r ' ,. • � � .�. ; • , L � f � �-: �; ` t a � ' � � _ [[�i Tit it � y � e ar- 1 � �' ,�•�c,.. / � ��. �*r � �' � � ' , l - I r S 320TH S -.— LU - W - - -41.m co LLJ I0191■IDI:&A JTu RE IOAD OFNC%TC 27' FUTURE RIGHT-OF-WAY DEDICATION 8' SIDEWALK PRIVATE PROPERTY NOT IN QUADRANT OWNERSHIP 6' PLANTER 68' FUTURE RIGHT-OF-WAY 41' PROPOSED RIGHT-OF-WAY 30' EXIST. RIGHT OF WAY f 10' FOR FUTURE BIKE LANES �� 12' DRIVE LANE 12' DRIVE LANE (5' EACH SIDE) 1 l TYPICAL 32ND AVE. SOUTH SECTION SCALE: 1 "= 5' R FEDERAL WAY TACOMA PIPELINE EASEMENI 1 1 ' 1 PLANTER~ SIDEWALK ~� 3 rNi�a LOT NUMBER LOT AREA (ef) MIN FRONT SETBACK (it) MIN REAR SETBACK (it) MIN SIDE 'SETBACK (ft) 2m to 20 2-3 3315 10 20 5 4 Z975 10 20 5 5-6 3145 10 5 7 3060 11] 20 5 a 310 In 20 5 9-10 3050 10 20 5 11 3689 to 0 5 12-17 2713 20 -16'-- 5 18 2901 20 15 5 19 2972 20 15 5 20 2907 20 15 5 2) 345a 20 15 5 22 2749 20 15 5 23 2745 20 15 5 24 2742 20 15 5 25 2739 10 15 s 26 2735 10 15 5 27 27SZ 20 15 5 28 2729 2D 15 5 29 2725 20 15 5 30 2722 20 15 5 31 2719 20 15 5 32 2715 20 1s 5 33 2712 20 15 5 34 3695 20 15 5 35 7360 30 15 5 36 3731 20 15 5 37 4392 20 15 5 36 2270 20 15 5 39 2972 1 10 15 5 40 3358 20 15 S 41 3057 20 15 5 42-46 2970 20 15 5 47 3032 20 15 5 48 5477 2D 15 5 49 3489 20 15 5 50 2694 20 M 5 52 2687 20 15 5 53 2709 20 15 5 54 4028 20 1 15 5 55-59 2952 20 15 5 60 ISM 20 15 5 61 4882 20 15 5 62 3092 20 15 5 63 3102 20 15 5 84 3522 20 15 5 55 3137 20 15 5 58 3146 20 15 5 67 3057 20 15 5 68 3357 20 15 5 69 3192 20 15 5 70 3243 20 1s 5 71 3295 20 15 5 72 3722 20 15 5 73 3948 10 20 5 74-77 2890 10 20 5 78 4177 10 20 5 79 4105 10 20 5 80 3332 10 20 5 82-85 2890 10 zo 5 86 4055 10 20 5 87 4024 10 20 5 8B 2890 10 20 5 89 2824 10 20 5 90 2956 10 20 5 91-93 289D 10 20 5 94 4318 10 20 5 95 4296 10 20 5 96 2890 10 20 5 97 284► 10 20 5 98-105 2890 10 20 s 102 4070 10 20 5 103 3279 20 10 5 104-116 2718 1 20 10 5 117 13019 1 20 t 10 1 5 52' RIGHT OF WAY II-� II-- F Q 91 1 I I PARKING 15 52' RIGHT-OF-WAY SECTION PROPOSED FEDERAL WAY STANDARDS ROW 52' 52' R WIDE PAVEMENT 28' 28' N SIDEWALK 5' 5'� WIDTH N 'LANDSCAPE q 5' 4' STRIP 'unuTY 2.5' 3' STRIP `W TQ V 1.: N (M - --" — — RN_ — — 60 PT-1 ACTIVE OPEN SPACE (35,745 SF) F_ L �20' MVVEAL I�8+11.411 ALLEY SECTION PROPOSED FEDERAL WAY STANDARDS 20' 20' 16, 16, 0 0 2' 2' (OUTSIDE CITY LIMITS) � 34' PRIVATE STREET •■ 5' I I`5' LANDSCAPES\ 11 37 I� 12' I 12' I j I I 1 ■■ 38 \, , wr \\ 1■ 39 \ \ 40 , 1� 34' PRIVATE STREET SECTION r \ �� 41 -■ / \ ■ �� tl 25 50 100 1■ 4HORIZ. PROPOSED FEDERAL WAY r\ ■ \ \ `• \ r� , Scale In Feet STANDARDS • " ■ . 43 36 !ROW 34' 3■ . `" ■ -� I \ \ \ LEGEND 4' ■ � ■ � � '� \ ,\ !PAVEMENT 24' 24' I ` •;\ \ L-A ,WIDTH ■ \ . 45 \ ■ n �. ASPHALT PAVEMENT S IDDEWALK 5' 5' MI- _ ■ \ 46 � y SIDEWALKS / DRIVEWAYS (ONE SIDE) (BOTH SIDES) -- ■, 47 1■ 1 5 ISTTRNP CAPE 5' �- \ ,, LANDSCAPE STRIP PT-2 ■ 't PROPERTY LINE I�a 35 ACTIVE OPEN SPACE - — — — RIGHT OF WAY LINE _-+I 110,431 SF) for ! [ i / 1--r-- �---^r �1R1_5Sp I . I I I t I. . I 23 22 0 49! 34 I . I I i I Q. �lyg ■ .■ 55 \. ..I I - I -- rlF-',• - ! - 1 fI ■ -:_ � I �T _i• - I -_ l; -- - I -• 56 57. 58 • ■ �- _ 59 ��• ■ ■ I I . 60nY 9 SOUTH 320th STREET 16012M AveiIIw &ft IW Sea18e, WA98101 g 206.441.18551 f. 206.448.7167 CNII I Structural I Planning I Survey QUADRANT HOMES 14725 SE 36TH STREET BELLEVUE, WA 98009 T _ _ _ 5Q 21 95I. I I I 20 \. r----_-- - 12 13 i 14 15 77 96 `; I I 10 1 T---3 OPEN SPACE (112,530 SF) rc a CITY OF FEDERAL WAY FIRE DEPT. 0 R/W SOUTH 320TH PLACE JOB NUMBER N Iv!31ER 2007 05809 SCALE SITE PLAN SHEET NAME PD560 1 "=50' SHEET 1l OF 30' MEMtNr +I t 1 I = � So TH 34 7-14 I f — IIIIIIIIIIIII�II �-� N l� ;- 63 f � y 25' TRACT 1- f-- T__--rL-- �1 1 I t5 1 6f 67 SIDEwALIC f 1 i 1 1 I 1 L 1 L� 1 w ui N IP, (PAACM7E) An Engineering Services Company CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: December 13, 2007 TO: Will Appleton, Development Services Manager Scott Sproul, Assistant Building Official Brian Asbury, Lakehaven Utility District Chris Ingham, South King Fire and Rescue FROM: Janet Shul9,K' Senior Planner FOR DRC MTG. ON: December 13 - internal, Completeness NOZ"E: This application is for Selection as a Demonstration Project - this is not the formal development application which will follow IF this project is selected to proceed as a demonstration project. ............................................ FILE NUMBER(s): 07-106465-00-AD RELATED FILE NOS.: 07-105379-00-PC PROJECT NAME: SOUTH 320TH PLACE SMALL LOT DEVELOPMENT PROJECT ADDRESS: 31800 32ND PL SW ZONING DISTRICT: RM 2400 PROJECT DESCRIPTION: Selection submittal for proposed subdivision of 19.2 acres into 104 small lot detached housing sites. LAND USE PERMITS: Preliminary Plat, SEPA PROJECT CONTACT: QUADRANT HOMES GEORGE COOK PO BOX 130 4254526553 (Work) MATERIALS SUBMITTED: MLU application, list of parcel numbers, project description, site plan, landscape plan, colored renderings, proposed schedule, code compliance tables. CITY OF Federal Way 41k RECEIVED NOV s 0 2007 CITY OF FEDERAL AY BUILDING DEPT, MASTER La1ND USE APPLICATION DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES 33325 8`h Avenue South PO Box 9718 Federal Way WA 98063-9718 253-835-2607;Fax 253-835-2609 www.citvoffederalway.com APPLICATIONNO(S) ^'O q6 5 ! Date���� 7 Project Name Property Address/Location ;a a_R)0n 21,130 IPMCES �� r% 0 02fie-, V Parcel Number(s) �fl Z Project Description PLh ASE PRINT Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference (� Process 1 (Director=s Approval) Process II (Site Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial/Residential Required Information I9 9 Zoning Designation Comprehensive Plan Designation _$ n Value of Existing Improvements e of Proposed Improvements International Building Code (IBC): Occupancy Type Construction Type Applicant Name:p Address: City/State: Zip: Phone:�S Email: Name: Address: City/State: Zip: Phone: Fax: Email: Signature: Owner Name: Address: City/State: Zip: Phone: Fax: Email: Signature: than r_ i 7_17mpw . Bulletin #003 — August 18, 2004 Page 1 of 1 k:\Handouts\Master Land Use Application QUADRANT . HOMES 14725 SE 36th Street, Suite #200 P.O. Box 130 MORE HOUSE. LESS MONEY. Bellevue, WA 98009 December 5, 2007 Ms Janet Shull Senior Planner City of Federal Way 33325 Bch Ave South Federal Way, WA 98063 Re: South 320"' Place o-7-- to(O4 &5 -Ab Janet Tel. 425.455.2900 Fax 425.646.8377 OuadrantHomes.com Here are the house plan front elevation color renderings and front, side and rear elevations from the set of Architectural plans for the homes that we are currently proposing to offer for sale at our South 320th Place project. These are the elevations that I indicated that we would add to our December 3`d Application for selection as the Small Lot Demonstration Project on Friday of last week. COs There are seven sets of the colored elevation renderings and one set of architectural elevations for each house plan offering. The colored rendering brochures also contain the different floor plan offerings for each house plan. If you have any questions about the different house plan offerings or associated elevations please give me a call. Sincerely, rill George . Cook, P.E. uadrant Homes 425-452-6553 RECEIVED DEC 0 5 2007 CITY OF FEDERAL WAY BUILDING DEPT. Q OUADRANT HOMES SMALL LOT DEMONSTRATION PROJECT FEDERAL WAY 4 T� ` F R00 will -- --• f =emu, •.;� _ e '� NOV 3 j0 2007 CITY OF FEDCRAL WAY BUILDING DEPT, DECEMBER 3, 2007 SOUTH 320TH PLACE SMALL LOT DEMONSTRATION PROJECT APPLICATION December 3, 2007 Quadrant Homes is applying herein for selection as the Small Lot Demonstration Project builder by the City of Federal Way. Our application for selection is contained in the attached South 320th Place land use plan and bound application packet. Quadrant Homes brings 38 years of homebuilding experience in the Puget Sound area, with 16 new communities currently selling. We are also completing the three award -winning master planned communities of Snoqualmie Ridge, Redmond Ridge and Northwest Landing. We are confident that our wealth of experience in creating new residential communities and depth of homebuilding experience will translate into a small lot residential community that the City can look to with pride and can be offered within the price range affordable to young families. Quadrant Homes' Small Lot Demonstration Project application was prepared in accordance with the City of Federal Way application submittal requirements for a "Small Lot Detached Development" as outlined in Bulletin #064-October 3, 2007, The South 320th Place land use plan was prepared in accordance with the 2007 adopted Comprehensive Plan and Zoning Code. The application has addressed most of the comments contained in the City's November 5`h Pre -application Comment letter. Some pre -application comment issues will be addressed in more detail in the South 3201h Place preliminary plat application. The South 320th Place site is located adjacent to and north of South 320th Street approximately 't/4 mile east of Interstate 5. The site is bounded on the west by 32°d Avenue South and on the east side by a Federal Way fire station. The fully signalized intersection of Weyerhaeuser Way South and South 3201h Street lies south and adjacent to the site and provides the main entrance to the site. South 320th Street is an arterial street and provides quick access to I-5 and west to shopping and restaurants along the north and south sides of South 320th Street west of I-5. The South 320th Place community will consist of approximately 117 homes on 19.2 acres containing a mix of homes with garages on the front side of the home (front -loaded homes) and homes where the garage is located on an alley in back of the house (alley - loaded homes). Lots sizes vary from 2,712 square feet to 7,360 square feet with an average lot size of approximately 3,000 square feet. The City of Federal Way Zoning Code, Chapter 22-667, allows a minimum lot size of 2,400 square feet. All lots in South 320th Place will exceed the minimum lot size allowed by the Federal Way Zoning Code and will average about 3,000 square feet. South 320`h Place is served by a combination of public roads meeting the requirements of the Federal Way Public Works Standards and private roads meeting the requirements of the Federal Way Small Lot Development Standards. The internal local access roads are - proposed as a Type W local access street with a modification to allow two 12-foot travel lanes plus an 8-foot parking bay. A second entrance into the community is provided from 32"a Avenue South which is proposed to be constructed to an Arterial Road Standard "O". The connection to 32" Avenue South will provide the second access required for emergency vehicles. A planter strip is located on both sides of all public roads that serve the site. Street trees located within the planter strip will create an attractive appearance to the neighborhood. In addition to the publicly owned local access roads, the site includes two private road tracts, three alley tracts and one private street that provide access to homes not accessed by public roads. These Small Lot Development access roads will be owned and maintained by the South 320th Place Homeowners Association. The main entrance to the site will feature alley load homes on both sides of the main entrance street. Garages will be located on the back side of these homes. The absence of driveways will provide an attractive entrance with a traditional streetscape. The streetscape for the main entrance is shown in the attached architectural rendering under the tab "Plans". The front elevations of the homes shown in the rendering display a number of architectural features such as window grids, shutters and window boxes. Some of these architectural features will be standard features on the South 320th Place homes, while other features (such as the window boxes) can be selected by the home buyer at the time of purchase and will be added to the cost of the home. South 320`h Place has three open space tracts, two active recreation tracts and one storm water detention pond tract. Open space Tract T-1 is located adjacent to and east of 32"d Avenue South and contains a City of Tacoma water transmission line. This tract will serve as a native growth and landscaped enhanced visual buffer and will be maintained by the HOA in accordance with the City of Tacoma easement restrictions. Open space Tract T-2, located along the north property line, is within the Bonneville Power Administration ("BPA") easement area and will be left in an undeveloped condition and will be maintained by the South 320th Place HOA in conformance with the terms and restrictions of the BPA easement. Open space Tract T-3 contains an open space area and two small wetlands and associated buffers. The wetland in this tract will be enhanced during development of the South 3201h Place site. Tract PT-1 will be cleared of brush and improved as shown on the attached landscaping park plans to create an open level play area for active recreation use. It is unlikely that any significant physical structures will be placed in this park tract in order to comply with the terms of the existing BPA easement. Active park Tract PT-2 will be developed to include an array of active children's play equipment. Tract ST-1 will contain a storm drainage detention facility required for the South 320th Place site. The exact size and location of the storm drainage facilities will be determined during the engineering phase of the project. Additional engineering analysis will be required during development of the preliminary plat application to determine the more precise details of the storm drainage system. Water and sewer service will be provided by Lakehaven Sewer District. Power and natural gas will be provided by PSE. The South 3201h Place neighborhood has been designed with sensitivity to adjacent properties A single wood PSE power pole will need to be relocated to enable the site entrance to align with Weyerhaeuser Way. The north margin of South 320th Street will be improved with the addition of an HOV lane, curb, gutter, sidewalk and planter area as part of the plat construction of South 320th Place. A 10-foot wide area of Type III landscaping comprising the north 10 feet of the South 320th Street Right of Way will be constructed during development of the site. The 100-foot wide BPA easement area along the north side of the site will provide a natural buffer to properties to the north. Tract T-3 will provide an approximately 130-foot wide buffer to the east. Tract T-3 will be landscaped with the exception of the ST-1 storm water pond. The attached landscaping plan shows the type of landscaping materials proposed for Tract T-3. Tract T-1 will provide a 60-foot wide landscaped enhanced native grown vegetated buffer to the west. Site construction is expected to be typical for a single family project.. The site slopes gently to the north from South 320th. A small wetland borders the easterly portion of the site and provides a buffer between the site and the adjoining fire station. The site is currently covered with a mix of second growth evergreen and alder. Soils are typical for a site in the Federal Way area. The South 320th Place land use plan was configured to conform to existing utility corridors. A Bonneville Power Administration power line corridor borders the site to the north. A single alignment of towers containing one circuit of 320 KV power lines is contained in the corridor. A 115 KV Puget Sound Energy line located on wood poles borders the site to the south and provides power to an existing power substation lying south of 320th Street and west of Weyerhaeuser Way. The PSE power poles also contain a 12.5 KV circuit of local distribution power lines as well as telephone and cable TV franchise utility lines. An Olympic Pipe Line Corporation main traverses the site from north to south. The City of Tacoma operates a water transmission line within an easement that parallels the south margin of the BPA easement including Tract T-1. Quadrant Homes seeks to build an attractive and diverse community with values similar to those of the City of Federal Way. It is our intent to build communities that are compatible with neighboring properties and homes that are in scale with the lots on which they are built. South 320th Place will have a mix of housing types that provides for flexibility of family sizes and market conditions. All homes will be single-family, two- story, detached dwellings. The demonstration project will highlight the Cottage Collection (22 to 26 feet wide) with homes ranging from approximately 1,000 to 1,800 square feet. We intend to offer up to ten (10) different front -loaded garage homes with one -car garages and four (4) different alley -loaded homes with one -car or two -car garage options. Other options in the floor plans, such as guest rooms, additional baths or utility rooms, are intended to meet diverse family needs and lifestyles. Each lifestyle floor plan will have three (3) elevations. That is, for each plan the buyer will have a choice of three front fagades which are designed to be pedestrian oriented and provide visual interest. These elevations will vary in roof form, porch design and/or fagade detailing. We have made every effort to create diversity in plans and elevations. The success of our communities is based upon this program of offering the buyer choices that result in varied roof and porch forms, different textures in the siding and exterior elements, and a mixed color palette on siding, trim, and accents (doors and shutters). The primary ground floor entries will be oriented toward the streets. Furthermore, fagades will vary from one building to the next to further diversify the streetscape. We also ensure variety in elevations and scale by not allowing the same home elevations to be built on adjoining lots. In addition to the Cottage Collection, the site plan proposes ten (10) home sites that will allow for a limited number of larger homes. A limited offering of our Olympic (30-foot wide) homes will provide additional diversity in the neighborhood. These homes will be available with 2-car garage standard in approximately 1,500 to 3,000 square feet. Many of the same options are available in these floor plans as well. The South 320th Place Homeowners Association will be an essential and important part of the Quadrant homeowner community. Quadrant Homes values the legacy we leave in a community. For that reason, we ensure that each community we develop has a capitalized, educated, functioning Homeowners Association at the time of transition to homeowner control. The purpose of a Homeowners Association is to maintain the common areas, ensuring a consistent look throughout the community, and enhance the sense of community. It is intended to prevent neighbors from making changes to their homes and using their property in ways that negatively impact property values. To create that legacy, we use the following tools and techniques to help our HOAs run well: • Covenants, Conditions and Restrictions ("CC&Rs") include important use restrictions (such as restrictions on RV and boat parking), and empower the Board of Directors to enforce them, including the power to raise, spend and save money for the benefit of the community over the long term. • Rules and Covenant Enforcement Policy is in place before we open for sale. It restates the use restrictions in a format people will read. Our property managers make sure the Rules are enforced during developer control, establishing solid traditions of compliance. • The Property Improvement Handbook is a full -color, illustrated guide to what changes to the exterior of the property are and are not acceptable. Quadrant Homes uses an independent architect to manage the property improvement committee process (others may use the term "Architectural Control Committee" or "ACC") during development; to educate a Property Improvement Committee of homeowners before transition; and to provide ongoing services after transition if the Board wishes. • Property Managers and other key vendors, such as landscape maintenance contractors, are under contract to the HOA before the first home closes. Our goal is for these vendors to provide outstanding service and continue to work for the HOA before, during and after transition. + A Build -out Budget is established that includes vendor contracts, so income from assessments ("dues") is sufficient to cover necessary services without the need to steeply increase assessments after transition. In addition, we have a professional reserve study performed before transition, and establish a reserve account. A reserve study recommends the level of savings necessary to repair or replace all common area amenities over a 20-year time horizon, and helps ensure financial stability for the HOA. • Websites are established for each HOA, where the CC&Rs, Rules and Covenant Enforcement Policy, Property Improvement Applications, Handbook, and all other important information are available to homeowners online. Other homeowner education includes welcome packets, homeowner skills workshops before transition, and board training afterwards. The Quadrant Homes Small Lot Demonstration Project application is in compliance with Federal Way City Code Section 20-155 and the Small Lot Detached Dwelling Unit Use. See zoning code compliance chart in "Code" tab. Quadrant Homes, if selected as the Small Lot Demonstration Project builder, would like to entitle South 320t' Place in early 2008 and begin construction of the plat improvements in the spring of 2008. Home construction and sales would then commence in early 2009. The schedule is challenging and will require that the City proceed with parallel review of the engineering construction plans before final approval of the preliminary plat. A more detailed development schedule is included in the "Schedule" tab. Quadrant Homes is a natural choice for the first Small Lot Demonstration Project in Federal Way. We have over 35 years of land use development history with the City of Federal Way beginning with our parent company's corporate headquarters and continuing through the 15-year development of West Campus. Quadrant Homes has over 38 years of homebuilding experience in the five county Puget Sound area. Quadrant Homes prides itself on delivering compelling value to our homebuyers, many of whom are young families and first time homebuyers. We have an extensive array of small lot home plans that we have built and marketed in the Puget Sound area. These house plans have proven their value to our buyers. The wide array of house plans that Quadrant can offer and the range of options available to the buyer will create an attractive and varied streetscape within South 320fl' Place. The streetscape views shown in the "Plan" tab illustrate how these different house plans will appear from the street. Quadrant Homes understands the goals and objectives of the City of Federal Way in creating the Small Lot Development provision of the zoning code. Quadrant Homes is ready to demonstrate to the City of Federal Way that small lot housing with compelling value can be created in an attractive and sustainable community and still be accessible to young families and first time homebuyers. We urge the City to select Quadrant Homes to complete the first Small Lot Demonstration Project in the City of Federal Way. South 320th Place Description of Maps and Drawings n South 320th Place Site Plan The South 320th Place Site plan is a graphic layout of the lots, road, open space tracts and location of the storm drainage detention pond. The local access roads are intended to be public. Driveways are shown in light blue shading. The proposed road sections are shown in the upper left hand area of the drawing. A preliminary set of more detailed engineering drawings of the project site is attached to the application booklet. II) Alley Load Streetscape Drawing This drawing is a 3-dimensional representation of the main entrance to South 320th Place. It is a view of what might be seen from the second story window of lot 100 looking North East toward lots 7 through 11. The architectural rendering of the homes on lots 7 through 11 are created by using actual architectural plans for these Quadrant homes. All of the homes shown in this architectural rendering will be available for purchase by South 320th Place home buyers. The front elevation of the homes, display a number of architectural features such as window grids, shutters and window boxes. Some of these architectural features will be standard on the South 320th homes, while other features (such as the window boxes) can be selected by the home buyer at the time of purchase and will be added to the cost of the home. III) Front Load Streetscape Drawing This drawing is a 3-dimensional representation of the front load homes on lots 41 through 48 along the cul-de-sac local access street. It is a view of what might be seen from the second story window of the home on lot 20 looking westerly. The architectural rendering of the homes on lots 41 through 48 are created by using actual architectural plans for these Quadrant homes. All of the homes shown in this architectural rendering will be available for purchase by South 320th Place home buyers. The front elevation of the homes, display a number of architectural features such as window grids, shutters and window boxes. Some of these architectural features will be standard on the South 320th homes, while other features (such as the window boxes) can be selected by the home buyer at the time of purchase and will be added to the cost of the home. LOT NUMBER LOT AREA (Sf) MIN FRONT SET BACK (ft) MIN REAR SETBACK (N) M N SIDE SETBACK (f!) 66 10 20 2-3 3315 10 20 5 4 2975 10 20 15 5-6 3145 10 20 g 7 3060 10 Za 5 5 310 10 20 5 9-10 3060 10 20 5 11 36B9 10 20 5 12-17 2713 20 1 5 ,6 29D, 20 15 5 19 2972 20 15 5 20 2907 20 15 5 21 3456 20 15 5 22 2749 20 15 5 23 2745 20 15 5 24 2742 20 15 5 25 2739 10 15 5 26 2735 10 15 5 27 2732 20 15 5 26 2729 20 15 5 29 2725 20 15 5 30 2722 20 15 5 31 12719 20 75 5 32 2715 20 TS 5 33 12712 20 15 5 1 52' RIGHT I C. R FYI 5 5' 1 5 10' --�-17 5r RIGHT-OF-W1 D 25 5a ,a0 HORIZ. Scale In Feet PROPOSED LEGEND ROW 52' ASPHALT PAVEMENT PAVEMENT 28' WIDTH r— - SDEWALK I,.. _ _� SIDEWALKS /DRIVEWAYS WIDTH 5 LANDSCAPE [Y =J LANDSCAPE STRIP STRIP 4.5' y (TPROPERTY LINE STRIP 2 5' — — RIGHT OF WAY LINE C N Co ----- - - - - -- -s- -- r 1 — — — R/W SOUTH 320TH PLACE JOB NUMBER 05809 f� (DESIGNED —f- 1c= (DRAWN SITE PLAN I SHEET NAME A05 SHEET 1 OF �'� • �`i: rr' , _ Jam, ,� ..�... ' _ " " - 'Q}' ice} pJ{ � �e• �.�, . I f-:-' � fir• _ ` ;ti . I I L u Emu Ir fjl r A-b South 320th Place Schedule to Start of Construction November 30, 2007 Task Quadrant Target Completion Date Apply for Small Lot Development Pre -application Conference Se tember 28, 2007 Meet with City Pre -application Development Review Committee October 18, 2007 Pre -application Letter issued by the City November 5, 2007 Quadrant Homes Submits application for selection as a Small Lot Demonstration Project November 30, 2008 Letter of Completeness Issued by the City of Federal Way December 14, 2007 Decision by the City of Federal Way to Select Quadrant as the Small Lot Demonstration January16, 2008 Submit Preliminary Plat application January 23, 2008 Letter of Preliminary Plat Application Completeness issued by City of Federal Way February 6, 2008 Submit Engineering Construction Plans for review February 15, 2008 Preliminary Plat Public Hearing April 1, 2008 Preliminary Plat approval by City Council May 1, 2008 Engineering Plans approved May 8, 2008 Start Construction May 12, 2008 Federal Way Zoning Code Requirements for Small Lot Detched Homes in RM 2400 Zone September 27, 2007 Zoning Code Requirement Federal Way Zoning Code Requirements in Chpt 22-667 Attached, Detached, Staked Dwelling units South 320th Place Lot Size 2400 Sq. Ft Min lot size Smallest lot 2,712 sq. ft. Approx. 3.000 s . ft. Ave lot size 1.7 Parking spaces per dwelling unit 208 Parking Spaces Required Approx. 240 Maximum Ridge Ht 30 feet 27 feet Max. Lot Coverage No maximum lot coverage 45% Typical South 320th Place Open Space Requirements December 3, 2007 Type of Open Space Tract Open Space Tract Open Space Tract Area % of Gross Area Required % of Gross Area Notes Usable Open Space PT-1 and PT-2 1.08 Ac 7.0% 10.0% Open Space Tract T-1, T-2 and T-3 have been deducted from the usable open space % contribution calculation. Trail construction has been proposed to meet the remaining 3% Usable and active Open Space requirement Buffer T-1, T-2 and T-31 3.39 Ac 17.9% 2.0% Total Percent of Gross Area 24.9% 15.0% South 320tn Place Description of Application Attachments The following plans were prepared in support of the Quadrant Homes Application for selection as the Small Lot Development project in Federal Way. The plans described below are an attachment to the Small Lot Development application booklet and are intended to meet some of the Small Lot Development application checklist requirements. 1) Site Plan Drawings Prepared by PACE Engineers, Inc The attached site plan drawing, dated November 30, 2007 shows the lot layout, building setbacks and lot grading as well as the site road and utility layout. A single storm drainage facility has been proposed for the South 320tn site. A Storm Drainage "Preliminary Technical Information Report" dated November 29, 2007 has been prepared by PACE Engineering and submitted to the City for review as a submittal separate from the South 320tn Place application for Small Lot Demonstration Project. Sheet 1 of the plan set shows existing site wetlands. A "Critical Areas Report" for the South 32e site dated November 30, 2007 has been prepared by Talasaea Consultants. The Critical Areas report has been submitted to the City for review as a submittal separate from the South 320th Place application for Small Lot Demonstration Project. 2) Landscape and Park Plan A Landscape and Park Plan, dated November 30, 2007 is included in the Site Plan Drawing set on sheets L1.0 and L1.2. The Landscape and Park Plan was prepared by The Weisman Design Group. South 32Oth Place Parcel Numbers Parcel No. Parcel Area 551560-0005 2.41 ac 551560-0010 2.57 ac 551560-0015 2.57 ac 551560-0020 2.57 ac 551560-0026 1.29 ac 551560-0025 1.38 ac 551560-0030 2.75 ac 551560-0035 1.61 ac 551560-0091 0.72 ac 551560-0090 1.25 ac Total Area 19.12 ac RECEIVE® NOV 3 0 2007 CITY OF FEDERAL WAY BUILDING DEPT. SOUTH 320TH PLACE SMALL LOT DEMONSTRATION PROJECT RIGHT-OF-WAY IMPROVEMENT MODIFICATION REQUEST CITY OF FEDERAL WAY December 12, 2007 I) Description of Modification Request This modification request is to allow an alternate lane and parking configuration for City of Federal Way Development Standard Road Section "W". The requested modification to Road Standard "W" is proposed for use as the primary local access street be use in the Small Lot Demonstration Project of South 32& Place currently before the City for review and selection as the first Small Lot Demonstration project in the City of Federal Way. The request for modification is being made pursuant to FWCC 22-1477. II Requested Code Modification This is a request to modify Local Access Road Section "W" which is contained in the City of Federal Way Development Standards. The Development Standards are an adopted part of the City Zoning Code, Chapter 22, Article XVI, "Improvements". II) Reason for requesting Modification FWCC 22-1477 (1) "The improvement as required would not be harmonious with existing street improvements, would not function property or safely and would not be advantageous to the neighborhood or City as a whole " The proposed modification is to allow two 10 foot travel lanes and one 8 foot parking lane in lieu of one 12 foot travel land and two 8 foot parking lanes. The proposed modification to road section "W" would create a modified road section identical to the paved curb to curb road section of the City of Federal Way Collector Road Section "S" but with only one 8 foot parking lane. Attachment A shows the proposed modification to Road Section "W". Attachment "B" shows Road Section "W" without modification and Attachment "C" shows Collector Road Section "S". We believe that this road section would function better as a two way local access road while providing more than the required parking spaces for the South 3201h Place site plan. Since theyrinciple local access road provides through traffic from South 320"' Street to 32' Ave South a two lane configuration similar to Collector Road Section S would function more safely than a single 12 foot lane. Since approximately 90 % of the local access streets are single loaded, only one side of the local access roads will have driveways, a single lane of parking will provide more than the required paring spaces. The South 3201h Place pre -application comment letter of November 5, 2007 RECEIVED requires a Local Access Type "W" road section for the public roads of South DEC 13 2007 CITY OF FEDERAL WAY BUILDING DEFT, 52' RIGHT OF WAY ROW � 5' SIDEWALK - 10' DRIVE LANE �-10' IVE LANE $1 PARALLEL PARKING r 2.5' 4.5' LANDSCAPE j 6" CURB & GUTTER (TYP) 5' SIDEWALK j 1 4. 5' 7 2. 5' NDSCAP I li 3' 5' 4' 8' �.--12' 8' 4' 5' 3L -i' Util. N Parking Parking �2 N Util. Strip o m m Strip o X 28' 52 MINIMUM SECTION LOCAL .25' CLASS B .17' CSTC .42' CSBC 1 LANE + PARKING SECTION W NOTES: amw PUBLIC LOCAL DWG. NO- roduag "ft WORKS 3-2W *ftiGdI11xJUT "C ,• 3S'�21 '8' 10' 10' 8' 4' 5' 3' Util. arking Parking n a Util. strip f u o f Strip o o is 3 6' 60' MINIMUM SECTI❑N MIN❑R COLLECTOR LOCAL .25' CLASS B .25' CLASS B .17' CSTC .17' CSTC .50' CSBC .50' CSBC 2 LANES + PARKING SECTION S NOTES: <%`\\ �(� PUBLIC I COLLECTOR DWG. N0. ft [ �U uvcsi�J ft WORKS I 3-2S