18-103329-PCCITY OF Y Federal Way Centered on Opportunity September 14, 2018 Mike Davis River Rock Homes, LLC 19655 1"Avenue South, Suite 204 Normandy Park, WA 98166 mike@rockrivernw. com Re: File #18-103329-00-PC, PREAPPLICATION CONFERENCE SUMMARY Steel Lake Crest Subdivision, 30642 281h Avenue South, Federal Way Dear Mr. Davis: FILE 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com Jim Ferrell, Mayor Thank you for participating in the preapplication conference with the City of Federal Way's Development Review Committee (DRC) held August 30, 2018. We hope that the information discussed at that meeting was helpful in understanding the general requirements for your project as submitted. This letter summarizes comments given to you at the meeting by the members of the DRC. The members who reviewed your project and provided comments include staff from the City's Planning and Building Divisions, Public Works Department, and representatives from Lakehaven Water and Sewer District and South King Fire and Rescue. Some sections of the Federal Way Revised Code (FWRC) and relevant information handouts are enclosed with this letter. Please be advised, this letter does not represent all applicable codes. In preparing your formal application, please refer to the complete FWRC and other relevant codes for all additional requirements that may apply to your project. The key contact for your project is me, Becky Chapin, becky.chapin@cityoffederalway.com, 253-835- 2641. For specific technical questions about your project, please contact the appropriate DRC representative as listed below. Otherwise, any general questions about the preapplication and permitting process can be referred to your key contact. PROJECT DESCRIPTION Proposed 26-lot subdivision of 4 existing single family lots totaling 6.72 acres. Three houses proposed to remain through a Boundary Line Adjustment. MAJOR ISSUES Outlined below is a summary of the major issues of your project based on the plans and information submitted for preapplication review. These issues can change due to modifications and revisions in the plans. The major issues section is only provided as a means to highlight critical requirements or issues. Please be sure to read the comments made by all departments in the following section of this letter. Mr. Davis September 14, 2018 Page 2 • Planning Division 1. The subject property currently has Preliminary Plat approval for a 28-lot subdivision valid until April 9, 2020. 2. A new Preliminary Plat application is required for proposed substantial changes to the plat layout. • Public Works Traffic Division 1. Transportation Concurrency Management (FWRC 19.90) — Transportation concurrency permit with application fee of $4,790.00 is required for the proposed project. 2. Traffic Impact Fees (FWRC 19.91) — Traffic impact fees are required for each residential dwelling unit assessed at building permit issuance. 3. Frontage Improvements (FWRC 19.135.040) — Construct street improvements and dedicate right-of-way (ROW) along the property frontage on 281h Ave S. 4. Internal road shall be a Type "W" street and shall serve no more than 25 lots or 250 daily traffic. 5. Block Perimeter (FWRC 18.55.010 & FWRC 19.135.251) — The development shall meet block perimeter requirements of 1,320 feet for non -motorized access, and 2,640 feet for streets. This requirement may be modified or waived by the Public Works Director if connections cannot be made for reasons outlined in the FWRC. 6. Intersection Sight Distance — Submit intersection sight distance analysis consistent with AASHTO at the proposed new street connection to 281h Ave S. DEPARTMENT COMMENTS Outlined below are the comments made by the representatives of each department present at the preapplication conference. Each section should be read thoroughly. If you have questions, please contact the representative listed for that section. COMMUNITY DEVELOPMENT — PLANNING DIVISION Becky Chapin, 253-835-2641, becky.chapin@cityoffederalway.com 1. Zoning Designation and Density — The site is zoned Single Family Residential (RS 7.2) and has a comprehensive plan designation of high density single-family. Lots in the RS 7.2 zone must be a minimum lot size of 7,200 square feet. Property set aside in tracts or vehicular access easements cannot count towards the minimum lot area per FWRC 19.05.120 "lot area." 2. Review Process — The subject property currently has Preliminary Plat approval for a 28-lot subdivision (File #07-103897-SU) approved by the City on April 7, 2009. After subsequent extensions, the plat is valid until April 9, 2020. As proposed, substantial changes to the approved preliminary plat requires submittal of a new preliminary plat application. The subdivision of ten or more lots requires review and decision on the preliminary plat application by the city's Hearing Examiner following a public hearing. In summary, following application, the City will review the application for completeness and technical comments. The first procedural decision point is the State Environmental Policy Act (SEPA) review and determination. Following conclusion of the SEPA review, City staff will present the staff report and recommendation on the preliminary plat to the Hearing Examiner, who then makes the final decision on the preliminary plat application. The Hearing Examiner's written decision on the preliminary plat is based on the applicant satisfying criteria pursuant to FWRC 18.35.170(3). The decision of the Hearing Examiner may be appealed pursuant to FWRC 18.35.210. 18-103329-00-PC Doc ID:78122 Mr. Davis September 14, 2018 Page 3 After the final decision on the preliminary plat, engineering plans must be submitted and reviewed by the City Public Works Department. Following review and approval of engineering plans, construction of plat infrastructure may begin. Substantial completion of plat improvements is required prior to final plat review and decision by the City Council. The final plat fee, in effect at the time of the final plat application, and items identified in FWRC 18.40.020, are required to process the final plat. The City allows bonding of only minor improvements such as sidewalks, street lighting, landscaping, or similar improvements. Within 30 days of a complete final plat application, City Council will take action on the plat and upon approval the applicant must record the plat with the King County Recorder's Office. For an itemized list of required information to be included in the preliminary plat submittal, please refer to the enclosed preliminary plat submittal checklist. Boundary Line Adjustment — The applicant proposes to keep the existing three houses on reduced sized parcels then subdivide the remaining lot, which would require a Boundary Line Adjustment (BLA). BLA applications are reviewed for conformity with FWRC Title 18 `Subdivisions', FWRC 18.10 `Boundary Line Adjustments', and FWRC 18.55 `Design Criteria'. A boundary line adjustment is subject to an administrative review conducted by city staff with a final decision made by the Director of Community Development. See comment #8 below for comments regarding setbacks. State Environmental Policy Act (SEPA) — The proposed subdivision is not categorically exempt from environmental review pursuant to Washington Administrative Code (WAC) 197-11-800 and is subject to a threshold determination. The City issued a Mitigated Environmental Determination of Nonsignificance (MDNS) for the 29-lot preliminary plat on October 4, 2008. This determination was based on review of information in the project file, including the environmental checklist and staff evaluation of the environmental checklist for Steel Lake Crest Preliminary Plat, resulting in the conclusion that the proposal would not result in probable significant adverse impacts on the environment. Depending on the extent of the changes in the proposed development, they City may issue a new determination or an addendum to the previous SEPA determinations. A completed environmental checklist must be submitted with the preliminary plat application for review and consideration. 4. Public Notice — The preliminary plat (and SEPA, if required) review require notices of application and public hearing. The applicant will be responsible for supplying a map and list of all properties within 300 feet of the subject property. Three sets of stamped mailing envelopes for each property owner with the department's return address must accompany the map and list. The city's GIS Department provides this service for a nominal fee. Please see the enclosed bulletin for further information. The applicant will also be required to post City supplied notice boards at the appropriate times and pay the notice board fee. Environmentally Critical Areas — The site naturally slopes from the southwest corner to the northeast corner. There is an approximate drop of 70 feet across the site, with an average slope of 9.3%. There are a few small areas where the average slope exceeds 40%. The majority of these steep slopes are near the existing houses that have slopes up to 40%. As such, the site contains Geologically Hazardous Area (GHA) and is subject to review under FWRC Chapter 19.145, Environmentally Critical Areas. 18-103329-00-PC Doc ID:78122 Mr. Davis September 14, 2018 Page 4 Pursuant to FWRC 19.145.220, if the applicant proposes to develop or conduct land surface modifications within 50 feet of the critical area, the applicant must submit a geotechnical report to the City's satisfaction. As part of the preliminary plat application submittal a geotechnical report, prepared by a geotechnical engineer or engineering geologist licensed in the state, is required to be submitted. The geotechnical report may be reviewed by the city's third party consultant at the applicant's expense per FWRC 19.145.080(3). Shoreline Management — A small portion of the northwest corner of the subject site is mapped within 200 feet from Steel Lake, which is regulated as a shoreline of the state under FWRC Chapter 15.05. Development projects within 200 ft. of a shoreline of the state are required to apply for a Shoreline Substantial Development Permit, in addition to the underlying permit action. However, with the previous Steel Lake Crest preliminary plat, the applicant submitted a request to the Director of Community Development in 2007 for an exemption from the substantial development process stating that the potential impacts to the shoreline were very minimal as only the half street frontage improvements being required by the City and located at the northwest corner of the parcel was within 200 ft. of the shoreline. Of that area, 289 sq. ft., over half of the area would be paved dedicated right- of-way and most of the remaining area would be a landscaping buffer. The exemption was granted as requested on May 10, 2007. As part of the preliminary plat submittal, a written description of the work proposed within the 200- foot shoreline jurisdiction is required. The city will determine if the existing exemption is valid or if a new shoreline exemption or substantial development permit is needed. 7. Fees —As development fees change annually, please contact the Permit Center at 253-835-2607 or permitcenter@cityoffederalway.com for an updated fee list prior to submitting your applications. Additional utility fees, school impact fees, concurrency, and engineering plan review fees apply. 8. Setbacks — Existing and future residences must conform to the following structural setback requirements of FWRC 19.200.010, "Detached Dwelling Units": front yard - twenty feet; side yard - five feet; and rear yard - five feet. Side yard setback from a corner lot for that portion of the lot not adjacent to the primary vehicular access is ten feet. Depict these typical building setback requirements on the proposed plat. Meeting follow-up: As long as you are not making the houses more nonconforming, existing nonconformances, such as the front yard setback can remain under the BLA review. You would need to meet setbacks for any relocated property lines, such as the side and rear. If you skip the BLA process, then all existing structures must meet required setbacks when submitting the preliminary plat drawing. Single -Family Residential Regulations a. Maximum height of structures — 30 ft. above average building elevation. b. Maximum lot coverage — 60 percent. c. Required parking spaces — two per dwelling unit. d. Driveway and/or parking pad in a required front yard may not exceed 20 feet in width (except as specified in FWRC 19.130.240(1)(b)) and may not be closer than five feet to any side property line (unless shared access). 18-103329-00-PC Doe ID:78122 Mr. Davis September 14, 2018 Page 5 10. Landscape Buffers — Pursuant to FWRC 18.60.030, preliminary plats adjacent to a city designated arterial (28"' Ave S & Military Rd S) must provide a 10-foot-wide Type III landscape strip along the arterial street. The landscape tract is required to shield new residences from the arterial street and will be equally owned and maintained by the homeowners' association; up to 2% can be credited to the open space buffer requirements. Perimeter fencing in subdivisions shall be located on the interior side of landscape strips planted along arterial streets. Type III landscape consists of a mixture of evergreen and deciduous trees interspersed with large shrubs and groundcover. 11. Open Space — All residential subdivisions are required to provide open space in the amount of 15 percent of the gross land area of the subdivision site per FWRC 18.55.060(2). A minimum 10 percent of the open space is required to be usable open space; i.e. appropriate for active recreation areas. Additionally, any onsite open space must be set aside in a tract and owned in common undivided interest by all property owners within the subdivision. All or some of the open space requirements may be satisfied by a fee -in -lieu payment at the discretion of the Parks Director after consideration of the city's overall park plan, quality, location, and service area of the open space that would otherwise be provided with the project. The fee in lieu of open space is calculated on 15 percent of the most recent assessed land value of the property. If the fee -in - lieu option is chosen, a written request to the Parks Director is required. A copy of this request is a required component of the short/preliminary plat application. The open space fee -in -lieu shall be paid prior to recording the plat. 12. Clearing and Grading — The preliminary plat is subject to the provisions of FWRC 19.120, "Clearing, Grading, and Vegetation and Tree Retention." It is recommended that FWRC 19.120 be reviewed carefully in reference to the proposed plat. A clearing and grading plan that meets FWRC 19.120.020 and FWRC 19.120.040 must be submitted with the formal plat application, if clearing and grading work is proposed. Any retaining walls and rockeries can be a maximum of six feet in height and must comply with standards in FWRC 19.120.120. Preliminary designs for retaining walls shall be submitted with the preliminary plat application, and include cross sections, and visual depictions of retaining walls. 13. Tree Retention/Replacement — The plat will be subject to tree density requirements of FWRC 19.120.130(1); note that 25 tree units per acre are required for single-family zoned sites. A tree unit is a value assigned to existing trees retained on the property or replacement trees. The larger the tree, the greater value it is assigned. Required tree density can be composed of retained trees and replacement plantings per FWRC 19.120.130. The tree and vegetation plan must clearly show where the tree units are to be located. The formal application must indicate what trees are to be removed. In the case of the 6.72-acre site, approximately 168 tree units are required. Tree unit credits are in Table 2 of FWRC 19.120.130(2). Per FWRC 19.120.130(3), the total number of tree units required to be provided is calculated by multiplying gross site acreage, minus any proposed public or private streets. 14. Forest Practices Permit — The City has assumed jurisdiction over the review and approval of Class IV -General Forest Practices permits. A forest practices application form must be completed if more 18-103329-00-PC Doc ID:78122 Mr. Davis September 14, 2018 Page 6 than 5,000 board feet of merchantable timber is harvested from the subject property. This is approximately equal to one log truck of timber. The City will review the proposed Class W-General Forest Practices in conjunction with the Preliminary Plat application. Please include details of such activity in the environmental checklist as the Class IV permit is not exempt from SEPA review. 15. Design Criteria and Improvements — Preliminary Plats are subject to the subdivision design and improvements criteria set forth in FWRC Chapters 18.55 and 18.60. It is the responsibility of the applicant to identify how the proposed subdivision meets applicable design and improvements criteria and is therefore entitled to the land division. 16. Noise — The subject site abuts the Interstate-5 right-of-way. Currently, this portion of the Interstate does not contain any noise walls or other noise attenuation measures. To identify the potential environmental impact of freeway noise on proposed single-family residential development, the applicant shall provide with the formal preliminary plat application a noise study that documents noise freeway levels and identifies appropriate measures to mitigate adverse noise impacts on the future development. 17. School Access Analysis — A school access analysis is required to be submitted to the City with the preliminary plat application, to assure that safe walking routes to schools or bus stops are provided as required by RCW 58.17. If there are not safe and adequate walking routes available, walking route improvements may be required as part of the plat review process. Contact Jennifer Wojciechowski at 253-945-2071 for information about the school access analysis requirements. 18. School Impact Fees — School impact fees are due at the time of issuance of a building permit for new dwelling units. This fee amount is subject to change as determined annually by the Federal Way School District. Please check with the Permit Center, as mentioned above, for up-to-date fees. 19. Approval Duration — Preliminary plat approval expires five years from the date of approval, per FWRC 18.35.220. Engineering plans must be approved, improvements constructed, and the plat must be recorded within the five-year time period. Pursuant to FWRC 18.05.090, no less than 60 days prior to the lapse of approval, the applicant may request a two-year time extension for the plat approval. 20. Recording — Following substantial completion of subdivision improvements and City Council review of the final plat, the applicant is responsible for recording the plat with the King County Recorder's Office. Prior to recording the plat, all surveying and monumentation must be complete. In addition, all other required improvements must be substantially completed as determined by the departments of Community Development and Public Works. PUBLIC WORKS — DEVELOPMENT SERVICES DIVISION Ann Dower, 253-835-2732, ann.dower@cityoffederalway.com Land Use Issues — Stormwater 1. Surface water runoff control and water quality treatment will be required per the 2016 King County Surface Water Design Manual (KCSWDM). This project meets the requirements for a Full Drainage Review. At the time of preliminary plat submittal, a preliminary Technical Information Report (TIR), addressing the relevance of the project to the nine core and five special requirements of the 18-103329-00-PC Doc ID:78122 Mr. Davis September 14, 2018 Page 7 KCSWDM will be required. A Level 1 downstream analysis shall also be provided in the preliminary TIR. The City has V = 100', five-foot contour planimetric maps in GIS format that may be used for basin analysis. 2. The project lies within a Conservation flow control area, thus the applicant must design the flow control facility to meet this performance criteria. In addition to flow control facilities, Best Management Practices (BMP's) are required as outlined in the KCSWDM. The project also lies within an Enhanced Basic Water Quality Area. Water Quality Treatment shall be designed to meet the treatment criteria of the Enhanced Basic Water Quality Menu. 3. If infiltration is proposed, soil logs prepared by a licensed geotechnical engineer or septic designer must be provided to verify infiltration suitability. 4. Detention and water quality treatment facilities for subdivisions are required to be above ground (i.e. an open pond), within a separate storm drainage tract, and dedicated to the City for future maintenance. Detention and water quality facilities may be within the same tract. Underground facilities are allowed only with approval from the City of Federal Way Stormwater Management Division. Show the proposed location and dimensions of the detention and water quality facilities on the preliminary plans. 6. If more than one acre will be disturbed during construction, a National Pollutant Discharge Elimination System (NPDES) construction storm water permit may be required. Information regarding this permit can be obtained from the Washington State Department of Ecology at h ://www.ec .wa. ovl ro -amslwlstormwater/construction/index.litml or by calling 360-407- 6048. Right -of -Way Improvements See the Traffic Division comments from Sarady Long, Sr. Transportation Planning Engineer, for traffic related items. 2. If dedication of additional right-of-way is required to install street frontage improvements, the dedication shall be conveyed to the City through a statutory warranty deed. The dedicated area must have clear title prior to recording. 3. All stormwater treatment and detention requirements outlined above may apply to any improvements within the public right-of-way. 4. FWRC 19.135.280 requires that driveways serving residential uses may not be located closer than 25 feet to any street intersection. Lots and intersections within new subdivisions or short plats must be designed to meet this standard. 5. If utility extensions requiring open cuts within public right-of-way are proposed, half -width or full - width overlay requirements will apply. The extent of overlay requirements will be determined by the City of Federal Way Public Works Department based on the plans. 18-103329-00-PC Doc ID:78122 Mr. Davis September 14, 2018 Page 8 Building (or EN) Permit Issues l . Engineered plans are required for clearing, grading, road construction, and utility work. Plans must be reviewed and approved by the City. Engineering review fees are $2,503.00 for the first 12 hours of review, and $139.00 per hour for additional review time. A final TIR shall be prepared for the project and submitted with the engineering plans. Both the TIR and the plans will require the signature/seal of a professional engineer registered/licensed in the State of Washington. 2. In addition to engineering approval, projects that will be filling or grading in the area of the future building pads are required to obtain a separate grading permit from the Building Department. 3. If walls are proposed within the future right-of-way or within the storm tract, third -party review may be required at the developer's expense. 4. The Federal Way Public Works Development Standards Manual (including standard detail drawings, standard notes, and engineering checklists) is available on the City's website at http://www.oiiyoffederalway.com/index.aspx?ni to assist the applicant's engineer in preparing the plans and TIR. Bonding is required for all street improvements and temporary erosion and sediment control measures associated with the project. The bond amount shall be 120 percent of the estimated costs of the improvements. An administrative fee deposit will need to accompany the bond to cover any possible legal fees in the event the bond must be called. Upon completion of the installation of the improvements, and final approval of the Public Works Inspector, the bond will be reduced to 30 percent of the original amount and held for a two-year maintenance period. 6. The developer will be responsible for the maintenance of all storm drainage facilities (including the detention and water quality facilities) and street systems during the two-year maintenance period. During that time, the Public Works Inspector will make periodic visits to the site to ensure the developer's compliance with the maintenance requirements. Upon satisfactory completion of the two- year maintenance period, the remainder of the bond will be released. Maintenance for public roads and subdivision drainage facilities then become the responsibility of the City. Maintenance for private roads and drainage facilities, including short plats, remain the responsibility of the individual property owners. 7. When topographic survey information is shown on the plans, the vertical datum block shall include the phrase "DATUM: N.G.V.D.-29" or "DATUM: K.C.A.S.," on all sheets where vertical elevations are called out. 8. Drawings submitted for plan review shall be printed on 24" x 36" or 22" x 34" paper. Site plans shall be drawn at a scale of 1" = 20', or larger. Architectural scales are not permitted on engineering plans. 9. Provide cut and fill quantities on the clearing and grading plan. 10. Temporary Erosion and Sediment control (TESC) measures, per Appendix D of the 2016 KCSWDM, must be shown on the engineering plans. 11. The site plan shall show the location of any existing and proposed utilities in the areas affected by construction. 18-103329-00-PC Doc ID:78122 Mr. Davis September 14, 2018 Page 9 PUBLIC WORKS TRAFFIC DIVISION Sarady Long, 253-835-2743, sarady.long@cityoffederalway.com Transportation Concurrency Analysis (FWRC 19.90) Based on the submitted materials for 29 Single Family Detached Housing, the Institute of Transportation Engineers (ITE) Trip Generation - 10"' Edition, land use code 210 (Single Family Detached Housing), the proposed project is estimated to generate approximately 29 new weekday PM peak hour trips. 2. A concurrency permit is required for this development project. The PW Traffic Division will perform concurrency analysis to determine if adequate roadway capacity exists during the weekday PM peak period to accommodate the proposed development. Please note that supplemental transportation analysis and concurrency mitigation may be required if the proposed project creates an impact not anticipated in the six -year Transportation Improvement Plan (TIP). The estimated fee for the concurrency permit application is $4,790.00 (11 — 50 pm Trips). This fee is an estimate and based on the materials submitted for the preapplication meeting. The concurrency application fee must be paid in full at the time the concurrency permit application is submitted with land use application. The fee may change based on the new weekday PM peak hour trips as identified in the concurrency trip generation. The applicant has the option of having an independent traffic engineer prepare the concurrency analysis consistent with City procedures; however, the fee remains the same. Transportation Impact Fees (TIF) (FWRC 19.91) Based on the submitted materials for 29 new single family lots, the estimated traffic impact fee is S103,773. The total amount of the impact fees will be assessed and collected from the applicant when the building permit is issued, using the fee schedule then in effect. The applicant may request, at any time prior to building issuance to defer the payment of the impact fee to final building inspection. If this option is selected, a covenants prepared by the city to enforce payment of the deferred fees will be recorded at the applicant's expense on each lot. Please, refer to defer payment of impact fee code for process. Street Frontage Improvements (FWRC 19.135) 1. The applicant/owner would be expected to construct street improvements consistent with the planned roadway cross -sections as shown in Map III-4 in Chapter III of the Federal Way Comprehensive Plan (FWCP) and Capital Improvement Program (CIP) shown as Table III-10 (FWRC 19.135.040). Based on the materials submitted, staff conducted a limited analysis to determine the required street improvements. The applicant would be expected to construct improvements on the following streets to the City's planned roadway cross -sections: 281h Ave S is a principal collector planned as a Type "K" street, consisting of a 44' street with curb and gutter, 6' planter with street trees, 8' sidewalks and street lights in a 78' right-of-way (ROW). Assuming a symmetrical cross section, half street improvements and 9' right-of-way dedication are required as measured from the street centerline. ■ Internal road shall be a Type "W" street consisting of a 28' street with curb and gutter, 4' planter strip with street trees, 5' sidewalks and street lights in a 52' right-of-way (ROW) and shall be designed to meet all applicable standards. Traffic calming devices such as 18-103329-00-PC Doc ID:78122 Mr. Davis September 14, 2018 Page 10 speed humps, chicanes, etc. should be incorporated in the residential street design. Please note, a second access will be required should the number of lots accessing onto 281, Ave S exceed 25 lots or 250 daily traffic. 2. The applicant may be required to dedicate additional ROW to accommodate turn lane improvements if identified in the transportation impact analysis and/or property corner radius. It appears that a Two - Way Left Turn Lane (TWLTL) may be required at the access point as a sight distance mitigation measure. 3. The applicant may make a written request to the Public Works Director to modify, defer, or waive the required street improvements (FWRC 19.135.070). These modification requests have a nominal review fee currently at $278 plus recording fee. Access Management (FWRC 19.135) 1. Access management standards are based on roadway safety and capacity requirements. FWRC 19.135.280 provides access standards for streets based on planned roadway cross -sections. Please note that access classifications are per Drawing 3-IA in the Public Works Development Standards. 2. The proposed single access onto 28"' Ave S will be able to accommodate 25 lots or up to 250 daily traffic. A second access will be required if the number of lots accessing onto 28"' Ave S exceed 25 lots or 250 daily traffic. 3. Verify sight distance for proposed lot 21 through 26 at site access onto internal road. 4. Driveways serving a single family dwelling unit abutting two streets should be at least 25 feet from the beginning of the street radius. 5. Submit an intersection sight distance analysis for the design vehicle used at the plat access driveway/intersection with 28t" Avenue S. The analysis shall be conducted in accordance to the latest AASHTO guidelines. The analysis must bear the seal of a licensed engineer in the state of Washington. The sight distance triangle shall be depicted on the plan set. 6. Please provide photo documentation within the appendix of the sight distance analysis. A minimum of one photo looking to the left and one looking to the right will show the location of the viewer in accordance to AASHTO guidelines. The Site Plan with plan and profile sheets should also be incorporated into the report to provide the site distance documentation. Indicate if there are any street trees, landscaping requirements, or any other objects existing or proposed to be within the sight distance triangle. State if the sight distance requirements are met or not and provide any traffic safety mitigation measures. Block perimeters shall be no longer than 1,320 feet for non -motorized trips, and 2,640 feet for streets (FWRC 18.55.010 and FWCP Policy TP4.2). Therefore, an east/west connection between 28"' Ave S and Military Road S is required. However, due to the presence of existing surrounding developments including limited access for SR 5/Military Road S bridge, it appears only pedestrian connection is feasible. Therefore, the applicant may submit a request to the Public Works Director to modify or waive this requirement. 18-103329-00-PC Doc ID:78122 Mr. Davis September 14, 2018 Page 11 8. No street, or combination of streets, shall function as a cul-de-sac longer than 600 feet (FWRC 18.55.010). 9. Traffic calming devices such as speed humps, traffic circles, chicanes, etc. should be incorporated in the residential street design to control speed and any potential cut -through traffic. COMMUNITY DEVELOPMENT — BUILDING DIVISION Scott Sproul, 253-835-2633, scott.sproul@cityoffederalway.com No Building Department comments at this time. Building permits will be required when the lots are determined buildable. The information provided is based on limited plans and information. The comments provided are not intended to be a complete plan review and further comments are possible at time of building permit plan review. LAKEHAVEN WATER AND SEWER DISTRICT Brian Asbury, 253-946-5407, BAsbury@lakehaven.org Water ■ A Water Certificate of Availability issued separately by Lakehaven may be required to be submitted with any land use and/or building permit applications (check with land use agency for requirement). Certificate is valid for one (1) year from date of issuance. If Certificate is needed, allow 1-2 work days to issue for typical processing. 2018 cost for a Water Certificate of Availability is $60.00. • Fire Flow at no less than 20 psi available within the existing water distribution system is over 1,000 GPM for two (2) hours or more. This flow figure represents Lakehaven's adopted minimum level of service goals for residential areas regarding performance of the existing water distribution system under high demand conditions. If more precise available fire flow figures are required or desired, Applicant can request Lakehaven perform a system hydraulic model analysis (separate from, or concurrent with, an application for Availability). 2018 cost for a system hydraulic model analysis is $220.00. ■ If a BLA is proposed, Lakehaven would have no comments on this application/project, as no existing and/or future Lakehaven water/sewer system facilities would be be required, desired, or affected by just a BLA for these properties. If any water utility conflicts are encountered, applicant should promptly contact Lakehaven for additional information. ■ The site has three (3) existing water service connections: SvcNo 8894 (0921049183), SvcNo. 8895 (0921049182) & SvcNo 8896 (0921049096). ■ For a proposed subdivision, a Lakehaven Developer Extension (DE) Agreement will be required to construct new water distribution system facilities for the proposed development. Additional detail and/or design requirements can be obtained from Lakehaven by completing & submitting a separate application to Lakehaven for either a Developer Pre -Design Meeting or a DE Agreement. Lakehaven encourages 18-103329-00-PC Doc ID:78122 Mr. Davis September 14, 2018 Page 12 owners/developers/applicants to apply for Lakehaven processes separately to Lakehaven, and sufficiently early in the pre-design/planning phase to avoid delays in overall project development. ■ A water service connection application submitted separately to Lakehaven is required for each new service connection to the water distribution system, or any modification to an existing water service connection (e.g., larger meter/service, irrigation, abandonment of existing service(s), re -activation, etc.), in accordance with standards defined in Lakehaven's current `Fees and Charges Resolution' • The associated DE Agreement must achieve a point of either Substantial Completion or Acceptance, as determined by Lakehaven, prior to activating any new domestic or irrigation water service connection(s). Based on the subdivision proposal submitted, preliminary estimated Lakehaven water service connection fees/charges/deposits (2018 schedule) will be as follows. Actual connection charges will be determined upon submittal of service connection application(s) to Lakehaven. Connection charges are separate from any DE fees/charges/deposits & are due at the time of application for service. All Lakehaven fees, charges and deposits are typically reviewed & adjusted (if necessary) annually, and are subject to change without notice. o Water Service/Meter Installation, 1" preliminary size, per lot: $531.16 drop -in meter fee. Actual size TBD by Lakehaven based on UPC plumbing fixture count. o Capital Facilities Charge(s)-Water: $4,018.39 per Equivalent Residential Unit (ERU). Water system capacity credits are available for this property from system capacity charges previously assessed, paid directly to Lakehaven, and/or credited to the property for 4.00 ERU. Please contact Lakehaven for further detail. Sewer ■ A Sewer Certificate of Availability issued separately by Lakehaven may be required to be submitted with any land use and/or building permit applications (check with land use agency for requirement). Certificate is valid for one (1) year from date of issuance. If Certificate is needed, allow 1-2 work days to issue for typical processing. 2018 cost for a Sewer Certificate of Availability is $60.00. A Lakehaven Developer Extension (DE) Agreement will be required to construct new sanitary sewer system facilities necessary for the proposed development, including extend -to -far -edge (SW) in accordance with long-standing Lakehaven policy. Additional detail and/or design requirements can be obtained from Lakehaven by completing & submitting a separate application to Lakehaven for either a Developer Pre -Design Meeting or a Developer Extension Agreement. Lakehaven encourages owners/developers/applicants to apply for Lakehaven processes separately to Lakehaven, and sufficiently early in the pre-design/planning phase to avoid delays in overall project development. ■ The site does not have any existing sewer service connections. • A separate Lakehaven Sewer Service Connection Permit is required for each new connection to the sanitary sewer system, in accordance with standards defined in Lakehaven's current `Fees and Charges Resolution'. Minimum pipe slope for gravity sewer service connections is 2%. • The associated DE Agreement must achieve a point of either Substantial Completion or Acceptance, as determined by Lakehaven, prior to activating any new sewer service connection(s� 18-103329-00-PC Doc ID:78122 W Mr. Davis September 14, 2018 Page 13 Based on the subdivision proposal submitted, preliminary estimated Lakehaven sewer service connection fees/charges/deposits (2018 schedule) will be as follows. Actual connection charges will be determined upon submittal of service connection application(s) to Lakehaven. Connection charges are separate from any DE fees/charges/deposits & are due at the time of application for service. All Lakehaven fees, charges and deposits are typically reviewed & adjusted (if necessary) annually, and are subject to change without notice. o Sewer Service Connection Permit, per lot: $303.52 fee. o Capital Facilities Charge(s)-Water: $3,803.76 per Equivalent Residential Unit (ERU). General 0 All Lakehaven Development Engineering related application forms, and associated standards information, can be accessed at Lakehaven's Development Engineering web pages (!=://www.lakeliaven.org/204/Development-Enginceiring). • All comments herein are valid for one (1) year and are based on the proposal(s) submitted and Lakehaven's current regulations and policies. Any change to either the development proposal(s) or Lakehaven's regulations and policies may affect the above comments accordingly. SOUTH KING FIRE AND RESCUE Chris Cahan, 253-946-7243, Chris Cahan@southkingfire.org Water Supply Fire Flow A Certificate of Water Availability shall be requested from the water district and provided at the time of building permit application. Fire Hydrants This project will require 2 additional fire hydrants in approved locations. Fire hydrants shall be in service prior to and during the time of construction. Emergency Access Fire apparatus access roads shall comply with all requirements of Fire Access Policy 10.006 http:/fsotithkingfire.orpiDocum entCenter/HomeNiew/24 Fire apparatus access roads shall be installed and made serviceable prior to and during the time of construction. Access to homes on lots 12 and 18 may be substandard depending on placement of building on lot and width of the driveway. *Determination of requirements for residential fire sprinklers, if any, are made at the time of building permit application. 18-103329-00-PC Doc ID:78122 Mr. Davis September 14, 2018 Page 14 CLOSING This letter reflects the information provided at the preapplication meeting and is intended to assist you in preparing plans and materials for formal application. We hope you found the comments useful to your project. We have made every effort to identify major issues to eliminate surprises during the City's review of the formal application. The completion of the preapplication process in the content of this letter does not vest any future project application. Comments in this letter are only valid for one year as per FWRC 19.40.070 (4). As you know, this is a preliminary review only and does not take the place of the full review that will follow submission of a formal application. Comments provided in this letter are based on preapplication materials submitted. Modifications and revisions to the project as presented for this preapplication may influence and modify information regarding development requirements outlined above. In addition to this preapplication letter, please examine the complete FWRC and other relevant codes carefully. Requirements that are found in the codes that are not addressed in this letter are still required for your project. If you have questions about an individual comment, please contact the appropriate department representative noted above. Any general questions can be directed towards me, the key project contact, Rebecca Chapin, at 253-835-2641, becky.chapin@cityoffederalway.com. We look forward to working with you. Sincerely, Becky Cha n Senior Planner enc: Master Land Use Application Preliminary Plat handout Boundary Line Adjustment handout SEPA checklist Forest Practice Application Mailing Label handout Concurrency Application Lakehaven Map c: Lou Larsen, Pacific Engineering Design, LLC, llarsen@paceng.com Ann Dower, Senior Engineering Plans Reviewer Sarady Long, Senior Transportation Planning Engineer Chris Cahan, South King Fire & Rescue, via email Brian Asbury, Lakehaven Water & Sewer District, via email 18-103329-00-PC Doc ID:78122 _11;k CITY OF Federal 1►lilay August 30, 2018 9:00 a.m. Pre -application Conference Sign in Sheet COMMUNITY DEVELOPMENT REVIEW COMMITTEE Project Name: Steel Lake Crest Address: 30642 28th Avenue South File Number: 18-103329-00-PC City Hall Hvlebos Room NAME DEPARTMENT / DIVISION TELEPHONE NUMBER/EMAIL EeG% (ihx p(h (an fli rj 253-'8 3S - 26 y / .aWCA d)C,'jyW-�eW_-M". corK 1. 2. ` I� s o n r, , do-L,� 3. .GL L �. DA pv� � - (_Q S I exv - c� V9(&,l " 5. gU9f A-WCoP_ C - 515uxy r�1 . 6. / l �'S C�"�T-t�+a ': I�'ic�.� �t��t. G•..GJ sor-F�. �•- it... ur 7. (,� — di Je eock-ri v eAc _0" -• !017- 99 55 8. L to� c(eneht5 130Ck &✓CY Horne' Lucas rockr'i✓er'*0 core 9. ham/ `-� � " SO► 10. -1 - Aso f568-� &4A iv 11. fil 19E@ II _p�� � Le.-,L 12. pa5 ' Im e'e 8/15/2018 Map Map 309-1i p~p , 9150 I +� 092 0- 9063 CV 6 30425 M. G4 9080 092104 9327 092104 9220 100 1i BN 30511 " 40 11 ' 11 10 132 000G .1 092104 91R 30445 —1 N 9d51 0921C OOK _Q f- 092104 92G _30511 .04 9260 Z w i104 9072 0 n 30527 w 30459 30606 092104 9100 30535 092104 9168 1041 9275 !4�104 9202 30605 092104 9244 30609 1049263 30614 092104 9096 30617 30,1 ; 30619 R S 7 r 1 A 922. ,P 30623 30625 092104 9211 0921009182 30642 30631 30637 092104 9191 .10646 30643 092104 9180 30645 092104 9183 30641 092104 923 1104 9161 RS7.2 co 56 ]9;l11.- 9230 � � 092104 °234 Q 30802 092104 9251 092104 9243 30815 30809 00 092104 9138 092104 9311 092104 9222 30808 2834 2808 092104 931 S 308TH LN 2840 11 _ 798440 0010 0020798440 0015 2640 2612 6 12 2620 2628 98440-00 092104 9313 2839 04 9078 2808 092104 931`_ 30812 2833 S 309TH ST 092104 9314 798440 003 n RS7.219 30903 fl 30902 2627 092104 9084 603 `9a440 0055798440 0050 092104 9329 :n.3+ 00G5 a r40 0060 11 STEEL LAKE flI! RRACE ADD 7-8440 n04 30922 0.0 uO 2 Miles 0- +9440 0080798440 0070 30915 II 092104 9239 30980 Address Candidates Parcels Site Address Federal Way Zoning Boundary .0 City Limits SEPA Planned Action Area Boundary Subdivisions King County Zoning Boundary Federal Way Stream Classification Points Lakes ON Wetlands (1998 City Survey) Streams Buildings http://cfwgisweb/aspnet_cl ient/ESRI/W ebAD F/Pri ntTaskLayoutTemp lates/d efault. htm 100 Year Floodplains Wellhead Protection Zones fp�� 6 Months C31 Year C35 Year 010 year Landslide Hazard Areas 0 Erosion Hazard Area Puget Sound 1/2 8/15/2018 Shoreline Designations - Federal Way ❑ Streets Map Shoreline Designations - King County EI http://cfwgisweblaspnet_client/ESRIlWebADF/PrintTaskLayoutTemplatesldefault.htm 2/2 AECEIVED Pre -Application Narrative JUL 2 7 2018 For gym' FED Steel Lake Crest �rr��.°�F o , NT 30642 — 28' Avenue S — Federal Way, WA 98003 (Parcels # 092104-9182, 9183, 9096 & 9161) Applicant: Rock River Homes, LLC 19655 - lst Avenue S., Suite 204 Normandy Park, WA 98166 Contact: Mike Davis rukA,", 206-948-9997 mike(cr�,rockrivernw.com Engineer: ' Pacific Engineering Design, LLC 15445 53rd Avenue S, Suite 100 Seattle, WA 98188 Contact: Lou Larsen 206-431-7970 llarsen@paceng.com This application is a new proposal to develop the parcels previously submitted and reviewed by the City of Federal Way under permit # 15-105805-00-AD. That proposal was originally submitted as a 29-lot plat on 6.72 acres. The project was granted preliminary approval on April 9, 2009. A 2-year extension was requested by the previous applicant (Steel Lake Plat Group) and granted by the City of Federal Way on January 26, 2016. That extension expired on April 9, 2018. _ @pry61► 282C7 - )-IuS30�3 AD This application is intended to use as much as the previous layout / design as possible, with the only main difference being this applicant's desire to keep the three existing homes along 28th Avenue S. intact and on their own reduced parcels. Based on the attached conceptual lot layout, that would result in a reduction of total lots from 29 lots to approximately 27 lots (26 Single - Family Lots / 1 Stormwater Tract) for the 6.72-acre site. Based on preliminary research of Federal Way Municipal Code, the zoning is still RS 7.2 High - Density, Single -Family Residential (7,200 square foot minimum lot size) and would still require that interior roadways provide a minimum 52-foot right-of-way based on Average Daily Trips generated by the proposed plat (assuming an ADT value of between 100-250). Per the attached conceptual lot layout, proposed lots under this application would range in size from 7,200 square feet to approximately 18,130 square feet. General utility infrastructure, frontage improvements, right-of-way dedications are anticipated to be otherwise, similar to the previous application. Water and sewer extensions (under Developer Extension Agreements) will be required as before, through Lakehaven Water & Sewer District. Storm drainage will be similar to what was previously proposed. Storm runoff will be collected via catch -basins / area drains and routed to the Stormwater Tract shown on the conceptual lot layout. Facilities there will consist of either a pond, tank or vault for detention along with facilities to provide water quality treatment. Discharge will be to the existing storm drainage system in Military Road to the east of the site. Proposed landscaping is anticipated to be consistent with single-family residential neighborhoods under current city guidelines. No perimeter buffers are proposed beyond landscaping and building setback requirements. Questions / Topics we'd like to discuss at the pre -Up: '�nq(.O 7 1. The existing house on the northerly most parcel (parcel #092104_91-8-�appears to be approximately 9-10 feet off the existing right-of-way. With an anticipated 9-foot dedication along 28th Avenue, can the city foresee a way to save this existing house as it exists today? 114 0 2. Since there are 4 existing tax lots, we are anticipating that the existing houses could stay on their existing reduced -size parcels via a BLA process. 3. Under the BLA process, would these reduced -size parcels be subject to the 9-foot dedication? 4. A concurrency application requirement was mentioned in the January 26, 2016 extension letter. Will need to discuss this item during the pre-app. 5. Review storm water requirements for the project (vesting under which manual). 6. Projected timeframes for preliminary plat approval, construction drawing approval. 7. Current Fee Schedule 8. Traffic, Parks, School Impact fees? 9. Current Tree regulations (Arborist Report required?) %Y 11 r a ^i is top � ' rlww ea •- - a - . - ..,.n..:... f4c ann►a. �a t `• •�;r ,� ,.. `ate' .. "v+' �� _ wr .iwa. WV STEEL LAKE -. _.^.._.., — -- —i—r�am Er, i,- 4 -ilk ,. ., - . u r• � •ia �aL ra � �':.�.:'fir �a �a� era � ,[ � ."}� �'- � ',. �� .. � P Jiilti .7 -. - .a^k .7AXW iJ� r • _ CITY OF Y. Federal Way Centered on Opportunity August 2, 2018 Mike Davis River Rock Homes, LLC 19655 1" Avenue South, Suite 204 Normandy Park, WA 98166 mike@rockrivernw.com RE: File #18-103329-00-PC; PREAPPLICATION CONFERENCE SCHEDULED Steel Lake Crest, 30642 281h Avenue South, Federal Way Dear Mr. Davis: FiLE CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com Jim Ferrell, Mayor The Community Development Department is in receipt of your preapplication conference request. The application has been routed to members of the Development Review Committee (DRC) and a meeting with the project applicant has been scheduled as follows: 9:00 a.m. — Thursday, August 30, 2018 Hylebos Conference Room Federal Way City Hall, 2❑d Floor 33325 81h Avenue South Federal Way, WA 98003 We look forward to meeting with you. Please coordinate directly with anyone else you would like to attend the meeting as this will be the only notice sent by the department. If you have any questions regarding the meeting, please contact me at becky.chapin@cityoffederalway.com, or 253-835-2641. Sincerely, Becky Ch in Asoat nner c: Lou Larsen, Pacific Engineering Design, LLC, Ilarsen@paceng.com Doc, I.D. 78117 CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT DEPARTMENT DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: TO: FROM: FOR DRCMTG. ON.• FILE NUMBER(s): RELATED FILE NOS.: PROJECT NAME: PROJECT ADDRESS ZONING DISTRICT. - August 2, 2018 Cole Elliott, Development Services Manager Scott Sproul, Building Official Rick Perez, City Traffic Engineer Brian Asbury, Lakehaven Water & Sewer District Chris Cahan, South King Fire & Rescue Becky Chapin, Senior Planner August 16, 2018 - Internal August 30, 2018, 9:00am - with applicant** **Note I skipped a week between the internal and w/applicant meetings since I will be out the week of Aug. 20`h. 18-103329-00-PC None Steel Lake Crest Subdivision 30642 28`h Ave South RS 7.2 PROJECT DESCRIPTION. Proposed 29 lot subdivision from 3 existing lots totaling LAND USE PERMITS; Preliminary Plat and SEPA PROJECT CONTACT.• MATERMLS SUBMITTED: Rock River Homes Attn: Mike Davis mike@rockrivernw.com Pacific Engineering Design, LLC Attn: Lou Larsen llarsen@paceng.com • Master Land Use Application • Project Narrative ■ Conceptual Lot Layout CITY OF Federal Way JUL 2 7 2018 COC'ry OF FE SpAL Why EVSLOPMF�_ MASTER LAND USE APPLICATION DEPARTMENT OF COMMUNITY DEVELOPMENT 33325 8`h Avenue South Federal Way, WA 98003-6325 253-835-2667;Fax 253-835-2609. www.cityoffederalwny.com APPLICATION NO(S) 1 �J tT � v t — L- v - TCDate Project Name Steel Lake Crest Property Address/Location 30642 2 8 th Ave. S Parcel Number(s) 0 9 210 4- 918 2, 9183, 9 0 9 6 & 9161 Project Description PY MA.W. PRINT See attached Pre -Application Narrative Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment _ Comp Plan/Rezone Land Surface Modification Lot Line Elimination X Preapplication Conference _ Process I (Director's Approval) Process H (Site Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision X Subdivision Variance: Commercial/Residential Required Information R57 .2 Zoning Designation RS 7.2 Comprehensive Plan Designation $1, 2 6 0, 0 0 0 Value of Existing Improvements $15 , 6 5 0, 0 0 0 Value of Proposed Improvements International Building Code (IBC): Residential Occupancy Type Construction Type Applicant Name: Rock River Homes LLC Attn: Mike Davis Address:19655 1st Ave. S Ste 204 City/State: Normandy Park, WA Zip: 98166 Phone:206-948-9997 Fax: Email: mike@rockrivernw.com Signature: Agent (if different than AppfcaAt) Name: Pacific Engineering Design, Address: PO Box 24060 City/State: Federal Way, WA Zip: 98093-1060 Phone:206-431-7970 Fax: Email: llarsen@paceng.corn Signature: Owner Name: please see attached list Address: City/State: Zip: Phone: Fax: Email: Signature: LLC Attn: Lou Larsen Bulletin #003 - January 1, 2011 Page 1 of 1 k:\Handouts\Master Land Use Application . 1 . Property Owners 0921049161- Michael and Gloria Trinidad 30646 28TH AVE S FEDERAL WAY WA 98003 0921049183- Michael M Trinidad 30646 28TH AVE S FEDERAL WAY WA 98063 0921049182- Verlin J & Linda J Elder PO BOX 3991 FEDERAL WAY WA 98063 0921049096- Allan Woida 30614 28TH AVE S FEDERAL WAY WA 98003 RAJ - 4J6.46 E 18' CONC W-43U6 IE 18' CWMMO*VC IE 12' PVC E-43M6. Of - 44L68 E 12' PVC N-438A AE Ir PVC S-45&9 E 12* PVC W--456.1 -Speed Limit Can ------------------- fiN K 12* PVC N--MI.3 E 12'PW =L2 S-44 EL AT 8011711111- U ap � �� � � • I - �Xt�-rt � _ ��a� Locvinot4 (-rrfp) RIM - 446.35 I I T Er 12* PVC N=444 4 E 12* PVC �4"J EL AT BOTTOM-446.2 43178 RM 4a74 \0E 116'CPP 4R9.2 a !r E W CO1VCN-441.7 E 12* CONC SE=4441 I MB)( R/W44&65 18" fir PVC N-446. Ir 12 15" fir fir 1, 52 6' chain link fence IE S-4M.5 06 12 ( 6' Chain Link 1E, 2: CCDO*VVCC SXF-44&J 20" pine N 81-55 $191, W . . ...... . ...... 11:_ -\582-28' :101 - ­ __­_� .1-.11. -, 11 . i 4 16 L IL & 12" 11�30" fir --- 2' 26_�� 24" fi, ap in Maples 6a %M 3' Ce Aciple Q 26" aple 20 Alder �2* C N 'as 1/. nerved hotel Map- Ve r _49- 2 �tl% v V1 77 Elev.= V_0"TNI 3!' \L 0 C 1-5 omposs VEMCP\L CUP-15i MIT:91 #30614 X IMF 1 1 -1A lk ju x 30 M a le clump I Ion f, ` V.._. -- r—`t T NIL uR Cv_tlreeu�3E rmw Eomss� ii rana `-.,` �'•\\ s � ( { `,--.,y ` \.•` "••-_.,,, � � •\ J TS. 5" Fir` , Maple Cluster "Cedar Mable6 Fir IM IDItr 15-Ftq N 8 T5 3. v Cana. Tra Sign 2' IE-417.7 Fir 12" Fir 7, 12" Alder 072.4 18, 11 Ito v nmwftl� 25' Fir W- 4 7� 1' 1 5 Fir it Fir 33- Fir 24' Fir 8 5* Alder - - *-3, -__I \Fir, ZZ 23" Fir Cedar 15" Aldej:4 'D ;up 9' Fir Q`11 A a eda 13" Alder 4"Fir ""VV r j, r :lu 14 edar Maple 4" it :ZO" Fir Fir A, 0" Fir 1C Fir 815 82 )16" M PI \ 21' Fir E-476. de \14- Aid 16" Alder U ove —15- Sol Fir star 23" Fir U 23" Fir 17' Alder 3 14" Alder 6" Fir\ E-47&7 to I 3 Fir 21"i!de, 26" Fr Alder 6"Firci \ -T�� �W__ 40 it W ir 33" A '\\ 7' Fir 4o 21 "Fir '\ 019• 0 11" Al de Lower Flo a 37- Twin F\i 7319' Fir 48 • !Elev.= 479.5 Alder 25" Fir 13 Fir 0 -�,, - I Ceda #30642 19" Alder , 11 1 1 ) . *,216�*,30 Twin' der 28' V�\\,28 Twin Al 'U,21" Alder _Q Pool Alder 8 Alde'r\,\ 4" Fir a Cluster-,,, 11_�, "I - """ 11 Alders cc? g " i. i 23 it IATO , I �11 !) I - __"­ I A I , - 1— *219" Fir A) .CaP.� 1 9 Alder 15" Alde�' 19" Twin Alders a" ' i I - lrl�_ 23 der L Id Bare Id 8 0' 1?" Al Alder Cluster Qj�kwplf Aldel,\ der 596.6 Main Floor I' Fir N, z der "1 3 it -,7 Elev.= 4911 Conc. 3' wood 12" der 1\ N, E-485 4 IP Jl! I A]d Ty" *_F:iv_ - FENVIMMMEWMLIC C?.%T1CP4_ Tteeus Qoor 29* Fir 19" Maple Lower Wire Fence a Alder Maple'` Pine El�-= 482.5 _40-400AF, 8" Al \ I " 112-41der 6" Fir 28" Mopler \18" Me 1. V Maple _00 ., \ -\( I I Alder 41" Fir 45 Maple 24" Fir 00 T, Aid IN,, #306,46 M001 us Wood Tt?E or 10 Pine M -7 x Fir 490 W= .7 - — — - - - - - pf 18 Metal Gate I - IE-48& i C. i I., Metal Gate �_�20 Fir 17' — — — — — — Grclvel C Cluster 3.5 Fir3" Maple WEI- wo—od 6 21" Pine X Aj W N k kv 31 88-02'3' Alder 131"36" Ma as Ile Fir i I 14" Fir \ \ �\ ,\ \ 6" MOPI omicwto t F7 't L 1K \_1 1 *,14* Maples ot NW Metal Gate 5 Fir a 36* Twin les _Sf_�O \B Fi• .52 1`1 .40 23" Fir 2 fOlderq T"',%D F Twin Maples 38" Fir 17 Alder Barn Maple Cluster ` \\ � u _ �� C2 J���C1- L�J / �ey��� � �c� , 36 lople Fir 36" Fir 14" 23" Alder Birch A �r Cluster I ­, A Cluster 35" Fir 15" 62. k-, \ 1— r\j \4' Chain Link,, 32" Maple 5 8\13 4' 1 roken Barbed Wire 1___1 Maple N 88*02'39"'W a 14" Map SI I � 10i; ,,� a. M 'a 0.1 ie M le 1-1- At er 2* Conn `�s t E-49& 17" Alder aple 1 21 M \ \ 'irO _ • V�Uy L�T"RwD���—�(Y! jj -49.1 C3 IOU 24" Maple 23* Twinoples II 28" Maple 19` Maple 23- Fir 17" Alder 28* Alder 14" Maple 20. _ 20* aple AE 16' Alder' . . I Cedar I \ T\ 0 23" Maple 5T u\ 13" Alder Ile I Alder �6 ! I ; COtICEPTUAL LOT LAYOUT RECEIVED I ' ia� ,,� 'R AR _�iY� MCIFIC _MG1HttR1T1q­rM Qtt LIC JUL 2 7 2010 'N Ilk AFFLICART : MOCK MAIM HOM51 LIC MY OF FEDERAL WAY ow COMMUNITY DEVELOPMENT i ;a E M 0.