Loading...
06-100630-PCA'VkCITY OF � Fe d e ra l 11'�la CITY 33325 8th 8th Avanue South Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www citYoff, d,,alway com Ms. Lisa Klein, Project Manager AHBL March 9, 2006 2215 North 30t' Street Tacoma, WA 98503-3350wa ' Re: File No. 06-100630-00-PC; PREAppI,ICATION CONFERENCE SUMMARY South Fork Condos; 31408 29'' Avenue South, Federal Way Dear Ms. Klein: Thank you for participating in the preapplication conference with Review Committee (DRC) held March 2, 2006. We hope that the infoaTimthe City of Federal Way's Developmentation discussed at that me ettng was helpful in understanding the general requirements for your project as submitted. This letter summarizes comments given to you at the meetingh Who reviewed your project and provided comments include staff from the City's Plannin and m Y the members of the DRC. The members Divisions and Public Works Department, and representatives from Lakehaven Utility District and King Fire and Rescue. Some sections of the Federal Way City Code (FWCC and relevant g Building handouts are enclosed with this letter. Please 6e advised, this letter does not represent South eall applicable information codes. In preparing your formal application, please refer to the complete FWCC and other elva t for all additional requirements that may apply to your project, relevant codes The key contact for your project is Senior PIanner Lori Michaelson, A1CP, (253-835-2645, or lori.michaelson ci offederalwa .cone . For specific technical questions about your.pro ect le contact the appropriate DRC representative as listed below. Otherwise, an 1 , please preapplication and permitting process can be referred to your key contact.Y general questions about the PROJECT DESCRIPTION The proposal is to construct a 26-unit condolmultifamily development vn a 1.69-acre site comprised two separate tax parcels #092104-9148 and #092104-9142). The site is designated "Multifamil Residential-2400 P ed of " [R.M 2400) by the Federal Way Zoning Map. t representatives stated In addition, Project at the DRC meeting that no subdivision of land is proposed wi#h subdivision process will apply to the condominium project. the application. ec this case, no MAJOR ISSUES Outlined below is a summary of the major issues of Your project based on the plans and information submitted for preapplication review. These issues can change due to mod,flcations and revisions on Plans. These cm1ud r issues only represent comments that the DRC consider most significant to o m the and do not include the majority of the comments provided. The major Issues section is only Provided means to highlight critical requirements or issues. Please be sure to read the entire department Your project made in the next section of this letter. In d as a eP�ment comments Ms. Lisa Klein Page 2 March 9, 2006 Planning Division site lan will be impacted by required street frontage improvements and related right-of- 1. The p way dedication (see Public Works comments, below.) s located in 2. A small portion of the east/West drive aisle, at its relocated, unlessly terminus, a landscape;modifications a required landscape buffer and museby City under the applicable code provisions. requested by the applicant and approved 3. The site plan appears to Provide considerably less recreational open space than required by code. Based on 26 dwelling units, 10,400 square feet �recreational eopen space is required, and the site plan appears to provide approximately 3,0 to 4, The project will establish residential uses nu,a ion measterstate-5 (1-5). "is creates a noise ures could include noise insulation impact that must be addressed. Sound attenuation An acoustical engineer s and/or a sound wall along 1-5, such as thoseeshould constructed by e within dwelling unit Washington State andarecommendations to address ss noise impacts. review the project provide Pursuant to the City's design guidelines, significant tree(s) that are located within a 20-font 5 perimeter of the site must be retained, or alternatively, replaced, within required Perimeter buffer areas. t line. No structure can be built over or in a required setback If so existing e exi t ng lot line must be ased on the 6' ears this would be the c preliminary site plan, it appears eliminated or relocated prior to issuance of a building permit. Public Works Development Services Division 1. Flow Control (detention) and water quality facilities are required for the site (see additional department comments) need 2. Existing overhead utilities, affected by the required street frontage improvements, may to be re -located underground, if 500-feet and/or three spans are affected. licant e location for storm drainage is towards I-5. The app 3. It appears that the natural discharge permitting requirements. shall coordinate with W SDOT on submittal and p 4. The site plans must accurately depict the 1-5 right-of-way line and its associated landscape (beautification) easement. Public Works Traffic Division future Transportation Improvement Project 1. The City has a conceptual layout of a proposed sist the applicant, the Traffic Division (TIP) in the vicinity of this parcel. In order to asd ths's 50-foot requests the state's limited access right-of-waane tateeasement be shown on the plan as it relates to the parcel development - Doe Fik N06-100630-00-PC Ms. Lisa Klein Page 3 March 9, 2006 2. Frontage improvements and right of way is required on 28 b Avenue South. Right-of-way dedication is expected to be nine -feet, which impacts the site layout. 3. A Transportation Impact Analysis (TIA) is required. The project is expected to impact at least two TIP projects where pro-rata share contributions will be warranted in lieu of construction the projects. Project 24: S 312a' St @ 28`' Ave S Projected Total Cost: $124;000 Project IA, 1B, and 1C.• City Center Access Project Projected Total Cost: $16,400,000 ■ Building Division 1. Sprinkler system is required. 2. Accessible access to each floor of the dwelling units. DEPARTMENT COMMENTS Outlined below are the comments made by the representatives of each department present at the preapplication conference. Each section should be read thoroughly. If you have questions, please contact the representative listed for that section. PLANNING DIVISION (Lori Michaelson, 253-835-2545, loci-niiehaelson(cDcityoffe(lerahvay.com) Land Use, Environmental Review, and Related Permits — Under FWCC Chapter 22, "Zoning," the proposed multifamily project is a permitted use in the RM-2400 zoning district,' subject to a Process II review. The project is also subject to environmental review under SEPA. Projects subject to Process II and environmental review are processed using the procedural requirements of Process III.z Therefore, the project as proposed will be subject to Process III Review.3 2. State Environmental Policy Act (SEPA) — The project is subject to environmental review under the SEPA. A completed SEPA checklist and SEPA application fee must be submitted along with the Process III application. Based on the proposal, planning staff has identified that a noise analysis and related mitigation must be addressed in the SEPA checklist, but no critical areas4 requiring specialized studies were identified. In addition, as noted under Traffic Division comments (below), a Traffic Impact Analysis (TIA) will be required for the project and this is reviewed under SEPA. 3. Land Use Application Fees — The following fees will apply to the proposal using the 2006 fee schedule. Please note, other fees for building permits, and Public Works review and inspections, will apply to the project. 'FWCC Chapter 22, Article XI, Division 4, "Multifamily Residential" 'Per FWCC Chapter 22, Article V, "Site Plan Review -Process Il," any Process II application not categorically exempt from review under the State Environmental Policy Act shall be reviewed using the procedural requirements of Process III. 3 FWCC Chapter 22, Article VI, "Process III Review -Project Approval" 4 The City's critical areas maps do not show the site to be located on or within 200 feet of regulated "Critical Area," such as any wetland, stream, geologically hazardous area, or aquifer recharge area. File i106-100630-00-PC Doc 1D 35053 Ms. Lisa Klein Page 4 March 9, 2006 Process III: $ 2,129.00 SEPA (with project): 843.50 Total Due with Process III/SEPA Application: $ 2,972.50 4. Process III Application Submittal Requirements — Enclosed are a Process III development requirements checklist, master land use application, and applicable code sections. The application must address all applicable submittal requirements as noted in the checklist. Public Notice Requirements — The code requires issuance of public notice for the Process III application and the City's SEPA threshold determination. The City will publish, post, and mail such notices to adjacent property owners in accordance with City procedures. Accordingly, the application must include two sets of stamped envelopes, addressed to all owners of real property located within 300 feet of all site boundaries, as well as an assessor's map showing the mailing radius, and separate paper list of the addressees. Refer to the enclosed development requirements checklist for details. 6. Land Use Review Timeframes — The City makes every effort to issue land use decisions within 120 days of a complete application. However, the review timeframe is suspended at any time that additional information is requested by the City, and for 14 days following the applicant's submittal in response to such request(s). Throughout project review, the applicant will be kept informed in writing of the status of the 120-day clock. 7. Land Use Decisions, Appeals — The Director of Community Development Services issues the environmental and Process III decisions. The Federal Way Hearing Examiner would hear and decide an appeal of either or both decisions. Effect of Process III Decision — In accordance with code requirements, the applicant must begin construction or submit a complete building permit within one year of the Process III decision, or the decision is void. In addition, the applicant must substantially complete construction for the actions approved under the Process III decision within five years after the filial decision on the matter. Provisions for certain extensions of these timeframes are set forth in code.' 9. Construction Permit(s) — Building permit(s) are separate from land use review and are subject to their own fees and review process. A building permit can be submitted at any time. However, no building permit can be issued until the Process III and SEPA decisions, and their associated appeal periods, are complete, and any conditions of project approval are met. No clearing or grading may occur on site in advance of the required construction permit(s). 10. Demolition Permit, Fees — A demolition permit will be required to demolish the existing structures on the site. This permit may be applied for and the demolition completed at any time. Demolition of the existing improvements is not subject to environmental or land use review, unless demolition activities will occur on or within 200 feet of any critical area as identified and regulated by Federal Way, or any other governmental jurisdiction with authority. In such case, SEPA would have to be completed prior to any demolition activities. No critical areas have been identified at this time, 5 FWCC § 22-408, -409, "Time Extension" File 406-100630-00-PC Doe ID 35053 Ms. Lisa Klein Page 5 March 9, 2006 subject to verification with a formal application. Assuming no SEPA, the following demolition -only fees will apply: Demolition Permit Fee: $ 75.00 Demolition Cash Bond: 500.00 Total Due with Demolition Application: $ 575.00 11. Lot Line Elimination or Boundary Line Adjustment — As noted under "Major Issues" above, the existing interior lot lines must be eliminated or relocated as necessary to accommodate building setbacks from property lines. This may be applied for and accomplished at any time prior to or concurrent with the required land use applications. The current application fee for Lot Line Elimination is $158.00. The current application fee for Boundary Line Adjustment is $1,249.50. Enclosures on these processes are provided. 12. Outside Agency Permits — The applicant is responsible to identify and obtain any required permits or approvals from outside agencies having jurisdiction. For example, creation of condominiums is subject to review and approval by King County under the "Horizontal Regimes Act." 13. Covenants, Conditions, and Restrictions (CC&R's) — CC&R's for the condominium project must be submitted to the City for zoning compliance review prior to recording by the applicant/owner. 14. Key Development Regulations6 — All site improvements must comply with the applicable FWCC development regulations. The following general regulations will apply to the proposal, with more particular standards noted where appropriate. Required building setbacks for the project include a front yard setback of 20 feet (along 28`h Avenue South) and side and rear yard setbacks of five feet (along all other property lines). The front yard setback as shown on the preliminary site plan will be affected by right-of-way dedication, and must be adjusted accordingly. Refer to Traffic Division comments (below) for right-of-way requirements. Also, see landscaping comments, below, for perimeter buffer requirements that apply to the project irrespective of building setbacks. Maximum building height is 30 feet above average building elevation (ABE), as defined by City code.7 Since the subject site is not located within 100 feet of a low -density zone, no additional height restrictions apply. The preliminary elevation drawings indicate a roof height at midline of 30 feet. The Process III application must indicate the height of each building on the site, using the code definition of ABE, for the City's review and verification. Maximum lot coverage for residential uses is 70 percent. Lot coverage includes all impervious surfaces such as driveways, walkways, patios, and roof overhangs. The formal application must identify all impervious surfaces and provide a corresponding lot coverage calculation. Lot coverage must be calculated after any public dedications, such as right-of-way. Density — The maximum number of dwelling units permitted on the site is based on the gross land area of the site after any required public dedications, such as right-of-way. The maximum density for the RM-2400 zone is one dwelling unit per 2,400 square feet of gross lot area (after 6 Refer to applicable portions of FWCC § 22-667 Use Zone Chart, "Attached, Detached, Stacked Dwelling Units" 7 "Average Building Elevation" is defined in FWCC § 22-1, "Definitions" Fileil06-100630-00-PC Doc ID 35053 Ms. Lisa Klein Page 6 March 9, 2006 right-of-way dedication). Based on the existing gross property area of 73,473 square feet, 31 dwelling units would be allowed,' and 26 units are proposed. However, the property area will be reduced by right-of-way dedication (see Traffic Division comments, below). The formal application must identify the dimensions and total area (in square feet) of the area to be dedicated, and provide density calculations based on the post -dedication net land area. Recreational Open Space — The formal application must include a detailed open space plan that complies with all applicable requirements. As noted under "Major Issues," above, the preliminary site plan appears to provide considerably less recreational open space than is required by code.9 The project must provide recreational open space usable for many activities, in a total amount that is equal to 400 square feet per dwelling unit. Based on 26 units, as proposed, 10,400 square feet of recreational open space would be required. The preliminary site plan appears to provide about 3,000 square feet. Recreational open space must be usable for many activities10 and must conform to the design and dimensional standards of the code. At least 10 percent of the total open space, or 1,040 square feet based on a total amount of 10,400 square feet, must be developed with children's play equipment, and must be in one or more pieces, each having a length and width of at least 25 feet. Through the Community Design Guidelines (see comments below), recreational open space must be located and arranged so that windows overlook them. The Parks Department reviewed the preliminary plan, and cautions against placing a basketball court adjacent to a public right-of-way (in this case, 28t' Avenue South), as this will tend to attract the public into a private recreational space. Also, as discussed at the meeting, certain portions of the paved turnaround could be considered usable open space, based upon a review of a formal application. Parking — The proposed multifamily development must provide a minimum of 1.7 parking spaces per dwelling unit. It appears that the project will meet and exceed this requirement by providing three parking spaces per unit, with two tandem spaces within the garage and a third space on the paved driveway. All parking spaces must be identified and dimensioned on the site plan." Site Slopes — The easterly portion of the site slopes downward toward I-5. Any area with a combination of slopes greater than 15 percent, permeable sediment, and springs or groundwater seepage, may be defined and regulated as a Geologically Hazardous Area.12 The formal application, and SEPA checklist, must address such area(s) as applicable. In addition, project design should generally follow the natural topography of the site through terracing, minimizing the need for tall retaining walls. 15. Landscaping — The Process III application must include a preliminary landscape plan, prepared by a licensed landscape architect, in accordance with the landscape code.13 Following are the key $ Actual number is 30.61 units, which is rounded to 31 units per FWCC § 22-961, "Rounding of Fractions of Dwelling Units." 9 FWCC § 22-667, Note 2 10 FWCC § 22-1, Definitions, "Common recreational open space usable for many activities means any area available to all of the residents of the subject property that is appropriate -for a variety of active and passive recreational activities (including activities suitable for all age groups), and is not: (1) covered by buildings or parking or driving areas, (2) covered by any vegetation that impedes access; or (3) on a slope that is too steep for recreational activities." 11 Refer to enclosed parking lot design chart. 12 "Geologically Hazardous Areas" include steep slopes, landslide hazards, and erosion hazards, as defined by FWCC Chapter 18, "Environmental Protection", and regulated by FWCC Chapter 22, Article XIV, "Critical Areas," Division 4, "Geologically Hazardous Areas Development." 13 FWCC Chapter 22, Article XV11, "Landscaping" File P06-100630-00-PC Doe ID 35053 Ms. Lisa Klein Page 7 March 9, 2006 landscape requirements for the project. Refer to the landscape code for a description of the types and amounts of plantings that must be included within a "Type III" landscape buffer.14 Perimeter Landscape Buffers 15 — Along 28`h Avenue South, a 20-foot wide strip of "Type III" landscaping must be provided. The preliminary site plan depicts sufficient area for this buffer. However, as noted under "Major Issues," above, this buffer will be reduced by right-of-way dedication and street frontage improvements (see Public Works comments, below) and must be adjusted accordingly. Along all remaining property lines, a 10-foot wide strip of Type III landscaping is required. The preliminary site plan provides the appropriate area for these buffers. In addition, in order to ensure and maximize visual buffering of I-5, most or the entire required 10-foot buffer adjacent to I-5 must be placed at the same grade as the adjacent residences. As noted under landscape modifications (below), perimeter landscape buffers and other landscape requirements may be modified pursuant to a written request that addresses the applicable modification criteria. • Interior Parking Lot Landscaping16 — Fifteen square feet of interior lot landscaping per parking stall must be incorporated into any common parking areas. However, based on the preliminary sit plan, this.regulation will not apply since no common parking is proposed. Landscape Modifications" — Any proposed landscape modifications will be reviewed and decided upon in conjunction with Process III. A request for a landscape modification must include a written narrative of how the proposal meets the applicable modification criteria. Significant Trees 8 — The site appears to contain a number of significant trees. The landscape plan must identify any significant trees on the property and how it meets the significant tree requirements. The landscape code has general and specific provisions for retention or replacement of trees on the site that meet the code definition of significant.19 Generally, all significant trees and vegetation should be retained to the maximum extent possible. Specifically,20 if more than 75 percent of the significant trees are to be removed, each tree (above 75 percent) must be replaced. In addition, pursuant to the City's Community Design Guidelines (below), any significant tree(s) located within a 20-foot perimeter of the site must be retained, or alternatively, replaced within required perimeter buffer areas. Surface Water Facilities — All conceptual surface water drainage facilities must be depicted on site, landscape, and civil plans. Such facilities must be designed and constructed in accordance with the King County Surface Water Design Manual (KCSWDM) and the City's engineering 14FWCC § 22-1565(c) 15FWCC § 22-1566(c)(3) 16FWCC § 22-1567(b)(1)(b), "Parking Lot Landscaping" 17FWCC § 22-1570, "Modification Options" 19FWCC § 22-1568, "Significant Trees" 19 "Significant trees," defined by FWCC § 22-1, are evergreen or deciduous trees that are 12 inches in diameter/caliper, or 37 inches in circumference, measured 4.5 feet above the ground, in good health, and not detrimental to the community (e.g., not diseased or dying, or likely of falling into public open space or right-of-way, etc) or obscuring safe sight distance requirements. Significant trees do not include red alder, cottonwood, poplar, or big leaf maple. 20 FWCC § 22-1568, "Significant Trees" File #06-100630-00-PC Doc ID 35053 Ms. Lisa Klein Page 8 March 9, 2006 standards. Refer to Public Works comments (below) for specific requirements. Surface water quality facilities may be incorporated into required landscaping provided the standards of the landscape code are met and the integrity of the surface water function is not compromised" Miscellaneous — The landscape plan must also depict landscaping around surface water facilities, rockery, and/or retaining walls, fences, trash enclosures, and ground -mounted mechanical equipment. In addition, street trees are a required element of street frontage improvements and must be shown on the Iandscape plan, as well as civil plans. Refer to Public Works comments (below) for specific street frontage improvements. Street trees shall comply with the City's Right -of -Way Vegetation Standards and Specifications Manual. 16. Community Design Guidelines 22— Review of the proposal under the City's design guidelines is required for the project and will occur in conjunction with the Process III decision. The guidelines that apply to multifamily residential projects are listed in FWCC. § 22-1638(d)(2) and § 22-1638(a)(5) through (a)(17). The principle applicable guidelines for the project are noted below. However, this does not necessarily include all applicable guidelines, and project designers must consult the guidelines in their entirety in preparing an application. The application must include a written narrative identifying how the proposal complies with the applicable design guidelines, as detailed in the FWCC and outlined below. ■ A six-foot wide pedestrian pathway must be provided between buildings on the site, and to the public sidewalk at 28`h Avenue South. The preliminary plan appears to meet this guideline. ■ As noted under "Major Issues," above, the maximum length of horizontal facades is 120 feet, and two or more building facades are treated as one facade when they are closer than 20 feet to each other (with exceptions for certain appurtenances). It appears that all three building "clusters" exceed 120 feet in length, with separations ranging from eight to 12 feet, which does not meet the 20-foot separation. This standard should be kept in mind in project re -design. ■ As noted under "Major Issues," above, any significant trees that are located within a 20-foot site perimeter must be retained, or alternatively, replaced within required perimeter buffers. ■ Crime Prevention Through Environmental Design — The formal application must also include a completed "Crime Prevention Through Environmental Design" (OPTED) checklist, pursuant to FWCC § 22-1632. 17. Additional Site Elements — The following other site elements, if proposed, must be shown on site and landscape plans, and civil and architectural drawings where appropriate: Garbage and Recycling — The new dwelling units must be provided with trash and recycling facilities as described in FWCC § 22-949. Contact Waste Management South to determine if the proposed units would be provided with individual curbside collection, or if a common trash collection area would be provided. If a common trash area is provided, the trash enclosure area (if applicable) may not be in required yards (setback areas), may not be located within 21 FWCC § 22-1570(g), "Modification Options" 22FWCC Chapter 22, Article XIX, "Community Design Guidelines" File #06-100630-00-PC Doc 11) 35053 Ms. Lisa Klein Page 9 March 9, 2006 landscape buffer areas, and must be screened according to the landscape chapter. A minimum of 1.5 square feet of recycling storage area per unit, with a minimum of 65 square feet, must be provided. Contact Waste Management South with any questions regarding trash facilities. Rockeries, Retaining Walls, and Fencing — If proposed, these must be shown on site and landscape plans, as well as on civil engineering plans. As noted above, the height of rockeries and retaining walls should be minimized by terracing where possible. Any fencing that is visible from a right-of-way must be architecturally treated and/or screened to improve aesthetics. Any chain link fencing visible from a right-of-way, if approved by the City, must at a minimum utilize vinyl -coated mesh and powder -coated poles. Outdoor Uses and Activities; Rooftop Appurtenances — Outdoor uses and activities (if any) must be shown on the site plan and must meet regulations specific to such uses23 Rooftop appurtenances such as vents, mechanical penthouses, elevator equipment, and similar appurtenances must be solidly screened.za 18. School Mitigation Fee —A school impact mitigation fee of $940.00 per each multi -family dwelling unit is required and must be paid prior to issuance of building permits. School mitigation fee schedules are adjusted annually. 19. Signage — A separate sign permit is required. According to the sign code ,25 the proposed multifamily development will be allowed one or two monument signs adjacent to the project entrance. However, a maximum 32 square foot sign face is permitted for the project. Therefore, one monument sign could have 32 square feet of sign face. For two signs, each sign face could not exceed 16 square feet. Contact Code Compliance .Officer Martin Nordby at 253-835-2631 to discuss permit requirements. 20. Upcoming Code Amendment — At the preapplication meeting, project proponents expressed an interest in following an upcoming proposed amendment to the zoning code dealing with "zero lot line" development. If you wish to be placed on the mailing list to receive future public notices regarding this code amendment, you can submit your request via email to Administrative Assistant E. Tina Piety at tina.piety cityoffederalway.com. PUBLIC WORKS DEVELOPMENT SERVICES DIVISION (Kevin Peterson, 253-835-2734, kevin.petersona,citvo#%deralwa)com} Land Use Issues — Stormwater 1. Surface water runoff control and water quality treatment will be required per the 1998 KCSWDM and the City of Federal Way Addendum to the 1998 KCSWDM. This project meets the requirements for a Full Drainage Review. At the time of land use site plan submittal, a preliminary Technical Information Report (TIR), addressing the relevance of the project to the eight core and five special requirements of the KCSWDM will be required. A Level 1 downstream analysis shall also be provided in the preliminary TIR. The City has 1" = 100', five-foot contour planimetric maps that may be used for basin analysis. 23 FWCC Chapter 22, Article XIII, Division 8, "Outdoor Activities and Storage" 24 FWCC § 22-960, "Rooftop Appurtenances, Required Screening" 25 FWCC Chapter 22, Article XVIII, "Signs," Table 2, "Sign Allowances for Residential Zones -Permit Required" File #06-100630-00-PC Doc ID 35053 Ms. Lisa Klein Page 10 March 9, 2006 2. The project lies within a Level 1 flow control area, thus the applicant must design the flow control facility to meet this performance criteria. The project also lies within a Basic Water Quality Area. Water quality treatment shall be designed to meet the treatment criteria of the Basic Water Quality Menu. If infiltration is proposed, a soil report prepared by a licensed geotechnical engineer must be provided to verify infiltration suitability. 4. Detention and water quality facilities for private commercial developments outside the City Center Core must be above ground (i.e. open pond.). Underground facilities are allowed only with approval from the City of Federal Way Stormwater Management Division. Show the proposed location and dimensions of the detention and water quality facilities on the preliminary plans. 6. If more than one acre will be disturbed during construction, a National Pollutant Discharge Elimination System (NPDES) permit may be required. Information regarding this permit can be obtained form the Washington State Department of Ecology at www.ggy.wa.goy+/progs-ams/sea/pacJindox.liuid, or by calling 360-407-6437. Right -of -Way Improvements See the Traffic Division comments from Senior Traffic Engineer Maryanne Zukowski for traffic related items. 2. Based on available records and the submitted materials, it appears that this proposal meets the 25 percent threshold criteria for requiring street frontage improvements as identified in FWCC § 22- 1473. The applicant/owner may submit an MAI appraisal for the subject property, or King County Assessor's records may be used. The Development Services Division will evaluate this data to determine if the project actually meets the City's 25 percent threshold for requiring street frontage improvements. If dedication of additional right-of-way is required to install street frontage improvements, the dedication shall be conveyed to the City through a statutory warranty deed. The dedicated area must have clear title prior to recording. 4. All stormwater treatment and detention requirements outlined above will be applied to new impervious area within the public right-of-way. FWCC § 16-47 requires that overhead utility lines be relocated underground if over 500 feet, or three spans are affected by a project. This condition may apply to 28"' Avenue South. Building Permit Issues Engineered plans are required for clearing, grading, road construction, and utility work. Plans must be reviewed and approved by the City. Engineering review fees are $730.00 for the first 12 hours of review, and $61 per hour for additional review time. A final TIR shall be prepared for the project and submitted with the engineering plans. Both the TIR and the plans will require the signature/seal of a professional engineer registered/licensed in the State of Washington. File #06-100630-00-PC Doc ID 35053 Ms. Lisa Klein Page 11 March 9, 2006 2. The Federal Way Development Standards Manual (including standard detail drawings, standard notes, and engineering checklists) is available on the City's website at www.cityoffederalway.com to assist the applicant's engineer in preparing the plans and TIR. The applicant shall provide a geotechnical report that addresses design pavement thickness for the roadways. 4. Bonding is required for all improvements associated with the project. The bond amount shall be 120 percent of the estimated costs of the improvements. An administrative fee deposit will need to accompany the bond to cover any possible legal fees in the event the bond must be called. Upon completion of the installation of the improvements, and final approval of the Public Works Inspector, the bond will be reduced to 30 percent of the original amount and held for a two-year maintenance period. 5. The developer will be responsible for the maintenance of all storm drainage facilities (including the detention and water quality facilities) and street systems during the two-year maintenance period. During that time, the Public Works Inspector will make periodic visits to the site to ensure -the developer's compliance with the maintenance requirements. Upon satisfactory completion of the two-year maintenance period, the remainder of the bond will be released. Maintenance for public roads and subdivision drainage facilities then become the responsibility of the City. Maintenance for private roads and drainage facilities, including short plats, remain the responsibility of the individual property owners. 6. When topographic survey information is shown on the plans, the vertical datum block shall include the phrase "DATUM: N.G.V.D.-29" or "DATUM: K.C.A.S.," on all sheets where vertical elevations are called out. 7. Drawings submitted for plan review shall be printed on 24" x 36" or 22" x 34" paper. All final approved drawings shall be drafted/plotted on 24" x 36" or 22" x 34" mylar sheet with permanent black ink. Site plans shall be drawn at a scale of 1" = 20', or larger. Architectural scales are not permitted on engineering plans. 8. Provide cut and fill quantities on the clearing and grading plan. Erosion control measures, per Appendix D, 1998 KCSWDM, must be shown on the engineering plans. 9. The site plan shall show the location of any existing and proposed utilities in the areas affected by construction. PUBLIC WORKS TRAFFIC DIVISION (Maryanne Zukowski, PE, 253-835-2742, maryan ne.zukowski[7cityoffederaiway.com) 1. Based on the Institute of Transportation Engineers Trip Generation 6rh Edition the project is expected to generate more than 10 weekday PM peak hour trips. A traffic impact analysis (TIA) prepared by a traffic engineer is required to assess project impacts and determine mitigation measures. The TIA study shall also include the following analysis: ❑ Sight Distance per AASHTO ❑ Neighborhood Impacts File 06-100630-00-PC Doc ID 35053 Ms. Lisa Klein Page 12 March 9, 2006 2. Per FWCC § 22-1474, the applicant/owner would be expected to construct half -street improvements consistent with the planned roadway cross -sections as shown in Map III-6 of the Federal Way Comprehensive Plan (FWCP) and Capital Improvement Program (CIP) shown as Table 111-19. Based on the materials submitted, staff conducted a limited analysis to determine the required frontage improvements in meeting the FWCC. Based on the analysis and FWCC, the applicant would be expected to construct half -street improvements on the following streets: a) 28`h Avenue South is proposed Type K street, consisting of a 44-foot street with curb, gutter, six-foot planter strip with trees, eight -foot sidewalk, and streetlights for the city center in a 78-foot of right-of-way. The improvements shall be from street centerline. Assuming a symmetrical cross section, an additional nine feet of right- of-way needs to be deeded to the City. Tapers and transitions beyond the project frontage may be required as deemed necessary for safety purposes, taper rate shall be based on WSDOT Design Manual; WS^2/60 or AASHTO as directed by the Public Works Director. 6. Right-of-way dedication shall be conveyed to the City through a Statutory Warrant Deed and must have clear title prior to recording. 7. The applicant may make a written request to the Director of Public Works to modify, defer, or waive the requirements improvements. Please provide photo documentation within the report of the sight distance analysis. The photo must show the location of the sight distance standard in the picture as well as the location of the viewer. If a photo cannot be provided, plan sheets with plan and profile within the report can also provide the site distance documentation. If this method is used, place the distance requirements as met on those documents and provide this information within the appendix of the report. BUILDING DIVISION (Scott Sproul, 253-835-2633, Scott.spro ul(ikit­�=offedera 1way.coin) International Building Code (IBC), 2003 edition Washington State Amendments WAC 51-40* International Residential Code (IRC), 2003 edition Washington State Amendments WAC 51-40* International Mechanical Code (IMC), 2003 edition Washington State Amendments WAC 51-42* Uniform Plumbing Code (UPC), 2003 edition Washington State Amendments WAC 51-46 & WAC 51-47* International Fire Code (IFC) 2003 Washington State Amendments* File#06-100630-00-PC Doc ID 35053 Ms. Lisa Klein Page 13 March 9, 2006 National Electric Code (NEC), 2005 edition Accessibility Code ICC/ANSI Al 17.1-2003 Washington State Energy Code WAC 5 1 -11 Washington State Ventilation and Indoor Air Quality Code WAC 51-13* *Current state amendments are dated July 1, 2004. ** As of January 1, 2002, the state amendments now require arc -fault interrupters for 15-20 amp branch circuits serving sleeping rooms in dwelling units (R-1's). Building Criteria Occupancy Classification: R-2 Type of Construction: V-B Floor Area: building 1 sq ft 14316, building 2 sq ft 8643, building 3 sq ft 8643, building 4 sq ft 8643, building 5 sq ft 8643, building 6 sq ft 10,035 Number of Stories: three stories Fire Protection: Fire Sprinklers Required Wind/Seismic :basic wind speed 85 Mph, Exposure_, 25# Snow load, Seismic Zone D-1 A complete building permit application and commercial checklist. (Additional copies of application and checklists may be obtained on our web site at: www.cityoffederalway.com.) Submit five sets of drawings and specifications. Specifications shall include: x Soils report Structural calculations _Energy calculations _Ventilation calculations. Note: A Washington State Registered architect's stamp is required for additions/alterations (new or existing) of 4,000 gross floor area or greater, unless specifically listed as an "exempt" structure per the Revised Code of Washington (RCW). Submit two copies with King County Health Department approval stamp for all projects that include food service facilities, septic systems or other elements within the project that require health department approval. Energy code compliance worksheets are required to be completed and included with your permit application. A wet stamp and signature is required on all sheets of plans and on the cover page of any calculations submitted. Federal Way reviews plans on a first in first out basis; however, there are some small projects with inconsequential review requirements that may be reviewed out of order. File1006-100630-00-PC Doc ID 35053 Ms. Lisa Klein Page 14 March 9, 2006 Review Timing The first comment letter can be expected within six to eight weeks of submittal date. Re -check of plans will occur in one to three weeks after re -submittal. Revised or resubmitted plans shall be provided in the same format, size, and amount as the originally submitted plans. Revised/resubmitted drawings shall indicate by means of clouding or written response, what changes have been made from the original drawings. Plans for all involved departments will be forwarded from Community Development Services. Federal Way has an expedited review process. Information is available at our front counter. Other Permits & Inspections Separate permits may be required for electrical, mechanical, plumbing, fire suppression systems, and signs. Applicants may apply for separate permits at any time prior to commencement of construction. When required, special inspections shall be performed by WABO approved agencies or by agencies approved by the building official prior to permit issuance. Construction must be approved by all reviewing departments prior to final building division inspection. All concerned departments (planning, public works, electrical, fire) must sign off before the Building Division can final the structure for occupancy. Building final must be approved prior to the issuance of a Certificate of Occupancy. The City of Federal Way does not issue temporary Certificate of Occupancies. All construction projects may be required to have a pre -construction conference. If a pre -con meeting is required, all subs, the general or representative, the architect or representative, the engineer or representative, electrical contractor, and any other interested party, should attend this meeting. Meetings will occur at the Building Department and will be scheduled by the inspector of record for the project. Site -Specific Requirements ■ Two accessible units are detailed and two required by Table 1107.6.1.1. • How are you making the accessible dwelling units accessible? No elevator is detailed or ramps to the living area bathrooms and sleeping area. • Please be aware that this structure will have to comply with the multi -tenant residential buildings for building enclosure requirements. The submitted plans shall detail enclosure requirements. This part of the construction also requires special inspection by third party, per Engrossed House Bill 1848, handout provided. e FWCC § 8-69 in all Group R, Division 2 occupancies having three or more levels, or containing five or more dwelling units, and Group R, Division 1 occupancies having three or more floor levels, or containing 10 or more guest rooms. Quick response standard sprinkler heads shall be used in accordance with their approved listing in the dwelling unit and guest room portions of the buildings. For the purposes of this section, condominiums shall be treated as apartments. For the purpose of this section, a floor level shall be defined as, "...that portion of a building included between the upper surface of any floor and the surface of the next floor or roof above." Firewalls as noted in IBC § 705 shall not be considered to separate a building to enable deletion of the required fire sprinkler system. File#06-100630-00-PC Doc ID 35053 Ms. Lisa Klein Page 15 March 9, 2006 The information provided is based on limited plans and information. The comments provided are not intended to be a complete plan review and further comments are possible at time of building permit plan review. LAKEHAVEN UTILITY DISTRICT (Brian Asbury, 253-946-5400, basbur u akehaven.or Water If additional hydrants are required, or indicated internally within the property, a developer extension agreement will be required. Additional detail and/or design requirements can be obtained from Lakehaven by submitting a separate application to Lakehaven for either a pre -design meeting or a developer extension agreement (application copies enclosed). Lakehaven encourages the owner to apply for either of these processes early in the pre-design/planning phase to avoid delays in overall project development. If additional hydrants are required or indicated along 28"' Avenue South, a facilities installation agreement will be required. Additional detail and/or design requirements can be obtained from Lakehaven by submitting a separate application to Lakehaven for a pre -design meeting (application copy enclosed). Lakehaven encourages the owner to apply for either of these processes early in the pre-design/planning phase to avoid delays in overall project development. * If fire protection (sprinkler) systems are required or indicated, standard service connections and meters with approved backflow prevention (typically a Double Check Valve Assembly) may be used, provided no single connection would require a service larger than two-inch diameter. These services and meters would be separate from the residential meters for the buildings. Lakehaven will allow a single, fire protection service to protect multiple buildings, and the ability to design for this would be based on system flow and service pressure. Enclosed is a copy of results of a recent computer hydraulic model Lakehaven ran for the local area that indicates the estimated system flow and pressure available. Existing water meter, and/or service, abandonment/protection will be required for any on -site building demolition. Please contact Lakehaven for further information regarding this issue. A water meter application is required for a separate meter/service for any new connections to the water distribution system, in accordance with standards defined in Lakehaven's current "Fees and Charges Resolution." Sewer A "special" side sewer permit (please use the enclosed "Pre -Design" application form) will be required for any new connection to the sanitary sewer system, or any modification to the existing side/building sewer, because such connection(s) will require Lakehaven to acquire a WSDOT right- of-way permit for the construction of new sewer facilities required in the I-5 right-of-way. Minimum slope for gravity side/building sewers is two percent. Presumably, the mainline sewer construction necessary for this site will consist of one (or more), eight -inch diameter mainline extension west from the existing sewer facilities in the I-5 right-of-way to a terminal manhole on the property. These eight -inch pipelines will be privately owned, operated, and maintained by the property owner. Six-inch diameter side sewer pipelines would then extend from the new manhole (or manholes) to File N06-100630-00-PC Doc ID 35053 Ms. Lisa K1cin Page 16 March 9, 2006 each building. Lakehaven encourages the owner to apply for this process early in the pre -design/ planning phase to avoid delays in overall project development. Existing sewer service abandonment/protection will be required for any on -site building demolition. Please contact Lakehaven for further information regarding this issue. A side sewer permit is required for any new connection to the sanitary sewer system. Minimum slope for gravity side/building sewers is two percent. General Lakehaven's Capital Facilities Charges are calculated on the basis of Equivalent Residential Units (ERU). Residential equivalency for multi -family use is calculated as 0.67 ERU per unit. Lakehaven's 2006 Multi -Family Capital Facilities Charges are $2,141/unit for water and $1,855/unit for sewer. For any proposed change or increase in usage beyond the level of the water and/or sewer system capacity previously purchased for the property(ies), Lakehaven researches prior system capacity charges paid, if any, and evaluates the subject property(ies) for the existence of any available credits and determination of a capacity "base level" for the subject property(ies). For any new or modified, non-residential connections sought after December 31, 2004, Lakehaven will assess additional Capital Facilities Charges (CFC) to property owners, where increased usage of the water and/or sewer systems beyond the property's base level, including increases attributable to usage associated with existing service(s), is indicated based on owner's submittal of estimated water consumption figures. Additionally, Lakehaven will levy, and the owner shall pay, a capacity rental charge for capacity utilized, based on water consumption records, during a usage monitoring period (not to exceed five years) above the level of capacity available following payment of any additional CFC. The owner has the option to make full purchase of any system capacity deficit at any time. Currently, system capacity is available for this property from system capacity charges previously assessed for six ERU for water and under Sewer ULID 44, for 14 ERU for sewer. All comments herein are valid for one year and are based on the proposal(s) submitted and Lakehaven's current regulations and policies. Any change to either the development proposal(s) or Lakehaven's regulations and policies may affect the above comments accordingly. Note: Lakehaven Utility District neither warrants nor guarantees the accuracy of any facility information provided. Facility locations and conditions are subject to field verification. All fees and charges subject to change without notice. SOUTH KING FIRE AND RESCUE (Greg Brozek, 253-946-7241, greg_brozek@,federalwavflre.org) Water Supplies for Fire Protection The required fire flow for this project is gallons per minute. A Certificate of Water Availability shall be provided indicating the fire flow available at the site. This project will require fire hydrant(s). Existing fire hydrants on public streets are available for this project. Existing fire hydrants on adjacent properties shall not be considered unless fire apparatus access roads extend between properties and easements are established to prevent obstructions of such roads. File #06-100630-00-PC Doc ID 35053 Ms. Lisa Klein Page 17 March 9, 2006 When any portion of the facility or building protected is in excess of 400 feet from a water supply on a public street, as measured by an approved route around the exterior of the facility or building, on -site fire hydrants and mains capable of supplying the required fire flow shall be provided. Fire hydrants: 1) Shall be located not more than 300 feet on center. All measurements shall be made as vehicular travel distance. 2) Shall not be located closer than 50 feet to any building. 3) Shall not be obstructed by any structure or vegetation, nor shall the visibility of the fire hydrant be impaired for a distance of 50 feet in the direction of vehicular approach to the fire hydrant (KCFD #39 Administrative Policy Guideline No. 1004). Fire hydrant locations are subject to the approval of the Fire Marshal or his/her designee. When exposed to vehicular damage, fire hydrants shall be suitable protected. Fire hydrants shall be in service PRIOR to and during the time of construction. Fire Apparatus Access Roads Fire apparatus access roads shall be provided when any portion of the facility, or any portion of an exterior wall of the first story of the building, is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. EXCEPTION: When buildings are completely protected with an approved automatic fire sprinkler system, these provisions may be modified by the chief. Plans for fire apparatus access roads shall be submitted to the fire department for review and approval prior to construction. Fire apparatus access roads: 1) Shall have an unobstructed width of not less than 20 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches. 2) Shall be designed and maintained to support the imposed load of a 30 ton fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. 3) Shall be not less than a 20-foot inside turning radius and not less than a 40-foot outside turning radius. 4) With a dead-end in excess of 150 feet in length shall be provided with a cul-de-sac or Fire Department approved alternative at the dead end. All such cul-de-sacs shall be not less than 80 feet in diameter. 5) Gradient shall not exceed 12 percent (KCFD #39 Administrative Policy Guideline No. 1006). Designated fire lanes may be required for emergency access. This may be done during the plans check or after the facility is in operation. File #06-100630-00-PC Doc ID 35053 Ms. Lisa Klein Page 18 March 9, 2006 When required, approved signs or other approved notices shall be provided and maintained for fire apparatus access roads to identify such roads and prohibit the obstruction by parking and other obstructions. Fire apparatus access road gates shall comply with KCFD #39 Administrative Policy Guideline No. 1003. Fire apparatus access roads shall be installed and made serviceable PRIOR to and during the time of construction. Fire -Extinguishing Systems Three sets of plans and specifications for automatic fire -extinguishing systems, standpipes, and their appurtenances shall be submitted to the fire department for review and approval prior to installation. Plans shall be drawn to an indicated scale, on sheets of uniform size, with a plan of each floor, and shall show those items listed in Chapter 14 of NFPA 13 that pertain to the design of the system. Sprinkler plans shall bear a Washington State Certificate of Competency stamp. An automatic fire sprinkler system shall be installed in all Group R, Division 2, occupancies having three or more levels, or containing five or more dwelling units, and Group R, .Division 1 occupancies having three or more floor levels, or containing ten or more guest rooms. Fire walls shall not be considered to separate a building to enable deletion of the required fire sprinkler system (FWCC Chapter 8, Article H, Division 4). An automatic fire sprinkler system shall be installed in all occupancies requiring 2,000 gpm or more fire flow, or where the total floor area included within the surrounding exterior walls on all floor levels, including basements, exceeds 10,000 square feet. Fire walls shall not be considered to separate a building to enable deletion of the required automatic fire -extinguishing system (FWCC Chapter 8, Article II, Division 4). The automatic fire -suppression system shall be connected to the fire alarm system (last zone) in all buildings having an automatic fire detection system. The system demand pressure (to the source) required in a hydraulically designed automatic fire sprinkler system shall be at least 10 percent less than the correlative water supply curve pressure. Fire department connections shall comply with KCFD 39 Administrative Policy Guideline No.1002. Automatic Fire Detection System An automatic fire detection system shall be installed in all buildings exceeding 3,000 square feet gross floor area. This fire detection system shall be monitored by a central and/or remote station conforming to the current requirements of the National Fire Protection Association standards and/or the fire chief or designee (FWCC Chapter 8, Article H, Division 4). Plans and specifications for fire alarm systems shall be submitted to the fire department for review and approval prior to system installation. Plans and specifications shall include, but not be limited to, a floor plan; location of all alarm -initiating and alarm -signaling devices; alarm control and trouble -signaling equipment; annunciation; power connection; battery calculations; conductor type and sizes; voltage drop calculations; manufacturer, model numbers, and listing information for all equipment, devices, and materials; details of ceiling height and construction; and the interface of fire safety control functions. File #06-100630-00-PC Doe ID 35053 Ms. Lisa Klein Page 19 March 9, 2006 Fire alarm systems, automatic fire detectors, emergency voice alarm communication systems, and notification devices shall be designed, installed, and maintained in accordance with NFPA 72 and other nationally recognized standards. Systems and components shall be listed and approved for the purpose for which they are installed. A manual fire alarm system shall be installed in Group R-2 occupancies (see exceptions) where: 1. Any dwelling unit or sleeping unit is located three or more stories above the lowest level of exit discharge; 2. Any dwelling unit or sleeping unit is located more than one story below the highest level or exit discharge of exits serving the dwelling unit or sleeping unit; or 3. The building contains more than 16 dwelling units or sleeping units. A remote fire alarm annunciator panel(s) shall be installed at the following location(s): Fire alarm control panel and remote annunciator panel keys shall be located: In a Supra lock -box to be located Portable Fire Extinguishers Portable fire extinguishers shall be installed in accordance with NFPA 10. Fire Department Access to Buildings Exterior doors and openings required by the IBC and/or the 1FC shall be maintained readily accessible for emergency access by the Fire Department. An approved access walkway leading from fire apparatus access roads to exterior openings required by the IBC and/or the IFC shall be provided when required by the chief. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall contrast with their background. Numbers shall be a minimum of six inches in height. When access to or within a structure or an area is unduly difficult because of secured openings, or where immediate access is necessary for life saving or firefighting purposes, the chief is authorized to require a key box to be installed in an accessible location. The key box shall be of a type approved by the chief and shall contain keys to gain necessary access. THESE COMMENTS ARE VALID FOR 180 DAYS FROM REVIEW AND ONLY FOR THE PLANS REVIEWED. File #06-100630-00-PC Doc 1D 35053 Ms. Lisa Klein Page 20 March 9, 2006 CLOSING This letter reflects the information provided at the preapplication meeting and is intended to assist you in preparing plans and materials for formal application. We hope you found the comments useful to your project. We have made every effort to identify major issues to eliminate surprises during the City's review of the formal application. The completion of the preapplication process in the content of this letter does not vest any future project application. Comments in this letter are only valid for one year as per FWCC § 22-1657. As you know, this is a preliminary review only and does not take the place of the full review that will follow submission of a formal application. Comments provided in this letter are based on preapplication materials submitted. Modifications and revisions to the project as presented for this preapplication may influence and modify information regarding development requirements outlined above. In addition to this preapplication letter, please examine the complete FWCC and other relevant codes carefully. Requirements that are found in the codes that are not addressed in this letter are still required for your project. If you have questions about an individual comment, please contact the appropriate department representative noted above. Any general questions can be directed towards the key project contact, Senior Planner Lori Michaelson, AICP, 253-835-2646. We look forward to working with you. Sincerely, �/ Lori Michaelson, AICP Senior Planner Enc: Preapplication Meeting Sign -Up Sheet Master Land Use Application Development Requirements Checklist for Processes III and IV Environmental (SEPA) Checklist Crime Prevention Through Environmental Design (CPTED) Checklist City Handout, "Lot Line Elimination" City Handout, "Boundary Line Adjustment" City Handout, "Process III" City Handout, "Mailing Labels Procedures" City Handout, "Average Building Elevation" FWCC § 22-949, "Garbage and Recycling Receptacles, Placement and Screening" FWCC § 22-960, "Rooftop Appurtenances, Required Screening" FWCC § 22-667 et seq., "RM Use Zone Chart" FWCC Chapter 18, "Environmental Protection" FWCC Chapter 22, Article XVII, "Landscaping" FWCC Chapter 22, Article XVIII, "Signs" FWCC Chapter 22, Article XIX, "Community Design Guidelines" Lakehaven Pre -Design Application/Checklist Lakehaven Developer Extension Agreement Application/Checklist Lakehaven Facilities Map c: Kevin Peterson, Engineering Plans Reviewer Maryanne Zukowski, Senior Traffic Engineer Scott Sproul, Acting Assistant Building Official Brian I. Asbury, Lakehaven Utility District Greg Brozek, South King Fire & Rescue E. Tina Piety, Administrative Assistant File#06-100630-00-PC Doc ID 35053 # FEDERAL WAY WATER AMD SEWER PEFh �NUMI SIN BOOK NO G SIDE SEWER PERMIT DWG NO .I �•F,i;st+1$E - liU.1;41 OATF _— _ S_•. 1:39-. OWNER P.d 1 pl I A . I_ •. K nF. SIDE SEWER CONTRACTOR C' PROPERTY ADDRESS .il,108 28th .Ave., ti;). CITY r,i , ri'1}' Lip 11io 11 j PUT NAME T,N.1o] .At, r'd T_Il.�d LOT NO - BLR NO AHY M{1pIF}L"AT�ON TU SElN R SY5TkIA MUS4 NAVE hFlp OF MILkISTRIr:T ---- •- J FEES rt -- - fNLIEU OFAWS$MENT !t! Lie j A(iRF- L�:;?o\:r. t li• l� - . 0----�.. r•-mrl INC. TYPE . :�..~y -L' • -�,� i r:i --- . _ ._�.y4 =YeR':%_"!-£ •SE[�TK1.+I _ -- `-- � i.I_.—.7._►--+"Ti'il-i.:�71k.�.. .._....:i y.a s____-'_--.r _._�-^^►-.,. AFP(ICSFTT u'r iri:�"� DATE j 4,F HFREBY CERTIFY THAT TESTING HAS BEEN APPROVED ANC` TH: ABOVE CONNEC i ION HAS BEEN MADE AS SHOWN IN PUCE PIPETEST !j 1 R DATE "'/fi a•`I TYPF. lE57 � ' �OR C City of Federal Way Community Development Review Committee (DRQ SIGN -IN SHEET PREAPPLICATION CONFERENCE Project: South Fork Condos - Preapplication Date: March 2, 2006 City File No.: 06-100630-PC NAME WITH PHONE I v. 2-r3 • $ 3 S- Oe A i.q ve At-cin 2��-�7z4z1 )eA 19M9z- S-3 -3 '3 3L/,,)� //ram U[Cf��r►+�rti �UUclJr��j�r�P.rL_�n ---)S3-57�-Qvr! C f2� fiwAlw"� OT3 —935 =ZQt 1 CITY OF Federal February 13, 2006 CITY HALL Way 33325 8th Avenue South Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com Ms. Lisa Klein, Project Manager AHBL 2215 North 30'' Street Tacoma, WA 98503-3350 Re: Preapplication File #06-100630-00-PC South Fork Condos, 31408 28'h Avenue South, Federal Way Dear Ms. Klein: The above referenced preapplicati6n has been assigned to me as project planner, and routed to the members of the Development Review Committee (DRC). You are listed in the file as project applicant. Your meeting with the DRC has been scheduled as follows: March 2, 2006 — 9:00 a.m. Federal Way City Hall Community Development Services Department (2"d Floor) 33325 8`s Avenue South PO Box 9718 Federal Way, WA 98063 Please check in with the receptionist upon arrival. We look forward to meeting with you at that time. Please confirm your attendance at the meeting, and indicate the total number of people you expect to attend the meeting with you. I can be notified at lori.michaelson ci offederalwa , or at 253- 835.-2645. Sin e y, �HMchaeIso , AICP Senior Planner Doc. I D 35069 RECEIVED FEB 0 9 2006 SIT B 0 AY DING DEPT. Project Name: South Fork Federal Way Townhomes Permit No.: # Address: 31408 281h Ave. S. Federal Way, WA 98003 Architect of Record: Owner: Applicant: Subject: Date: Municipality: Jon Graves Architects & Planners— 3110 Ruston Way Ste. D' Tacoma, WA 98402 South Fork Homes LLC Len Zickler — 2215 N. 30th St. Tacoma, WA — (253) 383-2422 Pre -application conference .2006 Federal Way, Washington Statement of architectural design intent, including finish materials and colors: 22-1634 Site design — All zoning districts. (1) Natural amenities such as views, significant or unique trees, creeks, riparian corridors, and similar features unique to the site should be incorporated into the design. There are no significant trees, creeks, riparian corridors or similar features on or visible from the site. Mt. Rainier, approximately 100 miles to the south may be visible from the site. (2) Pedestrian areas and amenities should be incorporated in the overall site design. Pedestrian areas include but are not limited to outdoor plazas, arcades, courtyards, seting areas, and amphitheaters. Pedestrian amenities include but are not limited to outdoor benches, tables and other furniture, balconies, gazebos, transparent glass at the ground floor, and landscaping. Active and passive play areas are incorporated intothe site per the requirements of the RM 2400 zoning parameters. Benches, a `tot lot; sheltered, clustered mailboxes are incorporated into the overall site design. 1 (3) Pedestrian areas should be easily seen, accessible, and located to take advantage of surrounding features such as building entrances, open spaces, significant landscaping, unique topography or architecture, and solar exposure. Pedestrian access point are clearly defined by the drive entrance they are contiguous with and with a wood trellis feature at the southwest corner of the site. Pedestrian access is provided at both the north and south ends of the site. The eastern edge of the site is bordered by Interstate 5, to the west is 2e' Ave. 5., from which both vehicular and pedestrian access is provided. (4) Project designers shall strive for overall design continuity by using similar elements throughout the project such as architectural style and features, materials, colors, and textures. Overall continuity in architectural design is achievEd through the use of typically residential materials, including, but not limited to wood (or vinyl) lap siding: vertcal 'board and batten' siding; wood railing systerns and asphalt shingles. Colors will be beige, earth -tone, or otherwise neutral. No brigit primary colors are anticipated. The proposed project will use colors consistent with similar development in the area and will not be flamboyant in nature or visually intrusive. (5) Place physical features, activities, and people in visible locations tomaximize the ability to be seen, and therefore, discourage crime. Clustered mailboxes and active play areas are located in such a manner that each can be casually monitored as normal activity takes place within and at the entrances to the site. For instance, the pedestrian access to the south is located next to a play court, a clustered mailbox, and seating areas. These accesspoints can be easily monitored from both interior and exterior locations. (6) Provide access control by utilizing physical barrers such as bollards, fences, doorways, etc... The entire site is to be fenced. Doorways to individual units are set off from the public way by the raised porches and landscaped elements to create `defensible space' in and around each unit. (7) Design buildings and utilize site design that reflects ownership. Each dwelling unit has its own front entry door and porch as well as individual garages and driveways. In addition landscape elements will delineate separate yards within the larger site. 0) lib) Surface parking lots. Driveways shall be located to be visible from the rightof-way but not impede pedestrian circulation on -site or to adjoining properties. Driveways should be shared with adjacent properties to minimize the number of driveways and curb cuts. Driveways (parking pads) are located adjacent to individual dwelling units. The number of curb cuts at 29h Ave. S. will be limited to the one vehicle access point into the site. Parking structures which are part of new development shall be architecturaly consistent with exterior architectural elements of the primary structure, including rooflines, facade design, and finish materials. Parking is located within buildings in individual garages. They are part of the overall building design configuration. Buildings built over parking should not appear to "float" over the parking area, but should be linked with ground level uses or screening. Parking at grade under a building is discouraged unless the parking area is completely enclosed within the building orwholly screened with walls and/or landscaped berms. All required parking can be contained within individual buildings and completely enclosed. Complimentary `at large' or guest parking can be accommodated on driveways to individual dwelling units. (d) Pedestrian circulation and _public spaces. (1) Primary entrances to buildings should be clearly visible or recognizable from the rightof- way. Pedestrian pathways from rights -of -way and bus stops to primary entrances, from parking lots to primary entrances, and pedestrian areas, shall be accessible and should be clearly delineated. All dwelling units have individual entrances for both pedestrians and automobiles. Entrances are clearly delineated with garage doors, driveways, porches, gates, fences, and landscape sequences. (2) Pedestrian pathways and pedestrian areas should be delineated by separate paved routes using a variation in paved texture and color, and protected from abutting vehicle circulation areas with landscaping. Pedestrian walks will be of a different nature, scale, texture and material from materials used for vehicle circulation. (3) Pedestrian connections should be provided between properties to establish pedestrian links to adjacent buildings, parking, pedestrian areas and public rightsof-way. 3 These connections are provided by 6' wide sidewalks leading from the interior of the site to 2d" AVE. S. to the west, the nearest public righ€of--way. Outdoor furniture, fixtures, and streetscape elements, such as lighting, freestanding signs, trellises, arbors, raised planters, benches and other forms of seating, trash receptacles, bus stops, phone booths, fencing, etc., should be incorporated into the site design. Outdoor furniture appropriate to a residential project will be included on the site. Benches, arbors, fences, sheltered and clustered mailboxes, playground areas and adjacent landscaping will be incorporated into the site. (2) Site utilities shall comply with the following: a. Building utility equipment such as electrical panels and juncton boxes should be located in an interior utility room. Or in an interior location acceptable to the City of Federal Way and in compliance with applicable building codes. b. Site utilities including transformers, fire standpipes and engineered retention ponds (except biofiltration swales) should not be the dominant element of the front landscape area. When these must be located in a front yard, they shall be either undergrounded or screened by walls and/or Type I landscaping, and shall not obstruct views d tenant common spaces, public open spaces, monument signs, and/or driveways. Storm drainage facilities will be in compliance with the above statement. (g) Miscellaneous site elements. (1) Lighting shall comply with the following: a. Lighting levels shall not spill onto adjacent properties pursuant to FWCC22-954(c). b. Lighting shall be provided in all loading, storage, and circulation areas, butshall incorporate cut-off shields to prevent o%site glare. All exterior lighting will be reviewed by a lighfng consultant to ensure that appropriate areas are illuminated and that light migration or `spillover' onto adjacent sites does not occur. rd 22-1635 Building design— All zoning districts. (a) General criteria. Emphasize, rather than obscure, natural topography. Buildings should be designed to "step up" or "step down" hillsides to accommodate significant changes in elevation, unless this provision is precluded by other site elements such as stormwater design, optimal traffic circulation, or the proposed function or use of the site. The site is relatively flat. Stepping in any direction will be minimal. Materials and design features of fences and walls should reflect that of the primary building(s). Fences, walls, arbors, railings, and balconies will reflect the color, scale, and materiality of the major buildings proposed for the site. (b) Building facade modulation and screening options, defined. All building facades that are both longer than 60 feet and are visible from either a righfof-way or residential use or zone shall incorporate facade treatment according to this section. (1) Facade modulation. Minimum depth: two feet; minimum width: sk feet; maximum width: 60 feet. Alternative methods to shape a building such as angled or curved facade elements, off -set planes, wing walls and terracing, will be considered; provided, that the intent of this section is met. All requirements for facade and building modulation will be met or exceeded. (2) Landscape screening. See site plan (A1.0) for location and types of landscape screening. All landscape screening will comply with the requirements ofthis section (c) Building articulation and scale. (1) Building facades visible from rights -of -way and other public areas should incorporate methods of articulation and accessory elements in the overall architectural design, as described in subsection (c) (2) of this section. (2) Methods to articulate blankwalls: Following is a nonexclusive list of methods to articulate blank walls, pursuant to FWCC 22-1564(u) and subsection (c)(1) of this section: b. Window openings with visible trim material or painted detailing that resemble trim; c. Vertical trellis(es) in front of the wall with climbing vines or similar planting; 5 d. Set the wall back and provide a landscaped or raised planter bed in front of tle wall, with plant material that will obscure or screen the wall's surface; f. Architectural features such as setbacks, indentations, overhangs, projections, articulated cornices, bays, reveals, canopies, and awnings; g. Material variations such as colors, brick or metal banding, or textural changes The proposed building site and building will incorporate many if not all of the above articulation methods and design features. See building elevations (A3.0 and A3.1). 22-1636 Building and pedestrian orientation — All zoning districts. (a) Building and pedestrian orientation. Buildings should generally be oriented to rights,of--way. Features such as entries, lobbies, and display windows, should be oriented to the rightof-way; otherwise, screening or art features such as trellises, artwork, murals, landscaping, or combinations thereof, should be incorporated into the street -oriented facade. These features (with the exception of murals and artwork) will be incorporated into the design of the buildings, both within the site and along the 2dh Ave. S. frontage. Plazas, public open spaces and entries should be located at street corners to optimize pedestrian access and use. The entry to the site is easily accessible by both vehicles and pedestrians from 28' Ave. S. Multiple buildings on the same site should incorporate public spaces (formal or informal). These should be integrated by elements such as plazas, walkways, and landscaping along pedestrian pathways, to provide a clear view to destinations, and to create a unified, campus -like development Walkways, drive lanes, landscape elements, and outdoor amenities will create a unified development Principal entries to buildings shall be highlighted with plaza or garden areas containing planting, lighting, seating, trellises and other features. Such areas shall be located and designed so windows overlook them. All building entrances are visible from within their respective dwelling units and from other dwelling units surround particular dwelling units. 2 (11) Common recreational spaces shall be located and arranged so that windows overlook them. Windows will overlook common recreational areas wherever practical and feasible, (12) Units on the ground floor (when permitted) shall haveprivate outdoor spaces adjacent to them so those exterior portions of the site are controlled by individual households. Out door entry sequences (i.e. porches, steps, and landscape elements) will provide `control' of exterior areas adjacent to front, rear, and garage entries. (13) All new buildings, including accessory buildings, such as carports and garages shall appear to have a roof pitch ranging from at least 4:12 to a maximum of 12:12. No roof has a pitch lower than 4:12; none is greater than 12:12. (14) Carports and garages in front yards should be discouraged. They are wherever possible. (15) The longest dimension of any building facade shall not exceed 120 feet. Buildings on the same site may be connected by covered pedestrian walkways. No building fagade on site is longer tha7 120 feet. (16) Buildings should be designed to have a distinct "base," "middle" and "top." The base (typically the first floor) should contain the greatest number of architectural elements such as windows, materials, details, overhangs, cornice lines, and masmry belt courses. The midsection, by comparison, may be simple. (Note: singlestory buildings have no middle.) The top should avoid the appearance of a flat roof and include distinctive roof shapes including but not limited to pitched, vaulted or terraced,etc. See elevations (A3.0 and A3.1). The design parameters of item #16 have been met. (17) Residential design features, including but not limited to entry porches, projecting window bays, balconies or decks, individual windows (rather than strip window4, offsets and cascading or stepped roof forms, shall be incorporated into all buildings. Window openings shall have visible trim material or painted detailing that resembles trim. See elevations (A3.0 and A3.1), all the requirements of item #17 have been incorporated into the design of the buildings. END OF DOCUMENT. VA RECEIVED February 8, 2006 FEB 0 9 2006 CITY OF FEDERAL WAY BUILDING DEPT. City of Federal Way Department of Planning & Community Development 33325 8th Avenue South Federal Way, WA 98063-9718 Project: Southfork Homes - 28th Ave S. Condominiums, Our File No. 205739.30 Subject: Request for Preapplication Conference Dear Sir/Madam: ;i iJ LW Civil Engineers Please find enclosed the application materials required for a preapplication conference. We would like to discuss our development plan for a 1.69 acre site located east of Truman High School and west of Interstate 5 on 281h Avenue South. The property is zoned Structural Engineers RM 2400 consistent with the zoning in the surrounding area. Landscape Architects We are planning a three-story multi-family/condominium project with a total of 26 units. (Maximum allowed density per zoning is 30 units). The project proposes to provide 10 percent of the site as an active park located in two areas, a children's play area and a Community Planners basketball court. We would like to discuss the ability to include the site perimeters for the other 5 percent open space requirement. The perimeter buffers are 20 feet on the west Land Surveyors and east boundaries, and 10 feet on the north and south. We plan to construct a stormwater detention vault under the access road. There is an Neighbors existing fish storage warehouse and an uninhabited residential structure on site that will be demolished for this project. All required building and site plan details are provided on the enclosed site plan. We believe our project meets the existing City codes and is a viable development plan. We are interested in hearing the City's feedback on the plan and any potential issues we should be aware of. We look forward to discussing this project with you at our preapplication conference. In the meantime if you should require additional information, please feel free to contact me at(253) 383-2422. Sincerely, Lisa Klein Project Manager LK/sca Enclosure TACOMA c: John White, Jon Graves Architects & Planners 2215 Don Olson, Don Olson Construction North 30th Street Suit Len Zickler, AHBL Suite Tacoma, WA 98403-3350 253.383.2422 TEL V:\Planning\Yr_2005\205739\739-pre-app Itr-wp.doc 253.383.2572 FAx 205739Ltr060208.doc www.ahbl.com RECEIVED FEB Q 9 Z006 MASTER LAND USE APPLICATION DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES CITY OF 33325 8`h Avenue South C��BUILDING0EPT AY PO Box 9718 9718 FederaI Way Federal Way Fax 98835-2609 253-835-2607; Fax 253-835-2609 w%yw.cityolk cralway.coin APPLICATION NO(S) 0�1 ✓ 1 ilJ[Li CJV Date Project Name 500 h E C)Cyl S4_ ` _`�4 • Cdrl�C103 Property Address/Location L4 US 'S- J e c - k W 14 Parcel Number(s) -I l D I L� 0 l "_f (1 Project Description PLEASE PRINT Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination X Preapplication Conference Process I (Director=s Approval) Process II (Site Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial/Residential Required Information [1 �y c4o Zoning Designation Nlj + (I Comprehensive Plan Designation 6 700 U Value of Existing Improvements Value of Proposed Improvements International Building Code (IBC): RaOccupancy Type y,2�, Construction Type Applicant Name: LiS0. Address: �?.)kSSfie3oo City/State: - (LC0 r,, ,,,t L„ A Zip: awy o 3 Phone: #25-3 - 3 $ 3 :Z Uaa Fax: 253 - 3F5r3 '.Z S7.2 Email: IJt,��jp`�,bk. GOM Signature: � Agent (if different than Applicant) Name: Address: City/State: Zip: Phone: Fax: Email: Signature: Owner Name: SoU� Pc:,c-X �L -(- Address: ro`�Q 12,px 13 O City/State: So rnne_jr, t L,)A Zip: C� V39 0 Phone:.253 -q )' -g 33 ► Fax: 253-73,S -D9(cS' Email: Signature (/ 4 ��/� Bulletin #003 — August 18, 2004 Page 1 of 1 k:\Handouts\Master Land Use Application CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: February 10, 2006 TO: Will Appleton, Development Services Manager (2 sets) Scott Sproul, Assistant Building Official B. Sanders, Parks Department Brian Asbury, Lakehaven Utility District Greg Brozek, South King Fire and Rescue Geri Walker, Federal Way School District Stacy Flores, Public Safety Officer FROM: Lori Michaelson FOR DRC MTG. ON: February 23, 2006 - Internal March 2, 2006 — 9:00 - with applicant FILE NUMBER(s): 06-100630-00-PC RELATED FILE NOS.: None PROJECT NAME: South Fork Condos PROJECTADDRESS: 31408 28TH AVE S ZONING DISTRICT: RM 2400 PROJECT DESCRIPTION: Proposal to construct a 3-story multi -family condo project with a total of 26 units. LAND USE PERMITS: SEPA, Process III PROJECT CONTACT: AHBL, INC. LISA KLEIN 2215 30TH ST Suite 300 253-383-2422 (Work) MATERIALS SUBMITTED: Cover letter dated 2/8/06 Statement of Design Intent Zoning Map Preliminary Site Plan; Floor Plans; Building Elevations (Sheets T1.0, A1.0, A2.0, A2.1, A2.2, A3.0, A3.1. Federal Way SOUTH FORK CONDOMINIUMS TRAFFIC IMPACT ANALYSIS JTE: Inc, JAKE TRAFFIC ENGINEERING, INC. Prepared for Mr. Don Olson SOUTH, FORK HOMES, LLC PO Box 980 Sumner, WA 9839O May 9, 2006 Mark J. Jacobs, PE, PTOE, President 77318th Ave. SW - Seattle, WA 98106 - 2007 Tel. 206.762.1978; Cell. 206.799.5692 Facsimile 206.762.1978 Email -jaketraffic@comcast.net RECL,VED QM OF FIB IRA , WAY I,T.y 12 Z006 Jake Traffic Engineering, Inc.. Mark J. Jacobs, PE, PTOE President 1131 81h Ave SW - Seattle, WA 98106 - 2007 Tel. 206.762.1978 - Cell 206.799.5692 - Facsimile 206.762.1918 E-mail jaketraffic@comcast.net May 9, 2006 Mr. Don Olson SOUTH FORK HOMES, LLC PO Box 930 Sumner, WA 98390 Re: South Fork Condominiums - Federal Way Traffic Impact Analysis Dear Mr. Olson; We are pleased to submit this Traffic Impact Analysis for the proposed 30-units condo/multifamily development South Fork Condominiums project. The site is located at 31408 28th Avenue South on Parcels #0921049148 & #0921049142 (parcels information attached in the appendix) in Federal Way. Access to the site will be via one driveway on 28th Avenue South. We have conducted a field review of the site and surrounding street system and have prepared this analysis in accordance to our understanding of the City of Federal Way's criteria. The general report format is to describe the proposed project, identify existing traffic conditions (baseline), project future traffic conditions and identify Agency street improvements (future baseline), calculate the traffic that would be generated by the project and then add it to the future baseline traffic volumes. Operational analysis is used to determine the specific project traffic impact and appropriate traffic mitigation measures to reduce the impact. Additionally, Agency pro-rata share traffic impact fees are addressed in this report. The City of Federal Traffic Impact Analyses criteria require that intersections affected by 10 PM peak hour trips be evaluated for site traffic affects. The only intersections that meet this threshold are: ➢ 28th Ave. S./S. 317th St. HOV access to SR - 5; a modern roundabout controlled intersection. ➢ S. 317th St./Gateway Center Blvd. S.; a right in out only stop controlled intersection By Traffic Engineering inspection both of the above intersections operate well. In addition to the above intersections the site access intersection requires analysis. Traffic data was obtained at the following intersection to facilitate our analysis of the site access intersection. ➢ S. 312th St /28th Ave. S. ➢ S. 317th St./23rd Ave. S. \\Enginae2\c\- ,jo File.\2006027 S—h Forks Condominiums Don Olson C... t u ion Sound Engine nng. Fed,,.l w y\$,.0 For ..d,.,., maT ndP kingd., JTE, Inc. Mr. Don Olson SOUTH FORK HOMES, LLC May 9, 2006 Page-2- The summary, conclusions and recommendations begin on page nine of this report. PROJECT INFORMATION Figure 1 is- a vicinity map showing the location of the proposed site and surrounding street network. Figure 2 shows a preliminary site plan prepared by Jon Graves Architects & Planners. The - plan shows the proposed 30-units in 6 separate buildings condo/multifamily development South Fork Condominiums project. Access to the site will be via one driveway on 28th Avenue South. Full development and occupancy of the proposed South Fork Condominiums project is anticipated to occur by 2007/2008, presuming the permits are issued in a timely manner. However, to ensure a conservative analysis 2010 has been used as the horizon year. EXISTING ENVIRONMENT Project Site The site is presently developed with one single family detached housing and a 6,984 sq. ft. warehouse which will be removed upon construction of the proposed project. Street System Figure 3 shows the existing traffic control, number of street lanes, number of approach lanes at intersections and other pertinent information. The primary streets within the study areas and the classifications (per City of Federal Way Comprehensive Plan, Functional Classification of Existing and Planned Streets and Highways) are as follows: ➢ SR- 5 ➢ S. 320th St. ➢ Pacific Hwy. S. ➢ 28th Ave. S. ➢ S. 312th St. ➢ 23rd Ave. S. ➢ Gateway Center Blvd. S. Freeway Principle Arterial Principle Arterial Minor Arterial Minor Arterial Principal Collector Minor Collector The street directly serving the site is 28th Avenue South. This street is two lanes at the site and has a posted speed limit of 35 MPH. J\\Eng,.-2\,\-N.j1 Fd.\200602T-S—ForksCntlom--- Don Dlenn CDnavd— S—d Engmemmg- Federalw \5— F,,k,C,nd,min—Tl ndP,rkin&d,. JTE, Inc. Mr. Don Olson SOUTH FORK HOMES, LLC May 9, 2006 Page-3- Traffic Volumes Figure 4 shows the existing PM peak hour traffic volumes for the analysis intersections. We obtained existing PM peak hour turning movement counts from the City of Federal Way website (www.clbQffederalway.com) at the analysis intersections on the date shown in Figure 4. The count data sheets are attached in the appendix. Transit Service The Federal Way Transit Center (FWTC) is located southwest of the proposed project at 3162123rd Ave. South. The FWTC is located less than 3/4 mile south west of the proposed project. The FWTC is served by Metro Bus Routes: 174, 181, 182, 183, 187, 194, 197, 901, & 903. Pierce Transit Bus Routes: 402, 500, & 501 and Sound Transit Routes 565, 574 and 577 also serve the FWTC. In addition to the FWTC a Park & Ride is also located southwest of the proposed project at 32320 23rd Ave. South. Metro Routes 173, 174, 177 and 194 serve the Park & Ride. The Park & Ride is located less than mile southwest of the proposed project. Additional information on the above mentioned routes can be obtained online at h ttp: //t ra n s i t. m et ro k c. gov. Intersection Operations Traffic engineers have developed criteria for intersection operations called level of service (LOS). The LOS are A to F with A and B being very good and E and F being more congested. LOS C and D correlate to busy traffic conditions with some restrictions to the ability to choose travel speed, change lanes and the general convenience comfort and safety. The procedures in the Transportation Research Board Highway Capacity Manual, 2000 were used to calculate the level of service at the study intersections. The LOS at the analysis intersections are depicted in Table 1. The following table depicts the LOS and corresponding average delay in seconds at signalized and 'stop control intersections: Intersection I Level of Service Type i — - — I — — A Ii B II C I' D E F Signalized <10 >10 and >20 and >35 and >55 and >80 <20 <35 <55 <80 Stop Control <10 >10 and >15 and >25 and >35 and — >50 <15 <25 <35 <50 \\Engineer]\.\-P,.j-F—\2006027 S—Fork. C.ntlo -... O.n01— Can.tr.0- S... d -F.e.,y.— JTE, Inc. Mr. Don Olson SOUTH FORK HOMES, LLC May 9, 2006 Page-4- LOS Analysis Criteria The City of Federal Way LOS standard is `E' at signalized and all way stop control intersections. The standard for stop control intersections is the volume to capacity ratio not exceeding one. Currently the analysis intersections meet City standard for signalized and all way stop controlled intersections. LOS Analysis Software The LOS of the study intersections were calculated using the following software programs: ➢ Signal 2000 by Strong Concepts (signalized intersections) ➢ HCS 2000 by McTrans (stop controlled intersections) Accident Data Accident data was provided by City of Federal Way staff for a three year time period (May 4th 2002 to May 4th 2005) at the analysis intersections (attached in the appendix). Based on the data provided, there were eight recorded accidents at the 23rd Ave. S./S. 317th St. intersection. This yields an accident rate of 0.5 per million entering vehicles. There were seven recorded accidents at the 28th Ave. S./S. 312th St. intersection. This yields an accident rate of 0.5 per million entering vehicles. The accident rate was determined using the PM peak hour traffic data and a "k" factor of 10. This factor presumes that about 10% of the daily traffic occurs during the PM peak hour that is typical. No accidents were recorded (February 28th 2003 - February 28th 2006) on the 1/3rd mile stretch of 28th Ave. S. between S. 312th to S. 317th St in the three year time period reviewed. The City of Federal Way identifies safety inadequacies by any of the following conditions over a three-year period: ➢ A collision rate of more than 1.0 collisions per million entering vehicles at an intersection. ➢ A collision rate of more than 10.0 collisions per million vehicle miles on a roadway segment. The analysis intersections and experience an accident rate of less than one thus appears to be operating satisfactorily. Twenty Eighth Avenue South between the endpoint intersections had no recorded accidents. HORIZON YEAR CONDITIONS "WITHOUT" THE PROJECT Figure 5 shows the projected 2010 PM peak hour traffic volumes "without" the project. These volumes (rounded to the nearest five vehicles except when less than five) include the existing traffic volume counts plus background growth. A growth factor of two percent per \\Eng,—r2\.\-P,adF—\2006 D27--F-M C,nd..i. ,Dun ObnnC... -ti0n Sound EnWneering- F,d,r,l••..-.--••....• .. -.ir i... Mr. Don Olson SOUTH FORK HOMES, LLC May 9, 2006 Page-5- year was applied based on past projects in the City. Historical average PM peak hour traffic volumes obtained from the City of Federal Way website (www.cityoffederalway.com) at the S 317th St./23rd Ave. S intersection showed a decrease in traffic between 2003 and 2005. The historical average daily PM peak hour traffic volumes at the 28th Ave. S/S. 312th St. intersection showed a growth of -3% per year (actual is 3.2%). The growth factor in the area ranges between a negative value and 3.2% per year. The use of a two percent per year growth factor is reasonable and consistent with past projects in the City. PROPOSED STREET IMPROVEMENTS City of Federal Way The City of Federal Way's "2006 - 2011" Transportation Improvement Plan" list identifies a number of projects in the vicinity of the proposed South Fork Condominiums project. The street improvement projects within the vicinity are as follows: ➢ South 32Oth Street: 8th Avenue South - SR 99. This project is to add HOV lanes, install raised median, underground utilities, and illumination. The cost of this project is $6,191,000. ➢ South 32Oth Street @ 20th Avenue South. This project is to add 2nd left -turn lanes Eastbound and Westbound. The cost of this project is $1,356,000. ➢ SR 99 HOV Lanes Phase 4: SR 509 - S 312th Street. Project is to add HOV lanes and install raised medians. Project cost estimate is $15,500,000. ➢ South 3O4th Street @ 28th Avenue South. This project is to add a North Bound right - turn lane and signal. The cost of this project is $360,000. ➢ South 312th Street @ 28th Avenue South. This project is to add a South Bound right - turn lane. The cost of this project is $124,000. WSDOT We have reviewed the WSDOT website (htto://www.wsdot.wa.gov) for street/road improvement projects in the site vicinity. There appears to be no improvement projects within the site vicinity. TRIP GENERATION AND DISTRIBUTION Definitions A vehicle trip is defined as a single or one direction vehicle movement with either the origin or destination (existing or entering) inside the proposed development. \\En&nee2\C\-Pl.jeIFII,.\2006027-S,,I Fo,k Condominiums-D.n0loon Con,V.d,o,5..nd E.pneenng Fed,,,Iw,AS,,th F,,k,C,,d,,,n,,,,Tl .nEP,,kingd,, JTE, Inc. Mr. Don Olson SOUTH FORK HOMES, LLC May 9, 2006 Page-6- Traffic generated by development projects consists of the following types: Pass -By Trips: Trips made as intermediate stops on the way from an origin to a primary trip destination. Diverted Link Trips: Trips attracted from the traffic volume on roadways within the vicinity of the generator but require a diversion from that roadway to another roadway to gain access to the site. Captured Trips: Site trips shared by more than one land use in a multi -use development. Primary (New) Trips: Trips made for the specific purpose of using the services of the project. Trip Generation The proposed South Fork Condominiums project is expected to generate the vehicular trips during the average weekday, street traffic AM and PM peak hours as shown in Table 2. The trip generation for the project is calculated using trip rates from the Institute of Transportation Engineers (ITE) Trip Generation, Seventh Edition, 2003 for Residential Condominium/Townhouse (ITE Land Use Code 230). All site trips made by all vehicles for all purposes, including commuter, visitor, and service and delivery vehicle trips are included in the trip generation values. The site is currently developed with an existing single family detached housing and warehouse. We did not take into account the trips generated by the existing uses, thus all trips are considered as new. Based on our analysis, the trips generated by the South Fork Condominiums project are calculated to be 16 trips during the PM peak hour. During the PM peak hour 67% of the trips would be entering and 33% would be exiting the development. Trip Distribution Figure 6 shows the site generated traffic assigned to the street system. Trips to and from the site were distributed to the surrounding street network based on the characteristics of the street network, existing traffic volume patterns, the location of likely trip origins and destinations (residential, business, shopping, social and recreational opportunities), expected travel times, and collected traffic data at the driveways. Note: We have applied a distributional shift for the entering and exiting traffic to the south. The shift is due to the right in/out traffic at the S 317th St./Gateway Blvd. S intersection. The distributional shift is shown on Figure 6. \\Engi.e 2\c\—Pr.ja Rlu\2006027 S-h Forks ConEomimum. - Don Olson Con-u—, SounEEngmeering-F,de,,Il.y\SoulhF,,kSC,,d,mini.,,TK,ndP.,kin&d.. .-I JTE, Inc. Mr. Don Olson SOUTH FORK HOMES, LLC May 9, 2006 Page -7- HORIZON YEAR CONDITIONS "WITH" THE PROJECT i Traffic Volumes Figure 7 shows the 2010 PM peak hour traffic volumes "with" the proposed project at the analysis and site access intersection. The site generated PM peak hour traffic volumes shown on Figure 6 were added to the projected background traffic volumes shown on Figure 5 to obtain the Figure 7 volumes. Level of Service Table 1 shows the calculated LOS for the horizon year (2010) "with" and "without" project conditions at the pertinent intersections. The analysis intersections would operate at LOS 'E' or better for both "with" and "without" project conditions, thus meeting City standards. Site Access Access to the site will be via one driveway on 28th Ave. South. The site access intersection is x calculated to operate at LOS 'B' or better and experiences a v/c ratio of less than one thus 1 �G meeting City standard. �1 ❑ We have reviewed the WSDOT Design Manual, May 2001, Figure 910-9a "Left Turn Storage Guidelines (Two Lane, Unsignalized)" for the Site Access intersection (a copy of the WSDOT figure is attached). The data indicates that left turn channelization is not needed for capacity at the site access intersection with 28th Ave. South. Site Access Sight Lines The sight distance/visibility was reviewed. The City uses the AASHTO standards and the posted speed limit to ascertain the adequacy of the sight lines. The American Association of State Highway and Transportation Officials (AASHTO) A Policy on geometric Design of highways and Streets, 2001 Exhibit 9-55 "Design Intersection Sight Distance - Case B1 - Left Turn from Stop" (attached in the appendix) identifies sight distance criteria for a 35 MPH design speed. The stopping sight distance is identified at 250 feet and the entering sight distance is 390 feet for a 35 MPH design speed. The AASHTO criteria for the stopping and entering sight distance standards are met; per visual inspection. Below are photos of the sight visibility at the site access. 1 W�J I , l \\Engineer2\.\--;ed Fibg\2006 027 5— F.- Co d—...,. Oon Olson Conslr —n Sound Engine.ring- F,d,r,l —y\5-h Fork,C.ndominium.11 .a dP,,king d,, -1 ' Mr. Don Olson SOUTH FORK HOMES, LLC May 9, 2006 Page -8- 11 J J i .J J JTE, Inc. As seen above good sight lines exist at the site access intersection; spring vegetation growth could encroach in the sight lines and would need to be periodically pruned PARKING ANALYSIS Parking requirements are governed by the City of Federal Way Municipal Code Sections 22- 1377 Number of spaces - Minimum and 22-1398 Criteria. The required number of parking spaces for an apartment project per FWMC 22-667 is 1.7 stalls per condominium unit. The pertinent sections of the FWMC are attached. Federal Way Municipal Code requires that the 30 - unit South Fork Condominiums provide a minimum of 51 parking stalls, based on 1.7 parking stalls per unit. The proposed South fork Condominiums project proposes to provide 85 parking stalls more than the required 51 parking stalls as calculated above. AGENCY TRAFFIC IMPACT MITIGATION REQUIREMENTS The City of Federal Way requires developments that impact street improvement projects by 10 or more site -generated peak hour trips to participate on street improvements on a pro- rata share basis. The following is taken from the City's Traffic Impact Analysis guidelines: Off -Site Improvements: All improvements shall meet current City standards. Developments impacting City projects as shown in the City's current 6-Year Transportation Improvement Program by 10 or more peak hour trips shall either provide the project or pay a pro-rata share of the project, calculated as the number of new peak hour trips generated by the development divided by the estimated total peak hour traffic volume at the time that phase of the development is completed. If a project has been deemed to be fully funded by the Public Works Director, the pro-rata share will be calculated based on the design engineer's current cost estimate subtracting funding from federal and state grants. If frontage improvements are also provided on a TIP project, the cost of the frontage improvements provided by the q \\Eng-9,2\c\-Prapd Fllm\2006027-S-h Farks ConCominiumc Don 01... C... V Nan S... E Engineering- F,d,,l my\S,,th F—C,,d—niameTlAan NP Ong Eoc �J JTE, Inc. Mr. Don Olson SOUTH FORK HOMES, LLC May 9, 2006 Page-9- development would be subtracted from the cost of the TIP project before calculating pro -rats share of mitigation for off -site improvements. If the development's impacts on a TIP project vary within the TIP project, depending on the operational or safety issue the TIP project is intended to resolve, pro -rats shares may be calculated separately for each segment that is impacted differently by dividing the cost of the TIP project on a per -lineal -foot basis. None of the street improvement projects (as identified in the PROPOSED STREET IMPROVEMENTS section of this report) are impacted by 10 or more site generated PM peak hour trips. SUMMARY, CONCLUSIONS AND RECOMMENDATIONS This report analyzed the traffic impact of the 30-units condo/multifamily development South Fork Condominiums project located at 31408 28th Avenue South on Parcels #0921049148 & #0921049142 in Federal Way. Traffic data was collected at pertinent street intersections identified for analysis. Level of service analyses were performed for existing and projected future traffic volumes, using the collected traffic data, for the "without" project condition. The evaluation of the traffic impact of the proposed project included adding project generated traffic to the future traffic volume projection and calculating the level of service. The "with" project traffic operations were then compared to the "without" project operations. The comparison of traffic operations "with" and "without" the project identified that the project would not cause a significant adverse affect on the operation of the study intersections. Based on our analysis we recommend that the South Fork Condominiums project be allowed with the following traffic impact mitigation measures. ➢ Construct site in accordance with applicable City requirements. No other traffic mitigation should be necessary. Please contact me at (206) 762-1978 or email me at iaketraffic@comeast.net if you have any questions. EXPIRES 123 Sincerely, Mark J. Jacobs, PE, PTOE, President JAKE TRAFFIC ENGINEERING, INC. O-.vs.o6 \\Enginee�2\c\-P�o)ecl Files\2006027 S.-Forks C,nCom---Don Olson C.-t—t—S—d Engmeenng Fe—1 way\S.-Farke C.nd.min,.ms1A.ndP,rkingd,, JTE, Inc. PM PEAK HOUR LEVEL OF SERVICE TABLE 1 SOUTH FORK CONDOMINIUMS - FEDERAL WAY TRAFFIC IMPACT ANALYSIS INTERSECTION APPROACH EXISTING 2010 W/O PROJECT B (19.6) 2010 W/ PROJECT B (19.6) S. 317th St./ Overall B (19.0) 23,d Ave. S S. 312th St./ Overall D (27.3) E (47.9) E (48.7) 28th Ave. S Site Access/ SBLT - A (7.7); 0.00 28th Ave. S WB - — - B (10.9); 0.01 The values shown in parenthesis are the average control delay in seconds per vehicle for the intersection and the volume to capacity ratio (v/c) per approach movement for the site access. The letter is the LOS per the Highway Capacity Manual. \\En&neerz\c P,1j—Fles\2006027-S— Forks C,nd,,,,,,,,- Dan 01... C... - ,Sound Eng ,,mg Federalwy\S,-F,,k,C,nd—n—.T-.dP.,king— VEHICULAR TRIP GENERATION TABLE 2 SOUTH FORK CONDOMINIUMS - FEDERAL WAY TRAFFIC IMPACT ANALYSIS TIME TRIP RATE TRIPS TRIPS PERIOD ENTERING EXITING Residential Condominium/Townhouse (ITE Land Use Code 230, 30 units) JTE, Inc. TOTAL Average Weekday T = 5.86X 88 (50%) 88 (50%) 176 AM Peak Hour T = O.44X 2 (17%) 11(83%) 13 PM peak Hour T = O.52X 11(67%) 5 (33%) 16 Warehouse (ITE Land Use Code 150, 6,984 Sq. Ft.) PM peak Hour T = O.59X 1(35%) 3 (65%) 4 Single -Family Detached Housing (ITE Land Use Code 210, 1 dwelling unit) PM peak Hour T = 1.01 X 1 (63%) 0 (37%) 1 T = trips X = number of units (30 units) A vehicle trip is defined as a single or one direction vehicle movement with either the origin or destination (existing or entering) inside the study site. The above trip generation values account for all the site trips made by all vehicles for all purposes, including commuter, visitor, recreation, and service and delivery vehicle trips \\Eng,,e 2\,\-P,s,d Fdl \2006027-S-h Forks Condominiums-D.n.1—Consvuc S... d Engyneering-Federal way\S,,Lh Fork,C,nd. nip .7M.,dPa ,qd- C EY: ' how .;. � I .I [ f � j - if s h � i AR f site access/28th Ave. S Epp 1i�PH SBLT's - 3 F Total traffic —489 oil 25 20 15 1* 5 (3) D is total alt ne fmm both direvtiom (2) Speeds are posted speeds_ J Left -Turn Storage Gukbeiines (Two -Lane, Unsig lined) Figum 9i'i61a JTE, Inc. i2m Itm sm 1� 7M' aw- am 4W 3W 0 DssiignManaW M2M InmrsemiansAr e Janualy I S Page 91"s \\En&^ee12\C\-Proles Files\2006027- Sduul Forks Condominiums -Don Olson Conavu—n Sound Engm,a g Federalway\Soulk Fo Condammmm Col dParkingdaa Project: South Fork Condominiums Location: 31408 28th Avenue South F Project Site TrIl L 3w Exit IQ �V' p Salg I t NORTH SOUTH FORK CONDOMINIUMS - FEDERAL WAY JTE, Inc. TRAFFIC I M PACT ANALYSIS FIGURE 1 VICINITY MAP t �M� i. . Project: South Fork Condominiums Location: 31408 28th Avenue South NORTH �- wav m ri w N + �` IIIIIII@ICI �I I.��� f=E OFFAL Yo1.o,Y 7CN'MfJ:iUhllE� 'V,RA:t RCyi Ij IF eEFeEF ," eoEouu „a.'v..w.-.a,e�11:N �mrb� Note: An 8.5 x 11" version of the site plan is included with this report SOUTH FORK CONDOMINIUMS - FEDERAL WAY JTE, Inc. TRAFFIC IMPACT ANALYSIS FIGURE 2 PRELIMINARY SITE PLAN .J OPEN SPACE: AREA I: 8�9 SQ, FT. AREA 2: 3,965 SQ. FT. AREA 3: 7,579 SQ. FT, AREA 4: 1,306 SQ.FT. AREA 5: 1.515 SQ FT. TOTAL: 15,184 SQ. FT. OF OPEN RECREATION ARFA PROVIDED 12.000 SQ. FT. REQUIRED: (30 uN[s X 400/ula . 12.000 SQ. FT.) DRIVEWAY SIZE: MINIMUM DRIVEWAY DIMENSIONS: 9'-0' X 20'-0'. MAXIMUM DRIVEWAY DIMENSIONS: 10'-O' X 25'-0' MIN MUM ADA DRIVEWAY DIMENSIONS: 9'-O' X 25'-0' ai iw ai , v �s 1WED A� Y THIS SITE PLAN IS FOR PRELIMINARY STUDY ONLY AND IS NOT FOR CONSTRUCTION. ZONING, CODE, AND JUG Uhl L MOST LIKELY ALTER FINAL CONFIGURATION. THIS DRAWING IS NOT INTENDED TO REPRESENT ANY FINAL SOLUTION IITAMY GIVEN JURISDICTION. i- tam. los C MEN�RECvq 9 wsxava: �I • i TYPE III LAND5CAPING-20' WIDE --I 30 UNITS TOTAL IN 6 SEPERATE BUILDINGS; [INCLUDES TWO ADA UNITS) BUILDING AREAS: 0 BUILDING 1: GROUND LEVEL: 5,014 GROSS SQ. FT, MIDDLE LEVEL 5,014 GROSS SQ. FT. UPPER LEVEL: 5.014 GROSS SQ,FT. TOTAL: 15,042 GROSS SQ. FT, OF BUILDING AREA BUILDING 2: GROUND LEVEL 4,755 GROSS SQ. FT. MIDDLE LEVEL 4,412 GROSS SQ. FT. UPPER LEVEL: 3,592 GROSS SQ. FT. TOTAL: 12,759 GROSS SQ. FT. OF BUILDING AREA BUILDING 3: GROUND LEVEL 3.610 GROSS SQ. FT. MIDDLE LEVEL: 3.610 GROSS SO. FF. UPPER LEVEL: 3,610 GROSS SQ. FT. TOTAL: 10,830 GROSS SQ. FT. OF BUILDING AREA BUILDING 4: GROUND LEVEL: 2,982GROSS SQ. FT. MIDDLE LEVEL 2,982 GROSS SQ. FT. UPPER LEVEL 2,9B2 GROSS SQ. FT. TOTAL: 8.946 GROSS SQ. FT. OF BUILDING AREA 0 BUILDING 5: GROUND LEVEL 3.338 GROSS SO, FF. MIDDLE LEVEL 2.995 GROSS SQ. FT, UPPER LEVEL 2,175 GROSS SQ. FT. TOTAL: 8,508 GROSS SQ. FT. OF BUILDING AREA 0 BUILDING 6: GROUND LEVEL 2,982 GROSS SQ. FT. MIDDLE LEVEL 2,982 GROSS SQ, FT. UPPER LEVEL: 2,982 GROSS SQ, FL TOTAL 8,946 GROSS SQ. FT. OF BUILDING AREA SITE AREA: 73,473 SQ. FT. • TYPE OF CONSTRUCTION: VB OCCUPANCY TYPE: R-2 SLOPES: THERE ARE NO AREAS WITH SLOPES 40 PERCENT OF GREATER ON OR WITH 25 FEET OF THE SITE. qj PARKING: TOTAL EXISTING PARKING STALL COUNT: O PROPOSED PARKING STALL COUNT: 49 REQUIRED, B5 PROVIDED qb EXISTING STRUCTURES: THERE IS A 6984 SQ,FT. WAREHOUSE W/ OFFICES CURRENTLY ON THE SITE, ■ PROPOSED USE: PROPOSED USE FOR ALL STRUCTURES ON THE SITE IS'RESIDENTIAL'. 28TH AVE.S-(TYPE 'K STREET) -- f�l PRELIMINARY SITE PLAN I SD.F, �•v NORTH NOT FOR CONSTRUCTION V) t`D I �j m 0 0) =WZO z v1 o > z O 2 V) } O N O J v m IY a 01 Lu LLJ - + wir. Apr . 31"T+Fi TN�. sr-..�... �a �. — �• ` . _ _7. NORTH 414, H '�-- � •S LEGEND Protect S Ito Approach Lane & t'r ,� �ii► ` Direction .�_.�__- " +•- _ �.,, °'� rit Stop Sign Traffic ' Signal _;I�, f l: "'':S•,316TH L*IV;: ''-�. :J' ►, ' �, Roudabout -- �4 serving the carpool •I+T4�'s�i� r., r #, access ramp JCi 2M King Courtly JTE, Inc. FIGURE 3 Y FWTC -Federal Way Transit Center ' ' 9[!ay K • . - right In/out only`'' T - Transit only ►� _ " ; ?"� Aerial Image obtained from King County IMap - - Property Information SOUTH FORK CONDOMINIUMS TRAFFIC IMPACT ANALYSIS - FEDERAL WAY EXISTING STREET CONDITIONS L _ C I- - - L , • - � s � � pr s - � - ri'. ! aw f N �7r Thursday iii 04.14.05 T s�� 1 �o \t Q S F / 6 F -J `R JT , Inc. FIGURE 4 0 F 1 2 N to Tuesday +1 03.22.05 1645 - L746 kP t. Sf � �r q. .._ i �.� a', i Project kM S Ite t A NORTH -------------------- LEGEND PM peak hour r-0, traffic volume & direction * - Estimated transit trips Aerial Image obtained from King County Map - Property Information SOUTH FORK CONDOMINIUMS TRAFFIC IMPACT ANALYSIS - FEDERAL WAY EXISTING PM PEAK HOUR TRAFFIC VOLUMES . Or -t • i NORTH -------------------- LEGEND PM peak hour —� traffic volume & direction Aerial Image obtained from King County IMap - Property Information JTE, Inc. SOUTH FORK CONDOMINIUMS TRAFFIC IMPACT ANALYSIS - FEDERAL WAY FIGURE 5 PROJECTED 2010 PM PEAK HOUR TRAFFIC VOLUMES W/O PROJECT � � $lef,ft Eakf 20% - 2,1 IL 4 0 ? =T �`_- r. 5� h 20%-2,1 1 i %*4 N 1 143 �1 - , 40 % (entering) - 5 _- - ! 65 % (exiting) - 3 —) L5 % (entering) - 3 - t : Mal i .41h J1 4 Exit 143 �ulgF�y ? 10 % - 1,1 - � 7y . ���✓� 1 1 of 4 2i107 PSCrosah Cwp. Al tigims nsurM. — � _ f I� t Project S [to 10%-1,1 61 �1 XX% trip dstribution percent a PM peak ho NORTH LEGEND PM peak hour —1o. traffic volume & direction Project Trips : 16 Entering: 11 Exiting: 5 JTE, Inc SOUTH FORK CONDOMINIUMS TRAFFIC IMPACT ANALYSIS - FEDERAL WAY FIGURE 6 PROJECT GENERATED PM PEAK HOUR TRAFFIC VOLUMES AND DISTRIBUTION a l 1 a a r F IL Y/ dop7 zi . 4 �VIM, -^ •• -- + NORTH -------------------- LEGEND � 4a ter. `-61b 4b�� + j44Ui! IM 4 Protect 355� 1�� Ae Site PM peak hour d,�o ,y �! 5 o » i.;`. traffic volume 45 Qb A & direction � i�. / `P T- --- ,✓ 4f 70 { t ,• r 40 -•-� �=-�f�. 7�1 � ,yam r 'Jj',_,'�i+� � ,k ��, j r1 + a 1!! R ti r ► M R _ `I ,y g Aerial Image obtained from King County IMap - �.x Property Information 1C32M"Cy'.', JTE, Inc. SOUTH FORK CONDOMINIUMS TRAFFIC IMPACT ANALYSIS - FEDERAL WAY FIGURE 7 PROJECTED 2010 PM PEAK HOUR TRAFFIC VOLUMES W/ PROJECT APPENDIX -1 �J Traffic Count Consultants, Inc. Woodinville, WA 98072 Phone: (425) 861-8866 FAX: (425) 861-8877 Turning Movement Diagram I F50 614 4� 560 54S 317th Street 60 185 125 352 167 d421 113 C4 685 534 Check In: 1333 1219 Out: 1333 Intersection: 23rd Ave S @ S 317th Street Location: Federal Way Date of Count: Thurs 4/14/05 Peak Period: 4:15 P - 5:15 P Checked By: CMW Prepared For: City of Federal Way 0( %HV PHF EB n/a n/a WB 2.7% 0.86 NB 2.8% 0.91 SB 1.8% 0.75 Intersection 2.31/o 0.91 -J Sum _a L ILI Traffic Count Consultants, Inc. Woodinville, WA 98072 Phone: (425) 861-8866 FAX: (425) 861-8877 Vehicle Volume Summary Intersection: 23rd Ave S @ S 317th Street Date of Count: Thurs 4/14/05 Location: Federal Way Checked By: CMW Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Inter Interval 23rd Ave S 23rd Ave S S 317th Street n/a Tota Ending at T L S R T L S R T L S R T L S R 4.15 P 3 7 97 0 4 0 93 31 3 40 0 19 0 0 0 ❑ 287 4:30 P 4 12 113 0 5 0 106 = 1 31 0 19 0 0 0 0 309 4:45 P 6 12 132 0 4 0 107 34 2 28 0 5 0 0 0 0 318 5:00 P 0 21 120 0 5 0 121 25 0 34 0 20 0 0 0 0 341 5:15 P 1 9 195 0 1 0 87 26 2 32 0 16 0 0 0 0 365 5:30 P 1 11 107 0 3 0 93 35 1 32 0 20 0 0 0 0 298 5:45 P 1 13 88 0 0 0 103 29 1 49 0 13 0 0 0 0 295 6:00 P 2 18 94 0 3 0 119 35 0 35 0 8 0 0 0 0 309 6:15 p 0 0 90 0 0 0 100 20 0 30 0 4 0 0 0 0 244 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 P 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 18 103 1036 0 25 0 1 929 263 10 311 0 124 0 0 0 0 276E 4:15 P to 5:15 P Peak Hour Summary Total 11 54 560 0 15 0 1 421 1 113 5 1 125 1 0 1 60 0 0 0 0 133: A roach 614 534 185 0 133' %HV 2% 3%- 3% n/a 2% PHF 0.75 0.91 0.86 n/a 0.9: PEDESTRIANS ACROSS: North South East West Intv'1 Interval; 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 Ped Totals: 0 0 0 0 8 Prepared For: City of Federal way (NO PEDS) TMosbo25 City of Federal Way Location Report 05/08/2006 Report Period: 12/24/2002 to 12/24/2005 Location: 23 AV S at S 317 ST Year 2003 Collision Time Of Case Direction Num Num Hit & Tot Date Collision Number Type of Collision Veh I Veh 2 Fat IniY PDO Run Veil Thu-01/02/2003 10:56 AM 030058 Fixed Object/Parked Vehicle E.>W 0 P l Fri-01/31/2003 07:58 PM 031709 Approach Turn N->E S->N 0 2 Fri-05/09/2003 09:17 PM 03006498 Right Angle S->S S->N 0 P 2 Wed-08/20/2003 01:35 PM 0311740 Right Angle W->N N->S 0 P 2 Thu-OS/28/2003 06:03 PM 0312140 Fixed Object/Parked Vehicle S->N 0 1 1 Number of Collisions: 5 Year 2004 Collision _ Date Mon-05/03/2004 Fri-11/ 19/2004 Number of Collisions: 2 Year 2005 Collision Date Sat-1212412005 Number of Collisions: I Grand Totals: Number of Collisions: Number of Vehicles Involved: Number of Fatalities: Number of Injuries: Number of PDOs: Collision Rate: 0.00 Time Of Case Collision Number Type of Collision 04:15 AM 046165 Fixed Object/Parked Vehicle 08:50 AM 0416107 Rear End Time Of Case Collision Number Type of Collision 09:13 PM 0519115 Sideswipe 8 13 0 (0.00%) 3/2 (37.50%) 5 (62.50%) 014? Pagel Totals: 0 1 3 0 8 Direction Num Num Hit & Tot Veh 1 Veh 2 Fat Inj PDO Run Veh N->E 0 P 1 N->S N->S 0 1 2 Totals: 0 1 1 0 3 Direction Num Num Hit & Tot Veh 1 Veh 2 Fat Inj PDO Run Veh E->N E->N 0 P 2 Totals: 0 0 1 0 2 City of Federal Way Location Report 05/08/2006 Report Period: 05/04/2002 to 05/04/2005 Location: 28 AV S at S 312 ST Year 2002 Collision Time Of Case Direction Num Num Hit & Tot Date Collision Number Type of Collision Veh 1 Veh 2 Fat litj PDO Run Veh Sal-08117/2002 11:26 AM 0211355 Right Angle E->N N->N 0 P 2 Number of Collisions: 1 Year 2003 Collision Date Number of Collisions: I Year 2004 Time Of Case Collision Number T;Ipe of Collision 06:40 PM 0311115 Rear End Totals: 0 0 1 0 2 Direction Num Num HIT tot Veh 1 Veh 2 Fat In,j PDO Run Veh W->E W->E 0 P 2 Totals: 0 0 1 0 2 Collision Time Or Case Direction Num Num Hit& tot Date Collision Number Type of Collision Veh I Veh 2 Fat Inj PDO _ Run Veh Fri-03/05/2004 10:16 AM 043241 Right Angle N->S W-N 0 P 2 Fri-04/02/2004 05:15 PM 04004676 Rear End N->S N->S 0 P 2 Sun-05/23/2004 05:20 PM 047236 Sideswipe W->E W->S 0 P H 2 Sat-08/21/2004 03:45 PM 04011751 Approach Turn W->N E->W 0 P 2 Number of Collisions: 4 Totals: 0 0 4 1 8 1 GG Collision Time Of Case Direction Num Num Hit & Tot Date Fwe-4-05—/04/200-5i0:04 Collision Number Type of Collision Veh 1 Veh 2 Fat Inj PDO Run Veh AM 556313 Right Tingle N->S W->N 0 P 2 Number of Collisions: 1 Grand Totals: Number of Collisions: Number of Vehicles Involved Number of Fatalities: Number of Injuries: Number of PDOs: Collision Rate: 0.00 7 14 0 (0.00%) 0/0 (0.00%) 7 100.00%) Totals: 0 0 1 0 2 City of Federal Way Corridor Report 05/08/2006 Report Period: 02/28/2003 to 02/28/2006 Corridor: 28 AV S between S 317 ST and S 312 ST 28AVSatS317ST Year: 2004 Date Time Of Case Direction Num Num Hit& Tot Collision Collision Number T of Collision Veh 1 Veh 2 Fat kn' PQO Run Veh LiSun-06/06/2004 03:52 PM 04007953 Fixed Object/Parked Vehicle W->N P H I Yearly Totals: Number of Collisio I Totals: 0 0 l 1 ! Year: 2005 Date Time Of Case Direction Num Num Hit & Tot Collision Collision Number Type of Collision Veh 1__ Veh 2 Fat ln' PDO _ Run Veh Tue-10/04/2005 07:44 AM 0514755 Fixed Object/Parked Vehicle W->N I 1 Sun-12/04/2005 11:22 PM 0518055 Fixed Object/Parked Vehicle N->S P 1-1 1 E Yearly Totals: Number of Collisio 1 2 Totals: 0 1 1 1 2 Link Totals: Number of Collision 3 Totals: 0 1 2 2 3 28AN' 5atS312ST Year: 2003 Date Collision Thu-08/07/2003 Time Of Case Collision Number Type.of( 06:40 PM 0311115 Rear End Yearly Totals: Number of Collisio 1 Direction Num Num Veh 1 _Veh 2 Fat Inj W->E W->E _ Totals: 0 0 Hit & Tot Run Vel P 2 1 0 2 Year: 2004 Date Time Of Case Direction Num Num Hit & Tot Collision Collision Number Type of Collision Veh I Veh2 Fat In( 1'l)0 Run Veh Fri-03/05/2004 10:16 AM 043241 Right Angle N->S W->N P 2 Fri-04/02/2004 05:15 PM 04004676 Rear End N->S N->S P 2 Sun-05/23/2004 05:20 PM 047236 Sideswipe W->E W->S P H 2 Sat-08/21/2004 03:45 PM 04011751 Approach Turn W->N E->W P 2 I Yearly Totals: Number of Collisio I 4 Totals: 0 0 4 1 8 Year: 2005 Date Time Of Case Direction Num Num Hit & Tot Collision Collision Number of Collision Veh 1 Veh 2 Fat _ Inj_ PDO_ _Run Veh Wed-05/04/2005 10:04 AM 056313 Right Angle N->S W->N P 2 Wed-08/03/2005 06:47 PM 0511341 Pedestrian/Cyclist Involved E->W N->S 1 1 Tue-09/13/2005 1 1:27 AM 0513634 Rear End 2c7 Page 1 E->W E->W 4 2 w e l INTERSECTION TURN MOVEMENT SUMMARY REPORT T= 2.4 % P= 0.8 Peak Hour 16:35-17:35 729 572 Total Entry Volume 0 650 79 1578 <_0 L' <-214 --- 0 T 'L68 T=0% T=1.2% 0 E-0 P= 0 P= 0.71 0 210 0 504 131 - T=% Trucks By Approach 796 635 Al i 1 P = PHF By Approach T= 1.8 % P= 0.87 File: S37130.TM1 LOCATION; S 317TH STREET AT 23RD AVENUE S FEDERAL WAY Date: 08/27/03 Day: WED Time: 16:00 -18:00 -- - Report Prepared for., CITY OF FEDERAL WAY Surveyed By., TRAFFIC SMITHY, INC 626- 120TH AVENUE NE SUITE B102 BELLEVUE, WA 98027 PHONE: 425-688-7888 FAX:425-688-7784 Report Reviewed by: GC EASTBOUND SOUTHBOUND NORTHBOUND WESTBOUND TIME PERIOD �• —� T L F' 'F ALL 16:00-16:05 0 0 0 0 41 6 0 20 6 12 0 9 94 16:05-16:10 0 0 0 0 49 3 0 33 10 10 0 6 111 16:10-16:15 0 0 0 0 33 2 0 28 10 10 0 5 88 16:15-16:20 0 0 0 0 37 4 0 46 13 13 0 5 118 16:20-16:25 0 0 0 0 40 1 0 49 14 7 0 2 113 16:25-16:30 0 0 0 0 42 2 0 38 14 7 0 3 - 106 16:30-16:35 0 0 0 0 46 5 0 44 4 11 0 0 110 16:35-16:40 0 0 0 0 43 7 0 44 13 8 0 3 '118 16:40-16:45 0 0 0 0 52 7 0 36 8 8 0 4 115 16:45-16:50 0 0 0 0 49 8 0 49 8 11 0 5 130 16:50-16:55 0 0 0 0 52 4 0 35 11 17 0 5 124 16:55-17:00 0 0 0 0 67 6 0 37 10 11 0 5 136 17: -17: 5 0 0 0 0 78 6 0 45 7 8 0 6 150 17:05-17:10 0 0 0 0 66 5 0 45 15 11 0 3 145 17:10-17:15 0 0 0 0 55 10 0 53 13 7 0 6 144 17:15-17:20 0 0 0 0 46 6 0 42 14 16 0 5 129 17:20-17:25 0 0 0 0 45 9 0 41 15 8 0 9 127 17:25-17:30 0 0 0 0 48 8 0 40 7 17 0 13 133 17:30-1 :35 0 0 u u 49 3 U 37 10 24 04 _ 1 17:35-17:40 0 0 0 0 35 3 0 45 14 9 0 4 110 17:40-17:45 0 0 0 0 30 9 0 36 11 10 0 6 102 0 0 0 31 6 0 54 4 1 17:50-17:55 0 0 0 0 28 3 0 34 8 14 0 7 94 17:55-18:00 0 0 0 0 40 4 0 40 7 14 0 7 112 -roTALS 0 0 0 0 1102 127 0 971 246 276 0 126 PHF 0 0 0 0 0.77 0.79 0 0.88 0.78 0.74 0 0.63 % Trucks 0 0 0 0 2.4 3.1 0 2 1.2 1.4 0 0.8 Stopped Buses 0 0 0 0 0 0 0 0 0 0 0 0 Pedestrians 0 0 6 0 9 2848 0.9 2 k . LTraffic Count Consultants, Inc. Woodinville, WA 98072 Phone: (425) 861-8866 FAX: (425) 861-8877 Turning Movement Diagram _ 1 1081 Q �I � 592 489 S 312th Street 410 182 0 S 3121h Street 0 44G I 810 X42 7 320 364 3 41 ~1 35 1 169 1 1 v Q 225 205 Check 43 In: 1164 N LIEZ 30 Out: 1164 Intersection: 28th Ave S @ S 312th Street Location: Federal Way Date of Count: Tues 3/22/05 Peak Period: 4:45 P - 5:45 P Checked By: CMW Prepared For: City of Federal Way 6 %HV PHF EB 0.0% 0.83 WB 0.0% 0.38 NB 0.0% 0.93 SB 0.2% 0.95 Intersection 0.1 % 0.91 TM05b029-1 L - LZ Traffic Count Consultants, Inc. Phone: Woodinville, WA 98072 (425) 861-8866 FAX: (425) 861-8877 Intersection: Location: 28th Ave S @ S 312th Federal way Vehicle Volume Street Summary Date of Count: Checked By: Tues CMW 3/22/05 Time Interval From North on 28th Ave (SB) S From South on (NB) 28th Ave S From East on (WB) S 312th Street From West on (EB) S 312th Street Interval Total Ending at T L S R T L S R T L S R T L S R 4:15 P 2 0 39 94 0 12 48 0 0 0 0 0 0 69 0 4 266 4 : 3 0 P 0 0 35 110 0 3 32 2 0 0 2 1 0 80 2 8 275 4:45 P tl 0 33 108 0 8 35 0 0 1 0 0 0 69 0 8 262 5:00 P 0 0 44 96 0 8 47 0 0 1 1 0 0 68 1 13 279 5:15 P 0 0 55 100 0 12 42 1 0 1 ❑ 0 0 99 0 11 321 5 : 3 0 P 1 0 36 106 0 6 45 0 0 0 0 0 0 78 1 10 284 5:45 P 0 0 45 108 0 9 35 0 0 0 0 0 0 75 1 7 280 6 : 0 0 P 0 0 37 66 0 10 31 0 0 0 0 0 0 72 2 9 247 6:15 P 0 0 13 40 0 1 13 0 0 0 0 0 0 35 0 2 1 104 6 : 3 0 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 3 0 339 848 0 69 328 3 0 3 3 1 0 645 7 72 2318 4:45 P to 5:45 P Peak Hour Summary Total 1 0 182 410 0 35 169 1 0 1 2 1 1 0 0 320 3 1 41 1164 Approach 592 205 3 364 1164 %HV 0% 0% 0% 0% 0% PHF 0.95 0.93 0.38 0.83 0.91 Prepared For: City of Federal Way PEDESTRIANS 1 2 3 4 5 6 7 8 9 10 NortY South East West Totals TM05b029-15p 0 ❑ 0 0 ❑ 0 0 0 0 0 0 0 0 0 0 lJ Traffic Count Page 1 of 1 L L L L S 312th St & 28th Ave S Turn Counted Volume North -bound_ Left_ Turn 111 39 North-bound_Through 1 126 North-bound_Right_Turn41 South-bound_Left tTurn Q1 South-bound_Through 198 South-bound_Right_Turn 1 271 East-bound_Left Turn 1 231 East-bound_Through East-bound_Right_Turn 55 West-bound_Left Turn West -bound Through West-bound_Right_Turn 1J Please Note: Each value represents the number of cars turning during a 1 hour period, measured some time between 4 PM and 6 PM (PM peak period.) rz) httn://www citvnffedPralwav nc/nn/7nnK TABLE 2: IMPACT THRESHOLDS Impact Parameter Threshold Site -Generated Traffic Volume 10 vehicles per hour in both directions Minimum Level of Signalized or All -Way Stop- Controlled Intersection E Service Other Unsignalized Intersection None Maximum Volume/Capacity Ratio (Xc) 1.00, TABLE 3: LEVELS OF SERVICE DEFINITIONS Level of Service Unsignalized Intersections (Average Delay per vehicle in Seconds) Signalized Intersections (Average Delay per Vehicle in Seconds) A < 10.0 < 10.0 B 10.0-15.0 10.0-20.0 C 15.0-25.0 20.0-35.0 D 25.0-35.0 35.0-55.0 E 35.0 — 50.0 55.0 - 80.0 F > 50.0 > 80.0 Source: 2000 Hi hwav Caliaci Manual Deleted: o 07 South Fork Condominiums 05/08/06 S 317th St./23rd Ave. S 12:58:52 Existing (31723EX) SIGNAL2000/TEAPAC[Ver 2.02.121 - Capacity Analysis Summary Intersection Averages for Int # 1 - Degree of Saturation (v/c) 0.37 Vehicle Delay 19.0 Level of Service B ------------------------- Sq 11 1 Phase 1 1 Phase 2 1 **/** ------------------------- I + + + I AI I + + + I ****I /1\ 1<+ + +> I <****1 I I v 1 n ****I I I 1++++ v 1 North 1 <+ * +>I++++> 1 I I + * + I++++ 1 I + * + I v I ------------------------- I G/C=0.509 I G/C=0.424 I 1 G= 61.1" 1 G= 50.9" 1 1 Y+R= 4.0" 1 Y+R= 4.0" 1 I OFF= 0.0% 1 OFF=54.3% I ------------------------- C=120 sec G=112.0 sec = 93.3% Y= 8.0 sec = 6.7% Ped= 0.0 sec = 0.0% ------------------------------------------------------------------------------- I Lane (Width/I g/C I Service Ratel Adj I I HCM I L I Queue I I Group I Lanesl Reqd ------------------------------------------------------------------------------- Used I @C (vph) @E 1Volumel v/c I Delay I S IModel 11 N Approach 17.6 B IRT+TH 1 24/2 10.316 10.509 1 1530 1 1676 1 594 10.354 1 17.8 1 B 1 284 ftI I LT 1 12/1 ------------------------------------------------------------------------------- 10.279 10.509 1 268 1 343 1 57 10.166 1 16.0 1 B 1 50 ftI S Approach 18.8 B -------------- I RT 1 12/1 10.273 10.509 1 628 1 736 1 119 10.162 1 15.8 1 B 1 100 ft1 I TH 1 12/1 10.367 10.509 1 783 1 901 1 443 10.492 1 19.7 1*B 1 431 ftI I IT 1 12/1 ------------------------------------------------------------------------------- 10.240 10.509 1 259 1 333 1 5 10.015 1 14.6 1 B+1 4 ftI E Approach 23.9 C+ IRT+TH+LTI 12/1 ------------------------------------------------------------------------------- 10.307 10.424 1 415 1 551 1 200 10.363 1 23.9 I*C+l 211 £t1 W Approach 20.1 C+ IRT+TH+LTI 12/1 ------------------------------------------------------------------------------- 10.241 10.424 1 495 1 646 1 15 10.023 1 20.1 1 C+1 14 ftl South Fork Condominiums 05/08/06 S 317th St./23rd Ave. S 12:59:01 Existing (31723EX) SIGNAL2000/TEAPAC[Ver 2.02.12] - Summary of Parameter Values Intersection Parameters for Int # 1 - METROAREA NonCBD NETWORK North 0 0 0 0 0 0 0 Def No LOS Targets 35 80 5 NETWORK East 0 0 0 0 0 0 0 Def No 90 100 5 NETWORK South 0 0 0 0 0 0 0 Def No Priorities 0 0 0 0 0 0 NETWORK West 0 0 0 0 0 0 0 Def No NODELOCATION 0 0 Approach Parameters APPLABELS N E S W GRADES 0.0 0.0 0.0 0.0 PEDLEVELS 0 0 0 0 BIKEVOLUMES 0 0 0 0 PARKINGSIDES None None None None PARKVOLUMES 20 20 20 20 BUSVOLUMES 10 10 10 10 RIGHTTURNONREDS 0 0 0 0 UPSTREAMVC 0.00 0.00 0.00 0.00 Movement Parameters MOVLABELS RT TH LT RT TH LT RT TH LT RT TH LT VOLUMES 5 560 54 60 5 125 113 421 5 5 5 5 WIDTHS 0.0 24.0 12.0 0.0 12.0 0.0 12.0 12.0 12.0 0.0 12.0 0.0 LANES 0 2 1 0 1 0 1 1 1 0 1 0 GROUPTYPES Norm Norm Norm Norm Norm Norm Norm Norm Norm Norm Norm Norm UTILIZATIONS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TRUCKPERCENTS 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 PEAKHOURFACTORS 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 ARRIVALTYPES 3 3 3 3 3 3 3 3 3 3 3 3 ACTUATIONS Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes REQCLEARANCES 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 MINIMUMS 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 STARTUPLOST 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 ENDGAIN 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 STORAGE 0 0 0 0 0 0 0 0 0 0 0 0 INITIALQUEUE 0 0 0 0 0 0 0 0 0 0 0 0 IDEALSATFLOWS 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 FACTORS 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 DELAYFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 NSTOPFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 SATURATIONFLOWS 0 3291 673 0 1300 0 1444 1770 653 0 1524 0 Phasing Parameters SEQUENCES 11 ALL PERMISSIVES No No No No LEADLAGS None None OVERLAPS Yes Yes Yes Yes OFFSET 0.00 1 CYCLES 120 120 30 PEDTIME 0.0 0 GREENTIMES 61.13 50.87 YELLOWTIMES 4.00 4.00 CRITICALS 8 5 South Fork Condominiums 05/08/06 S 317th St./23rd Ave. S 12:57:58 Without Project (31723WO) SIGNAL2000/TEAPAC[Ver 2.02.121 - Capacity Analysis Summary Intersection Averages for Int # 1 - Degree of Saturation (v/c) 0.41 Vehicle Delay 19.6 Level of Service B ------------------------- Sq 11 1 Phase 1 1 Phase 2 1 **/** ------------------------- I + + + I AI I + + + 1 ****I /I1 1<+ + +> I <****I I I v IA ****I ! I++++ v 1 North I <+ * +>I++++> I I 1 + * + I++++ I I + * + I v I ------------------------- I G/C=0.509 I G/C=0.424 I G= 61.1" 1 G= 50.9" 1 Y+R-- 4.0" j Y+R= 4.0" 1 OFF= 0.0% l OFF=54.3% ------------------------- C=120 sec G=112.0 sec = 93.3% Y= 8.0 sec = 6.7% Ped= 0.0 sec = 0.0% ------------------------------------------------------------------------------- I Lane (Width/1 g/C I Service Ratel Adj I I HCM I L I Queue I I Group I Lanesl Reqd Used I ------------------------------------------------------------------------------- @C (vph) @E 1Volumel v/c I Delay I S 1Model 11 N Approach 18.0 B IRT+TH 1 24/2 10.327 10.509 1 1531 1 1677 1 658 10.392 1 18.2 1 B 1 320 ftl I LT 1 12/1 10.290 10.509 1 ------------------------------------------------------------------------------- 238 1 309 1 63 10.204 1 16.4 1 B 1 56 ftl S Approach 19.6 B -------------- I RT 1 12/1 10.277 10.509 1 628 1 736 1 132 10.179 1 16.0 1 B 1 112 ftl I TH 1 12/1 10.385 10.509 1 783 1 901 1 489 10.543 1 20.6 l*C+I 490 ftl I LT 1 12/1 10.241 10.509 1 ---------------------------------------------------------------------------------- 233 1 302 1 5 10.017 1 14.6 1 B+1 4 ftl E Approach 24.5 C+ 1RT+TH+LT1 12/1 10.318 10.424 1 ------------------------------------------------------------------------------- 412 1 548 1 220 10.401 1 24.5 I*C+1 236 ftl W Approach 20.1 C+ IRT+TH+LTI 12/1 10.241 10.424 1 ------------------------------------------------------------------------------- 494 1 644 1 15 10.023 1 20.1 1 C+1 14 ftl /o South Fork Condominiums 05/08/06 S 317th St./23rd Ave. S 12:58:07 Without Project (31723WO) SIGNAL2000/TEAPAC[Ver 2.02.12] - Summary of Parameter Values Intersection Parameters for Int # 1 - ` METROAREA NonCBD NETWORK North 0 0 0 0 0 0 0 Def No LOS Targets 35 80 5 NETWORK East 0 0 0 0 0 0 0 Def No 90 100 5 NETWORK South 0 0 0 0 0 0 0 Def No Priorities 0 0 0 0 0 0 NETWORK West 0 0 0 0 0 0 0 Def No NODELOCATION 0 0 Approach Parameters APPLABELS N E S W GRADES 0.0 0.0 0.0 0.0 PEDLEVELS 0 0 0 0 BIKEVOLUMES 0 0 0 0 PARKINGSIDES None None None None PARKVOLUMES 20 20 20 20 BUSVOLUMES 10 10 10 10 RIGHTTURNONREDS 0 0 0 0 UPSTREAMVC 0.00 0.00 0.00 0.00 Movement Parameters MOVLABELS RT TH IT VOLUMES 5 620 60 WIDTHS 0.0 24.0 12.0 LANES 0 2 1 GROUPTYPES Norm Norm Norm UTILIZATIONS 0.00 0.00 0.00 TRUCKPERCENTS 2.0 2.0 2.0 PEAKHOURFACTORS 0.95 0.95 0.95 ARRIVALTYPES 3 3 3 ACTUATIONS Yes Yes Yes REQCLEARANCES 4.0 4.0 4.0 MINIMUMS 5.0 5.0 5.0 STARTUPLOST 2.0 2.0 2.0 ENDGAIN 2.0 2.0 2.0 STORAGE 0 0 0 INITIALQUEUE 0 0 0 IDEALSATFLOWS 1900 1900 1900 FACTORS 0.95 0.95 0.95 DELAYFACTORS 1.00 1.00 1.00 NSTOPFACTORS 1.00 1.00 1.00 SATURATIONFLOWS 0 3291 606 Phasing Parameters SEQUENCES 11 ALL PERMISSIVES No No OVERLAPS Yes Yes CYCLES 120 120 GREENTIMES 61.13 50.87 YELLOWTIMES 4.00 4.00 CRITICALS 8 5 RT TH LT 65 5 140 0.0 12.0 0.0 0 1 0 Norm Norm Norm 0.00 0.00 0.00 2.0 2.0 2.0 0.95 0.95 0.95 3 3 3 Yes Yes Yes 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 0 1293 0 No No Yes Yes 30 01( RT TH LT 125 465 5 12.0 12.0 12.0 1 1 1 Norm Norm Norm 0.00 0.00 0.00 2.0 2.0 2.0 0.95 0.95 0.95 3 3 3 Yes Yes Yes 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1444 1770 594 LEADLAGS OFFSET PEDTIME RT TH LT 5 5 5 0.0 12.0 0.0 0 1 0 Norm Norm Norm 0.00 0.00 0.00 2.0 2.0 2.0 0.95 0.95 0.95 3 3 3 Yes Yes Yes 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 0 1520 0 None None 0.00 1 0.0 0 South Fork Condominiums 05/08/06 S 317th St./23rd Ave. S 12:56:50 With Project (31723WP) SIGNAL2000/TEAPAC[Ver 2.02.121 - Capacity Analysis Summary Intersection Averages for Int # 1 - Degree of Saturation (v/c) 0.41 Vehicle Delay 19.6 Level of Service B ------------------------- Sq 11 1 Phase 1 1 Phase 2 1 **/** ------------------------- 1 + + + 1 I /1\ I<+ + +> 1 <****I I I v I ****I I I I++++ v North I <+ * +>I++++> l I ! + * + I++++ 1 I + * + I v ------------------------- G/C=0.509 1 G/C=0.424 I [ G= 61.1" 1 G= 50.9" 1 I Y+R= 4.0" I Y+R= 4.0" 1 ! OFF= 0.0% I OFF=54.3% I --------------------------- C=120 sec G=112.0 sec = 93.3% Y= 8.0 sec = 6.7% Ped= 0.0 sec = 0.0% ------------------------------------------------------------------------------- I Lane 1Width/1 g/C I Service Ratel Adj I I HCM I L I Queue I I Group I Lanesl Reqd ------------------------------------------------------------------------------- Used I @C (vph) @E 1Volumel v/c I Delay I S IModel 11 N Approach 18.0 B IRT+TH 1 24/2 10.327 10.509 1 1531 1 1677 1 658 10.392 1 18.2 1 B 1 320 ftl I LT 1 12/1 ------------------------------------------------------------------------------- 10.291 10.509 1 238 1 309 1 64 10.207 1 16.5 1 B 1 57 ftl S Approach 19.6 B I RT 1 12/1 10.278 10.509 1 628 1 736 1 135 10.183 1 16.1 1 B 1 115 ftl I TH 1 12/1 10.385 10.509 1 783 1 901 1 489 10.543 1 20.6 1*C+I 490 ftl I LT 1 12/1 ----------------------------------------_---------------------------------------- 10.241 10.509 1 233 1 302 1 5 10.017 1 14.6 1 B+1 4 ftl E Approach 24.6 C+ IRT+TH+LTI 12/1 ------------------------------------------------------------------------------- 10.321 10.424 1 411 1 547 1 224 10.410 1 24.6 I*C+l 241 ftl W Approach 20.1 C+ IRT+TH+LTI 12/1 ------------------------------------------------------------------------------- 10.241 10.424 1 494 1 644 1 15 10.023 1 20.1 1 C+l 14 ftl (L South Fork Condominiums 05/08/06 S 317th St./23rd Ave. S 12:56:57 With Project (31723WP) SIGNAL2000/TEAPAC[Ver 2.02.12] - Summary of Parameter Values Intersection Parameters for Int # 1 - METROAREA NonCBD NETWORK North 0 0 0 0 0 0 0 Def No LOS Targets 35 80 5 NETWORK East 0 0 0 0 0 0 0 Def No 90 100 5 NETWORK South 0 0 0 0 0 0 0 Def No Priorities 0 0 0 0 0 0 NETWORK West 0 0 0 0 0 0 0 Def No NODELOCATION 0 0 Approach Parameters APPLABELS N E S W GRADES 0.0 0.0 0.0 0.0 PEDLEVELS 0 0 0 0 BIKEVOLUMES 0 0 0 0 PARKINGSIDES None None None None PARKVOLUMES 20 20 20 20 BUSVOLUMES 10 10 10 10 RIGHTTURNONREDS 0 0 0 0 UPSTREAMVC 0.00 0.00 0.00 0.00 Movement Parameters MOVLABELS RT TH LT VOLUMES 5 620 61 WIDTHS 0.0 24.0 12.0 LANES 0 2 1 GROUPTYPES Norm Norm Norm UTILIZATIONS 0.00 0.00 0.00 TRUCKPERCENTS 2.0 2.0 2.0 PEAKHOURFACTORS 0.95 0.95 0.95 ARRIVALTYPES 3 3 3 ACTUATIONS Yes Yes Yes REQCLEARANCES 4.0 4.0 4.0 MINIMUMS 5.0 5.0 5.0 STARTUPLOST 2.0 2.0 2.0 ENDGAIN 2.0 2.0 2.0 STORAGE 0 0 0 INITIALQUEUE 0 0 0 IDEALSATFLOWS 1900 1900 1900 FACTORS 0.95 0.95 0.95 DELAYFACTORS 1.00 1.00 1.00 NSTOPFACTORS 1.00 1.00 1.00 SATURATIONFLOWS 0 3291 606 Phasing Parameters SEQUENCES 11 ALL PERMISSIVES No No OVERLAPS Yes Yes CYCLES 120 120 GREENTIMES 61.13 50.87 YELLOWTIMES 4.00 4.00 CRITICALS 8 5 RT TH LT 65 5 143 0.0 12.0 0.0 0 1 0 Norm Norm Norm 0.00 0.00 0.00 2.0 2.0 2.0 0.95 0.95 0.95 3 3 3 Yes Yes Yes 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 0 1290 0 No No Yes Yes 30 RT TH LT 128 465 5 12.0 12.0 12.0 1 1 1 Norm Norm Norm 0.00 0.00 0.00 2.0 2.0 2.0 0.95 0.95 0.95 3 3 3 Yes Yes Yes 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1444 1770 594 LEADLAGS OFFSET PEDTIME RT TH LT 5 5 5 0.0 12.0 0.0 0 1 0 Norm Norm Norm 0.00 0.00 0.00 2.0 2.0 2.0 0.95 0.95 0.95 3 3 3 Yes Yes Yes 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 0 1519 0 None None 0.00 1 0.0 0 log All -Way Stop Control Page 1 of 2 ALL -WAY STOP CONTROL ANALYSIS General Information Wte Information Analyst lChris Valdez en ICo. TE, INC Date Performed 10510812006 Analysis Time Period IPM peak lProject ID South Fork Condominiums (31228Ex) East/West Street: S 312th St. North/South Street: 28th Ave S olume Adjustments and Site Characteristics pproach Eastbound Westbound ovement L T R L T R olume 320 3 41 2 1 0 /aThrus Left Lane 50 50 Approach Northbound Southbound Movement L T R L T R Volume 35 169 1 0 182 410 °/aThrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Configuration LTR LTR LTR LTR PHF 0.95 0.95 0,95 0.95 Flow Rate 382 3 214 622 /o Heavy Vehicles 0 0 0 0 No.Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 1 0.25 Saturation Headway Adjustment Worksheet Prop. Left -Turns 0.9 0.7 0,2 0.0 Prop. Right-Tums 0A 0.0 0.0 0.7 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 hLT-adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 RT-adj -0.6 -0.6 -0.6 -0.6 1 -0.6 1 -0.6 -0.6 1 -0.6 HV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 a dj, computed 6.26 6.26 6.26 6.26 p e arture Headwayand Service Time hd, initial value 3.20 3.20 3.20 3.20 initial 0.34 0.00 0.19 0.55 d, final value 6.26 6.26 6.26 6.26 final value 0.66 0.01 0.37 0.90 ove-up time, m 2.0 2.0 2.0 2.0 ervice Time 4.3 4.3 1 4.3 4.3 capacity and Level of Service Eastbound Westbound Northbound Southbound Li L2 L1 L2 L1 L2 L1 L2 Capacity 554 253 464 686 Delay 20.76 10.47 12.89 36.40 LOS C B B E Approach: Delay 20.76 10.47 12.89 36.40 LOS C B B E intersection Delay 1 27.32 intersection LOS I D All -Way Stop Control Page 1 of 2 ALL -WAY STOP CONTROL ANALYSIS General Information Site Information Analyst chns valdex encylco. TF. INC Date Performed V5IOW006 al sis Time Period JPMpeak EasUWesl Street: S 312th St. NorthlSoulh Street: 28th Ave. S Volume Adjustments and Site Characteristics Approach Eastbound Westbound Movement L T R L T R Volume 355 5 45 2 1 0 /oThrus Left Lane 50 50 Approach Northbound Southbound Movement L T R L T R Volume 40 185 1 0 200 455 %Thrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 Ll L2 Configuration LTR LTR LTR LTR PHI 0.95 0.95 0.95 0.95 Flow Rate 425 3 237 688 /a Heavy Vehicles 0 0 11 0 No. Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 0.25 Saturation Headway Adjustment Worksheet Prop, Left -Turns 0.9 0.7 0.2 0.0 Prop. Right -Turns 0.1 0.0 0.0 0.7 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 hLT-adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT-adj -0.6 1 -0.6 1 -0.6 1 -0.6 1 -0.6 1 -0.6 1 -0.6 1 -0.6 HV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 6.52 6.52 6.52 6.52 Departure Headway and Service Time hd, initial value 3.20 3.20 3.20 3.20 initial 0.38 0.00 0.21 0.61 d, final value 6.52 6.52 6.52 6.52 final value 0.77 0.01 0.44 1.05 Move -up time, m 1 2.0 2.0 2.0 2.0 Service Time 1 4.5 4.5 4.5 4.5 Capacity and Level of Service Eastbound Westbound Northbound Southbound Ll L2 L1 L2 Ll L2 L1 L2 Capacity 549 253 487 688 Delay 28.01 11.05 14.63 71.77 LOS D B B F Approach: Delay 28.01 11.05 14.63 71.77 LOS D B B F Intersection Delay 47.88 Intersection LOS E lS f1tP'//�•�I tnM nrtantc onril Qo+4. r. rrn\(la... o.+\T ..n„1 Ci.+++:....`..\T.....-.-\._r11-1177 !'t ._____ nrinnirtnn� r_. All -Way Stop Control Page 1 of 2 ALL -WAY STOP CONTROL ANALYSIS General Information jSite Information nal sl jahris Valdez Intersection 312128 enc 1Co. TE, INC Juriisdiction Federal Way Date Perrormed 051OW006 nal sis Year with project nalysis Time Period IPMoeak Pr❑'ect 40 South Fork Condominiums (31228tNP) East/West Street: S 312th St. North/South Street: 28th Ave. S olume Adjustments and Site Characteristics roach Eastbound Westbound Movement L T R L T R Volume 355 5 1 46 1 2 1 0 /oThrus Left Lane 50 50 Approach Northbound Southbound Movement L T R L T R Volume 41 186 1 0 202 455 /oThrus Left Lane 50 50 Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Configuration LTR LTR LTR LTR PHF 0.95 0.95 0.95 0.95 Flow Rate 426 3 239 690 % Heavy Vehicles 0 0 0 0 No.Lanes 1 1 1 1 Geometry Group 1 1 1 1 Duration, T 6.25 Saturation Headway Adjustment Worksheet Prop. Left -Turns 0.9 0.7 0.2 0.0 Prop. Right -Turns 0.1 0.0 0.0 0.7 Prop. Heavy Vehicle 0.0 0.0 0.0 0.0 hLT-adj 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 hRT-adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 6.52 6.52 6.52 6.52 Departure Headway and Service Time hd, initial value 3.20 3.20 3.20 3.20 initial 0.38 0.00 0.21 0.61 d, final value 6.52 6.52 6.52 6.52 final value 0.77 0.01 0.44 1.05 ove-up time, m 2.0 2.0 2.0 2.0 Service Time 4.5 4.5 4.5 4.5 Capacity and Level of Service Eastbound Westbound Northbound Southbound L1 L2 L1 L2 L1 L2 L1 L2 Capacity 548 253 489 690 Delay 28.20 11.06 14.73 73.37 LOS D B B F Approach: Delay 28.20 11.06 14.73 73.37 LOS D B B F Intersection Delay 48.74 Intersection LOS E -fita•//(�•\Tlnrnmantc OHA CPi-FITiYC\lh,,,,o,.\T ,,,..,1 Co++; r,.,�\Tom.,1„'�LTI!"7 +,�.� nc/noi�nnc Two -Way Stop Control Page 1 of 2 M TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst Agency/Co- Date Performed Analysis Time Period Chris Valdez JTE, INC 0510812006 PM Reak Intersection Jurisdiction Analysis Year SAI28 Federal Way with project Project Description South Fork Condominiums (28SAWP East/West Street: Site Access North/South Street: 28th Ave. S Intersection Orientation: North-South[Study Period hrs : 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 0 226 8 3 247 0 Peak -Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate, HFR 0 237 8 3 260 1 0 Percent Heavy Vehicles 0 -- -- 0 -- - Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Confiquration TR LT Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 3 0 2 0 0 0 Peak -Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Hourly Flow Rate, HFR 3 0 1 2 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 0 0 Configuration LTR Dela , Queue Len th, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR (vph) 3 5 C (m) (vph) 1333 612 Ic 0.00 0.01 95% queue length 0.01 0.02 Control Delay 7.7 10.9 LOS A 8 Approach Delay -- -- 10.9 pproach LOS -- 8 7 Copyright C 2000 University of londa 1 Rights Reserved Version 4 I c 0 P file•//(�•\Tlnrtiimcntc anr) Qa1-Fn+no�(l.:mor�l .....,1 C.+++:.�....l T,,.....�\._'l1.Tl!'�O a�_� nrinn i..nnr Sat-11/05/2005 01:54 PM 0516582 Rear End W->E W->E ' ' P 2 Yearly Totals: Number of Collisio 4 Totals: 0 5 2 0 7 Link Totals: Number of Collision 9 Totals: 0 5 7 1 17 Totals for Corridor Number of Collisions: 12 Total Vehicles Involved: 20 j Number of Fatalities: 0 (0.00%) i Number of Injuries: 316 25.00%) I Number of PDOs: 9 (75.00% f !� 1_ 1 l� �r L L L Page 2 King County: Assessor Property Characteristics Report rage i or _ 0 King County By law this information may not be used for commercial purposes. Assessor Real Property Records: SOUTH FORK Parcel Number 0921049148 Taxpayer HOMES LLC Account Number 092104914806 Tax Year 2005 Levy Code 1205 Tax TAXABLE Taxable Value NONE OR Status Reason UNKNOWN Appraised Land Value $14,000 Taxable Land Value $14,000 Appraised $69,000 Taxable Improvement Value 1$59,000 Improvement Value Taxpayer SOUTH FORK HOMES LLC Tax Year 2006 Tax TAXABLE Parcel Number Account Number Levy Code Taxable Value Reason 0921049148 092104914806 1206 NONE OR UNKNOWN Appraised Land Value $70,000 Taxable Land Value $70,000 Appraised Improvement Value $3,000 Taxable Improvement Value $3,000 Assessor Property Sales Records: Tip: Use the Recorders Offio�;_ Excise T;'xAffidavits.Rep90 M c-pp mnrP sales records details Sale Date 1/11/2006 Isale Price $656,500 Seller Name GOLDEN EAGLE RESOURCES LLC Buyer Name SOUTH FORK HOMES LLC Sale Date 1/9/2006 Sale Price 1$450,000 Seller Name DERMESTES LLC Buyer Name GOLDEN EAGLE RESOURCES LLC Sale Date 6/21/1996 ISale Price $0 Seller Name PARKER TAMERA Z Buyer Name PARKER THOMAS C Sale Date 6/21/1996 Isaie Price jw0000 Seller Name LIKINS RALPH httn•//www5 mPtrnke.cFnv/rennrt-,/nrnnerty renort.asn?PIN=0921049148 5/1/20 King County: Assessor Property Characteristics Report Fage l of . Buver Name 1PARKER THOMAS C R Parcel F_ District Name FEDERAL WAY Property Name Property Type RESIDENTIAL Present Single Family Plat Name Use (C/I Zone) Water WATER Plat Block P System DISTRICT Plat Lot Sewer System PRIVATE Lot Area 7,200 SgFt Access PUBLIC (0.17 acres) Section/Township/Range SE 9 214 Street ! PAVED Surface 3 Assessor Legal Description Records Account 092104914806 Record 01 Number Number Legal 092104 148 N 60 FT OF W 160 FT OF S 1/2 OF Description NE 1/4 OF SE 1/4 LESS RD Assessor Resldentia[ Building Records, Address 31408 28TH AV S 98003 Building Grade `Average Building number 1 Condition Poor f Bedrooms 2 Year Built 195��dl/2 Baths 1 Year Renovated 0 Baths 0 Total Living SgFt 800 3/4 Baths 0 1st Floor SgFt 800 Stories 1 Half Floor SgFt 0 Single Story Fireplace 0 2nd Floor SgFt 0 Multi Story Fireplace 0 Upper Floor SgFt 0 Free Standing Fireplace 0 Total Basement SgFt 10 Bast ment Garage 0 �It J/ 16 1,ttn•/Aanana75 mPtrnlrr anv/n-nnrtc/nrnnarty rPnnrt acn7P1N=0Q?104914R King County: Assessor Property Characteristics Report Page 3 of Total Finished 0 Attached Garage 0 Basement SgFt SgFt Finished Basement NONE OR Open Porch SgFt 0 Grade UNKNOWN Enclosed Porch 0 Daylight Basement SqFHeat System Floor- Wall Deck SgFt 0 Heat Source Gas Percent Brick Stone 0 This report was generated: 5/1/2006 2:40:36 PM Related on-line reports: King,.,County GIST,_Property..,informati,o FA,Q King -County Assessar;. somit_a. request to_e_orrect this information DD.ES: Permit_App.lications_ Report. King County: districts and Development Conditions. Report King County Assessor;_,eReaf__Pro_p.0rty.._ Report (PUE_fQrmat. require Acrobat) King County Assessor: t3uarter c#�o __ Report (PQE format requires Acrobat) King County Treasury Gperations:_ Property Tarr information Recorders Off ice:..Exc se Tax_Affidav ts_ Report Recorders.Offce: SeaCtet!_.ImageS_9f..pfats, suryeys__and.. other map documents Enter a 10 digit Parcel Number: or Enter an address: Search King_County I GIS_Center I News I Services I Comments I Search By visiting this and other King County web pages, you expressly agree to be bound by terms and conditions of the site. The details. (2D �" i,++_//_nin„G rr trnlrn n mr/r "r vto/"rn vt�r ra"vt ao„' PTNT—(1Q71 OAQ1AR VI /?0I King County: Assessor Property Characteristics Report rage i of . CountyKing Hume I+SiNSreh er�ices Comer�ts 5ea By law this information may not be used for commercial purposes. Assessor Real Property Records: SOUTH FORK Parcel Number 0921049142 Taxpayer HOMES LLC Account Number 092104914202 Tax Year 2005 Levy Code 1205 Tax Taxable Value NONE OR Status TAXABLE Reason UNKNOWN Appraised Land$175,000 Taxable Land Value $175,000 Value Appraised $6,300 Taxable Improvement Value $6,300 Improvement Value Taxpayer SOUTH FORK HOMES LLC Tax Year 2006 Tax TAXABLE -qtat► ►-- Parcel Number Account Number Levy Code Taxable Value Reason 0921049142 092104914202 1206 NONE OR UNKNOWN Appraised Land $175,000 Taxable Land Value $175,000 Value Appraised $6 300 Taxable Improvement Value $6,300 Improvement Value ' Assessor Property Sales Records: Tip: Use the RecordersOffim Excise.Tsx_A ffjA8Vits_R@port to Gee more sales records details Sale Date 1/11/2006 ISale Price 1$656,500 —1 Seller Name GOLDEN EAGLE RESOURCES LLC Buyer Name SOUTH FORK HOMES LLC Sale Date 1/9/2006 Sale Price 1$450,000 Seller Name [DERMESTES LLC Buyer Name GOLDEN EAGLE RESOURCES LLC Sale Date 3/27/1998 Sale Price $0 Seller Name PARKER THOMAS C Buyer Name PARKER THOMAS C+TAMERA Z Sale Date 3/27/1998 ISale Price 1$0 CZv httn_//www5.metrokc.Lyov/renorts/nronerty renort.asti?PIN=0921049142 5/1 /20 King County: Assessor ProperiN Characteristics Report rage t or Seller Name PARKER THOMAS C+TAMERA Z Buyer Name DERMESTES L L C Sale Date 6/21/1996 Sale Price $0 Seller Name PARKER TAMERA Z Buyer Name PARKER THOMAS C Sale Date 6/21/1996 Sale Price 1$180,000 Seller Name LIKINS RALPH Buyer Name PARKER THOMAS C Assessor Parcel Records: District Name FEDERAL WAY TROPICAL Property Property Name FISH IType COMMERCIAL WHOLESALE I Plat Name Present Use Warehouse I _ I Water WATER Plat Block System DISTRICT Plat Lot Sewer System PUBLIC 66,273 SgFfi Lot Area (1,52 acres) Access PUBLIC Section/Township/Range SE 9 21 4 Street Surface PAVED Account 092104914202 Record 101 Number Number Legal 092104 142 POR N 1/2 S 1/2 NE 1/4 SE 1/4 LY Description WLY OF ST HWY LESS N 60 FT OF W 150 FT LESS CO RD Address 31408 28TH AV S 98003 Building Number 1 Building Quality LOW COST Number of Buildings 1 Building Description OFFICE & WHSE 0 httn•/hxnuwi metrnlrr vnv/v-nnrtc/nrnnarty rennrt a,an?PTN=09?.l 049147. 5/1/20 King County: Assessor Property Characteristics Report Page 3 of 'Year Built 1949 Construction Class MASONRY Gross SgFt 6984 Shape Rect or Slight Irreg Net SgFt 16984 ISprinklers IN Stories 1 jElevators Heating System FORCED AIR UNIT Predominant Use STORAGE WAREHOUSE (406) This report was generated: 5/1/2006 2:3&55 PM -<elatea on-line King County GIS: Property.. information TA- _ County. Assessor:_.Submit__a request.tg correct.this. information DDES; Rerrnit.Applicat ons._Report Icing County.:DiStftts d_Qe►reio.�mentConditions Report King_County Assessor:_eReal Property Report (PDF format requires Acrobat King. County Assessor:_ Quarter Section Map -Report (P DF format requires Acrobat) King County Treasury Operations: Property T.ax IntQrmatior� Recorders Office: Excise Tax -Affidavits Report Recorders_ Office; _Scannsd _images_ of._plats, .surveY_s, and.,ofiher_meP_ documents Enter a 10 digit Parcel Number: or Enter an address: Search King County I G_IS_ Center I News I Seryices I Comments j Se_arch By visiting this and other King County web pages, you expressly agree to be bound by terms and conditions of the site. The details. ob httD://www5.metrokc.gov/reports/0ror)erty renort.asn?PTN=092104914? 5/10001 22-1377 Number of spaces - Minimum. (a) Generally. Except as provided in subsection (c) of this section, the number of parking spaces required by FWCC 22-596 through 22. g71 for any particular use is the minimum number of parking spaces required for that use, and the applicant shall provide at least that number of spaces. (b) Guest parking for residential uses. For residential uses, the city may require guest parking spaces in excess of the required parking spaces, if there is inadequate guest parking on the subject property. (c) Exceptions. The number of parking spaces required by this Code for a particular use may be reduced only when the use for which the parking is required: (1) Provides shared parking in accordance with FWCC 22. 4422; (2) Is located in the CC-C or CC-F zones and is accompanied by a traffic demand management plan which, as a condition of project approval, the applicant shall implement. In such an instance, the director may approve reduction of the required number of parking spaces by up to 20 percent. Transportation demand management options which can be considered by the director include, but are not limited to, the following: a. Private vanpool operation; b. Transit/vanpool fare subsidy; c. Preferential parking for ca rpools/va n pools; d. Flexible work -hour schedule; e. Participation in a ride -matching program; or f. Bicycle parking facilities; (3) Is located in the CC-C or CC+ zones, is adjacent to a public street right-of-way classified to allow on -street parking and the applicant makes a one-time contribution to a city fund established strictly to fund development of a on -street parking. The amount of the contribution will be basted on a per stall cost established by the city, and the required number of stalls may be reduced on a one for one basis according to the amount of the contribution paid; (4) Provides a parking study in accordance with FWCC 22-1398(2). (Ord. No. 90- 43, § 2(105.15), 2-27-90; Ord. No. 97-296, § 3, 6-17-97) 22-1398 Criteria. The city may grant or require a modification to the provisions of this article if the city determines, based on the submitted plans and/or other information that the following criteria have been met for modifications to the applicable sections: (1) The parking area design provisions of FWCC 22.1441(b) and 22-1452 may be modified if: a. The modification will not create any vehicular or pedestrian safety problerns; b. The modifications will not affect the ability to provide any property with police, fire, emergency medical and other essential services; and c. One of the following requirements is met: 1. The modification is necessary because of a pre-existing physical condition; or 0�) �n in 2. The modification will produce a site design superior to that which would result from adherence to the adopted standard. (2) A decrease in the required number of parking spaces under FWCC 22-1377 may be permitted if a thorough parking study documents that a fewer parking spaces will be adequate to fully serve the uses. (Ord. No. 90-43, § 2(105.115(3)), 2-2.7-90; Ord, No. 97-296, § 3, G-17-97) 22-667 Attached, detached, stacked dwelling units. The following uses shall be permitted in the multifamily residential (RM) zone subject to the regulations and notes set forth in this section: USE ZONE CHART DIREMONS: FIRST, read down to find use ... THEN, across for REGULATIONS [Minimums Maximums = USE REGULAiIONS1.[>!t Required k. i Required Required Yards t Review Lot Procesg Lot Size Side Coverage Height of Structure Parking Spaces SPECIAL REGULATIONS ANC Front Rear (each) NOTES li 1. The minimum amount of lot area per dwelling unit is as follows: a. In RM 3.6 zones, th subject property must contain least 3,600 sq. ft. of lot area G dwelling unit. b. In RM 2.4 zones, the subject property mi contain at least 2,400 sq. ft. c lot area per dwelling unit. c. In In RM 3.6 RM 1.8 zones, the subject and 2,4 property must contain at least zones, 30 1,800 sq. ft. of lot area per ft. above dwelling unit. 2. The subject average property must contain at least building 2 per 400 sq. ft. per dwelling unit of elevation. dwelling common recreational open In RM 1.8 unit for space usable for many actiwti 7,200 sq. 601/6 in zones, 35 detached At least 10% of this required ft. with a RM 3.6 ft. above units 1.7 open space must be developE n Attached, detached Process density as 20 zooe. 5 ft. 5 ft. 70% in a average building per unit and maintained with children' Play equipment. If the subjeci or stacked dwelling II established ft on the RM 2.4 elevation for property contains four or mor units zoning map zone and 30 ft. attached units, this required open spa( See note 1 1.8 zone above or stacked must be in one or more piece average each having a and wid building dwelling of at least 25 ft, In add on, I elevation units the subject property contains for or more units, at least 50% o detached this required open space mu: dwelling be in one or more pieces eac units See having a length and width of note 4 least 40 ft. 3. No facade of ai structure may exceed 120 ft. length. In addition, any facad a structure that exceeds 50 f length must be modulated a: follows: a. The minimum dep of the modulation is three ft. The minimum width of the modulation is four ft. c. The maximum width of the r- Process I, II, III and IV are described in §§ 22-351- ''2- 336. -1 ;361 - 22 37 0. 22-'1824 .6 - ii, 22•431 - 22-460 respectively. (Ord. No. 90-43, § 2(25.15), 2-27-90; Ord. 97-291, § 3, 4-1-97; Ord. No. 99-333, § 3, Ord. No. 02-424, § 3, 9-17-02) modulation is 35 ft. 4. Except foi detached dwelling units, if any portion of a structure on the subject property is located less than 100 ft from an adjacent low density zone, then either; a. The height of that portion of the structure shall not exceed 15 ft above average building elevation; or b. The facade of that portion of the structure parallel to the low density zone shall not exceed 50 ft, in lengtr 5. Section 22-946 et seq. contains regulations regarding home occupations and other accessories, facilities and activities associated with this use. 6. Refer to Article XVII, Landscaping, for appropriate requirements. 7. For sign requirements that apply to the project, see Article XVIII.8. For community design guidelines that apply to the project, see Article XIX. 9. For provisions th; relate to the keeping of animal see § . et seq. For other information about parking and parking areas, se( § 22-1376 et seq. For details what may exceed this height limit, see § et seq. Ft details regarding required yarc see § et seq. �o. 93-170, § 7(Exh. B), 4-20-93; Ord. No. 1-19-99; Ord. No. 01-385, § 3, 4-3-01; ME M F- O J a 7 a Ln Ml N M O v O O N O� N 11 E2 QUANTITY TAB - THIS SHEET ONLY �� 0 )0 20 SCALE IN METERS G - l l l\ V Y G V G! H I l U N SAVE AND PROTECT, SEE SECTION 1-07.16(2). QUANTITY TAB - THIS SHEET Y SYMBOL ITEM QUANTITY LS1 LS2 LS3 TS1 T2 T3 T4 PLANT SPACING a 4" O.C. COMPACT OREGON GRAPE 86 67 70 Pcq) RED FLOWERING CURRENT 43 34 35 SALAL 86 67 70 WESTERN RED CEDAR 3 PLANT SPACING a 4" O.C. DOUGLAS FIR SALAL 6 12 TALL OREGON GRAPE 6 PLANT SPACING a B' O.C. DOUGLAS FIR 75 74 162 WESTERN RED CEDAR 19 19 46 OTTO LUYKEN LAUREL 3 WILDFLOWER SEED MIX (HA) .05 .05 .12 SOIL AMENDMENT 00) 21 17 17 2 37 361 90 COMPOST (m3) 7 6 6 i 3 3 6 BARK OR WOOD CHIP MULCH (m3) 21 17 17 1 1 12 12 30 ONAL PLANTING ARK OR WOOD CHIP MULCH RINGS DEPTH WITHIN A 300 MM RADIUS ER SEED MIX IS TO REMAIN. T4 E3 STATE OF f WASHINGTON REGISTERED a VY LANDSCAPE ARCHITECT SALLY A.ANDERSON CERTIFICATE NO. 372 DATE: �W. TAT FED.AID PROJ.NO. �w7o Washington State Department of Transportation 1-5 FEDERALHOy DIRECT ACCESS STREET PL2 10 FLASH DESIGNED SY A. SAWICH ENTERED BY A. STYEAS CHECKED BY B. MOCLARE ,a. mown PROD. ENGR. J. MEREO(7 ( gE� �## of SHEETS REGIONAL ADM. L. ENG coxrnacr Ila_ - - PLANTING PLAN DATE DATE REVISION BY C OF En ll.._ W w x Ln Lu (L a U En 0 Z a J N T tD J x / lD 0 N Q TV QI 0 J a 0 aIa)J EXISTING VEGETATION SAVE AND PROTECT, SEE SECTION 1-07.16(2). 1 u , t EXISTING VEGETATION SAVE AND PROTECT, SEE SECTION 1-07.16(2). r _ —;� S__s�__ _ _ _-5 •r .rr rr r r r r _ .. .. _._._.. .._ ..._.. _..._ .... .. � ..:—.L.!:��`i T_:�i�r�=J--•F t z -=-va�_��.z— — _ —=—lr—f�--^� Tr h fIN I NE •0 s 0D NOTE: 1. IN AREA T5, PLACE BARK OR WOOD CHIP MULCH RINGS TO A 75 MM NON -COMPACTED DEPTH WITHIN A 300 MM RADIUS AROUND EACH PLANT. 2. IN AREA T5, WILDFLOWER SEED MIX IS TO REMAIN. QUANTITY TAB - THIS SHEET ONLY SYMBOL ITEM QUANTITY T5 E4 PLANT SPACING a 8' O.C. DOUGLAS FIR 196 WESTERN RED CEDAR 49 - WILDFLOWER SEED MIX (HA) ,13 .30 SOIL AMENDMENT (m3) 96 223 COMPOST (m3) 32 BARK OR WOOD CHIP MULCH (m3) 7 E4 STATE OF WASHINGTON REGISTERED LANDSCAPE ARCHITECT SALLY A.ANDERSON CERTIFICATE NO.372 0 FO 70 DATE: SCALE IN METERS jv FED.AID PROJ.NO. DESIGNED BY A. SAYICH I-5 ENTERED BY A. STYERS 10 WASH Amok Washington State FEDERAL NAY - S 317TH STREET L CHECKED BY B. ►toeLARE a Joe rc HOV DIRECT ACCESS PROJ. ENGR. J. MEREDI7 �. Department of Transportation s« E REGIONAL ADM. L. ENG CONTRACT NO.PLANTING PLAN ' DATE DATE REVISION BY SHEETS C U T �C •U 3 rV En ED J X rn M M 01 co In a1 U W O i1 L L O m 10 W rn to c" H O J d m 2 m M N O v O O N N FED.AID PROJ.NO. �ctiex DESIGNED BY C.LEE r�A ENTERED BY C.LEE 10 WASH � s CHECKED 6Y M.WALLAIA jag WHO" f ROJ . EHGR. J.MEREO i TH 02AO51 REGIONAL ADM. D.OYE (7otmict MD. ",ORAL DATE RAG DATE DATE REVISION —FB—Yl cpmiHuvoto� AM6 Washington State Department of Transportation SOMDTRAIMT 1-5 WV1 FEDERAL WAY - S 317TH STREET NOV DIRECT ACCESS ZSHEET OF WALL VICINITY MAP SHEETS cI 0 v 3 N a1 to J X rn rM M a1 aJ N U w O M T L L 0 m 10 W rn ro al V Ln Ul O J d v O O N cn N 11 U I j N J T 71 N R AP W AA 0 10 20 30 40 SCALE IN METERS FED.AID PROJ.NO. DESIGNED BY C.LEE I I 10 WASH ENTERED BY K.CRONEN CHECKED BY M.YIALLAIA 209 mm%ER PROJ. ENCR. J.MEREDITH 02AO51 REGIONAL ADM. D.DYE =NTAACT go. DATE I REVISION �,acxsk m o x t �tr +�7iTtiR �Q�� r�ORAL 3 hvv a w "r Washington State •/� Deparlment of Transportation ir S«,tmTwAMU 1-S W3 FEDERAL WAY - S 317TH STREET HOV DIRECT ACCESS SHEET 208 WALL PLAN SHEETS 0 0 3 N a1 lD X M M M al a) N U w O N T L L v m v w M Hl a1 V N lD O O J a_ Q- EV T O Q N O IT O O EV aT N O U N m J T. 21N R. 4E. W.M. All Dimensions in meters unless otherwise noted ❑ 10 20 30 40 SCALE IN METERS REGION 1o. No. FED. AI D PROJ . NO. CIt3N .'s y m _ 'r ♦� a `o �� 'r dint + Qx�L t�6 E_ .w au� �Washington State 'If Department of Transportation l� SouxoTRANSIr !_ FEDERAL WAY S 317TH STREET HOV DIRECT ACCESS _ __ _ W4 10 WASH - DESIGNED BY C.LEE ENTERED BY K.CRONEN CHECKED BY M.MALLAI A 'O° ""�" 02AO51 SHEET 29 OF SHEETS PROD. IENGR. J.MEREDITH REGIONAL ADM. D.DYE r NO. WALL PLAN DATE DATE REVISION BY M M M Q1 co Ln UI T L L- a m m M N T N O u U N N J ' I I a -� mo co v •.--•--— — . j II ' I } 0to o m '— 0 w Ln oti m fn i in en z¢a o O � O o ! rN P mM oo+_• w! T O: -+ n O N d MrQOI m r M m. .--, N M V' .-. N I`rf ..•. N �M ..-. N IM N ..-� I N M .� N IM .-. P 'Q 'Q C Y Ml S' 4 4 Q P 145 o J` a ¢— T -j- 1145 1 1 _ �p ,..,; In - W U'W - U - W •W U IW IW u 1w IW u IW u IW CJ W u W W p] W M k I 143 +aci` 143 f III I I i 141 i II i I I -14 SPIER N . 2 1139 i 137 137 f 135 I ' � i I 1 + !_.__ i - --� --135 _ _ _ ' 133 I ! ! i TOP WA L AT CURB LIE 70F' OF SE_W TRAFFIC 8 IRRIER 133 - --- EXISTING C OUND I l I 4 1+..10 x I 1+ 7 30 1+ 510 ' 1+ 70 T 1 1 1 + 90 + 1 1 U 1+130 8 i 1+850 B 1 J I J i {II I m W E 1 N m d I r' o ... z .... V ._. .... ... v ... ¢ t'j p cp .-. no N Ilfl Ir.'1 Q1 iIIP �N ID H W N z J Ul O 4 co IIn m O 12 O IY- O 'Q N .+ O:Ln 130 _ J_ O a7 ID 1- P O O iN Irn m O P cn C3 P LLN 3 M N N IN 8 N O N . O p O'O _ 01 - 5 z QYC M 'Q m m P: I P N M o . i-9- Nm ITEM DESCRIPTION QUANTITY D. 2B UNDERORAIN PIPE 150mm DIAN. STRUCTURE EXCAVATION CL. B INCL. HAUL SHORING OR EXTRA EXC. CL. B W GRAVEL BACKFILL FOR DRAIN STRUCTURAL EARTH WALL BACKFILL FOR STRUCTURAL EARTH WALL INCL. HAUL 4746m 3788m] SEW TRAFFIC BARRIER 128m llim + + + + + + + + Gtl . i N . y'OdP U LA cc U41 ULLI U w u w Cj W Uui U w ILJ u IW u1d UIW O�- o .- o O J U a I 145 o3zIn 145 UUZLa� NOTIS: i WmW 143! 1 ! I 4-3 1. WALL 1--_MBEDLNT 9HALL 3E A I..IINIMUA OF 1 � I I I I 0.61 i+4E TER... OR 1 ❑ PERCENT • F WALL HEI�li7 , l I WHICHEVER IS GREATER. 141 I _ 1 ! 41 _ FOR-•J NE7-I0N -S(3 _EA -1-13*;- PIER N . 2 �— - SEE IfS AND' ILL MINAT [ON P ANS. 139 1 9 FFSEfS ARE A UREA 0 WALL FA ' ELEV NONs ARE CALLED AT CURB LI VE. 137 - -- -- - -- -- --- ; - -_ I - 137 I r TOP OF SEW TRAFFIC BARRI R 'TOP OFI WALL DOTIN E ISTIN CROUN]J � T iP OF HALL A1� CURB �_INE 1 —13 5 135_ 1+530 1+950 1+ 70 1 9190 j 2+ 110 2+ 130 2+ 150 — -- —_ _ �WA L1-iiao .1&-�B - AL.- DI iENSI )NSN METERS UNLEiS O'HERW'[SE TOTE .A.D.oF 1938 "LNo. STATE FED.AIO PROJ.NO. actaN DESIGNED BY C.LEE 10 WASH MAP State I�5 WP2 ENTERED BY C. LEE -i A Department of Transportation FEDERAL WAY - S 317TH STREET CHECKED BY M.WALLAIA im wumun ;l HOV DIRECT ACCESS SHEET PROJ. ENGR. J.MEREDITH LMAOSl •�'�o+sip*`'��� )� ZII `°"lamer no. �,0x"` WALL PROFILES REGIONAL ADM. D.OYE $gir�oTw>,Nnt DF DATE DATE REVISION I BY Lo nva°• SNEETS m m REUSE OF DOCUMENTS OWNER: SOUTH FORK HOMES LLG P. O. BOX 330 SUMNER, WA 38.330 T: (253) 902-93.31; F: (253) 735-0308 ARC,HITECT : J O N GRAVES ARCHITECTS �t PLANNERS PRINCIPAL IN CHARGE: JON GRAVES PROJECT CONTACT: JOHN F. WHITE 3110 R U ST0 N WAY S U 1 TE D TAG O r`'IA, WA 38402 7: (253) 272-4214; F: (253) 272-4218 E-I"IAIL : jwhite@jgarchs.com SOUND ENGINEERING INC. PROJECT CONTACT: I EAH D U N STO N 1010 PACIFIC AVE, SUITE OOG TAG O I`'IA, WA 0840 2 T: (253) 573-0040 : F: (253) 573-0142 E-I"4w1AIL: leah@soundenginc.com CONTRACTOR: GIZIMSTAD CONSTRUCTION PROJECT CONTACT: RON GRIMSTAD 21842 148TH AVE SE KENT, WA 98042 T: (253) G31-70OG F: (253) ro39-0852 E-MAIL 31408 28TH AVE E FEDEPw4,AL WAY, WA 38003 VICINITY MAPNORTH0 PROJECT INFORMATION GOVERNING JURISDICTION: CITY OF FEDERAL WAY WA GOVERNING CODES: I RC 2003, WSEG 2002, UPC 1-907 ZONING [DISTRICT: RM 2.4 (RESIDENTIAL MULIFAMILY) CONSTRUCTION TYPE: V N NUMBER OF FLOORS: (3) THREE FLOORS DRAWING INDEX Tl COVER SHEET A1.0 PROPOSED SITE PLAN A2.0 1ST FLOOR PLAN A2.1 2ND FLOOR PLAN A2.2 3RD FLOOR PLAN A3.0 BUILDING ELEVATIONS A3.1 ENERGY ENVELOPE WA. STATE ENERGY CODE; WAG 51-11; PRESCRIPTIVE METHOD FOR GROUP "R" OCCUPANCY, CLIMATE ZONE 1 ; OPTION VI (2) LEGAL DESGRIP71ON ABE3REVICATIONS: SYME30L[D OUBLE OUBLE PANE INSULATED "U" = 0.400 PROVIDED; 0.450 PRESCRIBED TAX PARCELS: A'- 092104-9148; 'B' - 0J21040142 OVERHEAD (SKYLITES : DOUBLE PANE INSULATED "U" = 0.400 Parcel A: ABC AGGREGATE BASE COURSE F.O.S.W. FACE OF STEM WALL WH WATER HEATER DETAIL SYMBOL PROVIDED; 0.68 PRESCRIBED 0-92104142 POR N 1/2 S 1/2 NE 1/4 SE 1/4 LY ADJ. ADJUSTABLE GWB GYPSUM WALL BOARD WRGWB WATER RESISTANT DOORS: MINIMUM "U" = 0.200 PROVIDED; 0.400 PRESCRIBED WLY OF 5T H�/Y LESS N GO FT OF W 150 FT LESS GO BD BOARD HT. HEIGHT ? DETAIL NO. OR LETTER GYPSUM WALL BOARD SHEET A? PERIMETER WALLS: EXT. ABOVE GRADE = R-21; INT. BELOW GRADE _ _ RD.B��T. BOTTOM INSTAL. INSTALLATION WD WOOD ' R-15; INT. ABOVE GRADE = R-15 Parcel 'B': CLG. CEILING MANUF. MANUFACTURER W WASHER SECTION SYMBOL CEILING: R-30 VAULTED R-38 PLENUM O J2104148 N ro0 FT OF W 150 FT OF S 1/2 L CENTER LINE MTL. METAL W/ WITH WALL ABOVE GRADE: R-21; INT. WALL ABOVE GRADE: R-21, EXT. WALL OF NE 1/4 OF 5E 1/4 LESS RD. GLR. CLEAR MIN. MINIMUM ? DETAIL NO. OR LETTER BELOW GRADE: R-10 GLO. CLOSET N.T.S. NOT TO SCALE A?.? SHEET FLOOR: R-25; SLAB ON GRADE; R-10 COL. COLUMN O.C. ON CENTER COMP. COMPOSITION O.T.S. OPEN TO STRUCTURE INTERIOR ELEVATION SYMBOL GONG. CONCRETE PT. PAINT DETAIL NO. G NE I FAL. NOTES: GONT. CONTINUOUS PWD PLYWOOD2-------SPEGIFIG G.J. CONTROL JOINT P.T. PRESSURE TREATED ? DRAWING NUMBER 1. THE CONTRACTOR 15 RESPONSIBLE FOR FAMILIARIZING HIMSELF WITH THE DTL. DETAIL R RANGE A5.1 SHEET CONTENT OF THESE DRAWINGS PRIOR TO PROCEEDING WITH THE WORK. DW DISH WASHER REF. REFRIGERATOR 4 2. IN THE EVENT THE CONTRACTOR FINDS A CONFLICT OR DISCREPANCY WITH D DRYER REINF. REINFORCED DOOR I.D. SYMBOL THESE DRA*MINGS, THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY IN P;R0JEC;7� DBL. DN DOUBLE DOWN SIM. SCE. FT. SIMILAR SQUARE FEET DOOR NUMBER WRITING. SHOULD THE CONTRACTOR PROCEED WITHOUT NOTIFYING THE D.S.D DOWNSPOUT STL STEEL REFER TO SHEETA6.0. ARCHITECT OF SUCH CONFLICT THE CONTRACTOR SHALL BE PROCEEDING 1� NEW 3-LEVEL, WOOD FRAMED, 4,522 SQ. FT. SINGLE E.O.S. EDGE OF SLAB STRUGT. STRUCTURAL ROOM I.D. SYMBOL AT HIS OWN RISK OF ASSOCIATED LIABILITY. E. EQUAL TEXT TEXTURE 3. THESE DRAWINGS SERVE TO REPRESENT DESIGN INTENT AS DIRECTED BY FAMILY RESIDENCE EQUIV. EQUIVALENT T � G TONGUE AND GROOVE ROOM NAME Roots NAME THE OWNER � COMPLIANT WITH GOVERNING JURISDICTIONAL LAW. IN NO WAY 2) NEW PATIO/ TERRACE/ BALCONY EXT. EXTERIOR TYp. TYPICAL SHALL THESE DRAWINGS SERVE TO DICTATE METHODS OF CONSTRUCTION F.O.G. FACE OF COLUMN U.N.O. UNLESS NOTED OTHERWISE WALL TYPE SYMBOL RELATIVE TO ADHERENCE TO EITHER. IT IS THE CONTRACTOR'S $- OWNERS Q3 NEW LANDSGAPING/ SITE IMPROVEMENTS/ VEHICLE F.O.S. FACE OF STUD WC WATER CLOSET WALL TYPE NO. RESPONSIBILITY TO WORK WITHIN THE PARAMETERS OF THE AGENCY ACCESS $- PARKING AROUND WORK AREA REFER TO SHEETAG.O. APPROVED DOCUMENTS TO MAINTAIN THE INTEGRITY OF THE DESIGN INTENT AND AGENCY COMPLIANCE. EXT. WINDOW TYPE SYM. 4. ENERGY ENVELOPE TO REMAIN WITH SUPPLEMENTAL ENHANCED IN[R 'WEI CHARACTERISTICS C@ PERIMETER WALLS AND STOREFRONT. REFER TO WALL WINDOW TYPE LETTER TYPES AND STOREFRONT CALLOUTS. FEB Q 9 2006 NOT FOR CONSTRUG`�'�� A THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS INSTRUMENTS OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF JGAP AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE OR iN PART WITHOUT THE WRITTEN AUTHORIZATION OF JGAP. AN mIm PROJECT: 0547 CONTENTS: TITLE PAGE DRAWN BY: JFW DATE 28 JANUARY'06 REVISIONS: FILE 0547 A1.0 m m REUSE OF DOCUMENTS 5 7 0 N 70 APPROXII" IATE DISTANCE I PRELI I"-II NARY SITE PLAN 5CALE: 1 ' - 20'-0" THIS SITE PLAN IS FOR PRELII`'IINARY STUDY ONLY AND IS NOT FOR CONSTRUCTION. ZONING, CODE, AND JURISDICTIONAL ISSUES WILL 1`1057 LIKELY ALTER FINAL CONFIGURATION. THIS DRAWING IS NOT INTENDED TO REPRESENT ANY FINAL SOLUTION IN ANY GIVEN JURISDICTION. al III n1k I/ At')C AC.. ® BUILDING 1: GROUND LEVEL: 4,772 GROSS SQ. FT. MOD LE LEVEL. 4,772 GROSS SQ. FT. UPPER LEVEL. 4,772 GROSS SQ. FT. TOTAL: 14,316 GRO55 SQ. FT. OF BUILDING AREA 13, o ;aF ololBUILDING 2. D GROUND LEVEL: 2,881 GROSS SQ. FT. `- MIDDLE LEVEL: 2,881 GROSS SQ. FT. UPPER LEVEL: 2,881 GROSS SQ. FT. TOTAL: 8,643 GROSS SQ. FT. OF BUILDING AREA BUILDING 3: GROUND LEVEL: 2,881 GROSS 5Q. FT. Do 5F - MIDDLE LEVEL: 2,881 GROSS SQ. FT. ,,Y AREA UPPER LEVEL: 2,881 GROSS SQ. FT. I 1 TOTAL: 8,643 GROSS SQ. FT. OF BUILDING AREA z BUILDING 4: w z GROUND LEVEL: 2,881 GROSS SQ. FT. MIDDLE LEVEL: 2,881 GROSS SQ. FT. 0 o j UPPER LEVEL: 2,881 OR055 SQ. FT. 0) ° U TOTAL: 8,043 GROSS SQ. FT. OF BUILDING AREA �3 1 BUILDING 5: GROUND LEVEL: 2,881 GROSS SQ. FT. CAI z MIDDLE LEVEL: 2,881 GROSS SQ. FT. CID UPPER LEVEL: 2, 881 GROSS SQ. FT. w TOTAL: 8,643 GROSS SQ. FT. OF BUILDING AREA �c o I BUILDING <o: W GROUND LEVEL: 3,345 GROSS SQ. FT. MIDDLE LEVEL: 3,345 GROSS SQ. FT. UPPER LEVEL: 3,345 GROSS 5Q. FT. I V_ TOTAL: 10,035 GROSS SQ. FT. OF BUILDING AREA Z '. -1 _11�*F • SITE AREA: 72,50-9 SQ. FT. TYPE OF CONSTRUCTION: VB s y; OCCUPANCY TYPE: R-2 i ERE ARE NO AREAS WITH SLOPES 40 PERCENT '. /'1 t'— �^^ 1^� T'— A Tt�' 1� /'1 I� i r11�"7 ♦ ♦ n-ri i � r-- r-r r-r � .— -r� � .� r+ ��-.� 40 TOTAL EXISTING PARKING STALL COUNT. 0 PROPOSED PARKING STALL COUNT. 52 THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS INSTRUMENTS OF PROFESSIONAL SERVICE. ARE THE PROPERTY OF JGAP AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN AUTHORIZATION OF JGAP. cl r lO ;61 � cl r �Qcli OL U cv Q � O)l o LLJ 0 TL U1Ld Z � Z k� Q TL Qci3 3oQ �m3 QJ w LY C) w 0 W Lil APPROXIMATE DISTANGEl I THERE 15 A ro-984 SQ.FT. WAREHOUSE W/ OFFICES CURRENTLY ON THE SITE. PROJECT: 0547 i CONTENTS. - PROPOSED USE FOR ALL STRUCTURES ON THE SITE 15 PRELIMINARY SITE PLAN "RESIDENTIAL". DRAWN BY JFW I DATE 28JANUARY'Oro I REVISIONS: I i FILE 0547 AI.O Scale in Feet SCALE: 1 "=20' NORTH Sheet- RECEIVE D A100 C7RUGITY OJF FEDERAL WA LQ1NG CREPT. mm REUSE OF DOCUMENTS UNIT AREA: � UNIT SHOWN: 157 FLOOR: 121 GROSS SQ. FT. (GARAGE): 598 GROSS SQ. FT. 2ND FLOOR: 679 GROSS SCE. FT. 3RD FLOOR: ro73 GROSS SQ. FT. � TOTAL: 1,47.E GROSS SQ. FT. OF UNiTAREA • (TOTAL: 19056 GROSS SQ. FT. OF UNITAREA W/ GARAGE) THESE FLOOR FLANS AIRE FOP, PRELIi IINA2Y STUDY ONLY AND ARE NOT INTENDED AS GONSTRUGTION DOGUr-IENTS IN ANY WAY. ZONING, CODE, AND JU1215DICTIONAL ISSUES WILL MOST LIKELY ALTER FINAL CONFIGUI,ATION. THESE DRAWINGS ARE NOT INTENDED TO REPRESENT ANY FINAL SOLUTION IN ANY GIVEN JURISDICTION. now G 10K 0 0 �n 5-17 x 41'-0" PREL.I r- I I NARY 15T FLOOR PLAN SCALE: 1/4" -1'-O" F.O.S. 0 O O N 4 15-11" x 41'-0 0 WA 0 AN THIS DOCUMENT, AND THE IDEAS AND DESI MS ANCORKR970 HOE EW. AS INSTRUMENTS OF PROFESSIONAL SERVICE. ARE THE PROPERTY OF JGAP AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN AUTHORIZATION OF JGAP. ff Ci Ci aCi J Ln -ALL T- > CA \7 Q ^�' J loci o �n )U 1 Q Ll �fi W o co � O TL z ui o Z 3w� o= TL Q�3 3oQ W C) w W Lu �Im PROJECT: 0547 CONTENTS: PRELIMINARY SITE PLAN DRAWN BY: JFW DATE 28 JANUARY'06 REVISIONS: FILE 0547 A2.0 m.m Sheet A200 0 UNIT AREA: UNIT SHOWN: 1ST FLOOR: (GARAGE): 2ND FLOOR: 3RD FLOOR: 121 GROSS SQ. FT. 508 GROSS SQ. FT. G73 OR05-5 SCQ. FT. 670 GROSS SQ. FT. � TOTAL: 1,47.E GROSS SQ. FT. OF UNIT AREA � (TOTAL: 1,356 GROSS SQ. FT. OF UNIT AREA W/ GARAGE) THESE FLOOR PLANS AIRE FOP, PlRELIMINARY STUDY ONLY AND ARE NOT INTENDED AS CONSTRUCTION DOCUI"IENT5 IN ANY WAY. ZONING, GODS, AND JURISDICTIONAL ISSUES WILL MOST LIKELY ALTER FINAL CONFIGURATION. THESE D1:;�AWINGS ARE NOT INTENDED TO REPRESENT ANY FINAL SOLUTION IN ANY GIVEN JURISDICTION. P2ELI r 11 NARY 2ND FLOOR PLAN SCALE: 1/4" i T-0" RECEIVED CITY OF FEDERAL WAY NOT FOR C;ON s7RUC;-�'� , mm REUSE OF DOCUMENTS THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS INSTRUMENTS OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF JGAP AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN AUTHORIZATION OF JGAP. 9 m m PROJECT: 0547 CONTENTS: PRELIMINARY SITE PLAN DRAWN BY JFW DATE 28 JANUARY'06 REVISIONS: FILE 0547 A2.1 mm REUSE OF DOCUMENTS THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS INSTRUMENTS OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF JGAP AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN AUTHORIZATION OF JGAP. mIm PROJECT: 0547 CONTENTS: PRELIMINARY 3R1) FLR. PLAN DRAWN BY JFW DATE: 28 JANUARY'00 REVISIONS: FILE 0547 A2.2 P2EL1 I`'I I NARY 28TH AVE. ELEVATION SCALE: 1/4" -1'-O" BUILDING #5 THESE, EL_EV 70NS ARE FOR PRELT UNARY STUDY ONLY AND ARE NOT INTENDED AS CONSTRUCTION DOCUI IEN75 IN ANYWAY. ZONING, CODE, AND JURISDICTIONAL ISSUES WILL I" IOST LIKELY ALTER FINAL CONFIGURATION. THESE DRAWINGS ARE NOT INTENDED TO REPRE5ENT ANY FINAL SOLUTION IN ANY GIVEN JURISDICTION,. PARKING COURT ELEVATION SCALE: 1/4" -1'-O" BUILDING #5 TOP OF ROOF @ 30--0" TOP OF SUBFLOOR @ 18'-0" TOP OF PLATE @ F- -*711-1/2" ,gkTOP OF SUBFLOOR @ 8' 11• TOP OF PLATE @ 8' 1-1/8" ,mk5UBFLOOlR @ 0'-0" ;287H AVENUE S. @ 4- 0" 4 TOP OF ROOF @ 30'-0" TOP OF SUBFLOOR @ TOP OF PLATE @ 1711-1/2" ,gkTOP OF SUBFLOOR @ 8' 11• TOP OF PLATE @ 8' 1-1/8" SUBFLOOR @ 0'-0" ;28TH AVENUE S. @ 4- 0" -v NOT FOR C;ONSTRU(:5''laY REUSE OF DOCUMENTS THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS INSTRUMENTS OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF JGAP AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN AUTHORIZATION OF JGAP. oi w Q Q 3 Q 3 W 0 w PROJECT: 0547 CONTENTS: PRELIMINARY ELEVATIONS DRAWN BY JFW DATE 28 JANUARY 03 REVISIONS: FILE 0547 A3.0 mm TOP OF ROOF @ 30'-0" TOP OF SUBFLOOR rL @ _L TOP OF PLATE 1711-1/2" T0P0FSUBFL00RCc)eL 8' 11-3/8" TOP OF PLATE @ 8' 1-1/8" SUBFLOOR @ O'-C" 28TH AVENUE S. @ -1' - 0" LEFT ELEVATION SCALE: 1/4" = 1'-0" BUILDING #5 THESE ELEVATIONS ARE FOR PRELIMINARY STUDY ONLY AND AIRE NOT INTENDED AS CONSTRUCTION DOCUMENTS IN ANY WAY. ZONING, CODE, AND JURISDICTIONAL ISSUES WILL MOST LIKELY ALTER FINAL CONFIGURATION. THESE DRAWINGS ARE NOT INTENDED TO REPRESENT ANY FINAL SOLUTION IN ANY GIVEN JURISDICTION. RIGHT ELEVATION REUSE OF DOCUMENTS THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS INSTRUMENTS OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF JGAP AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN AUTHORIZATION OF JGAP. 0) w O T z 3 0 V_ SCALE: 1/4" = T-O" BUILDING #5 1 >__ RECEIVED F F9 0 9 ?006 CITY OF FEDERAL WAY QEPT NOT FOIE C;ON TRUct'nN 21, m O 0 z O F- z z m m PROJECT: 0547 GONTENTS. PRELIMINARY ELEVATIONS DRAWN BY. JFW DATE 28 JANUARY '06 REVISIONS: FILE 0547 A3.1