Loading...
23-102598City.of Federal Way I Community Development Dept. FILF". 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: GREENE Project Address: 829 SW 349TH WAY Project Description: REPLACE GAS FURNACE ADD AC Electrical Permit #:23-102598-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 132174 0560 Owner Applicant Contractor JAN GREENE MARK TODDPUYALLUP HEATING & A/C PUYALLUP HEATING & A/C 829 SW 349TH WAY 130 15TH ST SE (ELECTRICAL) FEDERAL WAY WA PUYALLUP WA 98372 PUYALHC821N2(8/29/24 98023-8445 130 15TH ST SE PUYALLUP WA 98372 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes -rival Fixtures Circuits - Residential 2 Thermostat 1 PERMIT EXPIRES Monday, 13 November, 2023 Permit Issued on Wednesday, May 17, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of o Ntlgto and thekGO of Federal Way. Owner or agent: N r Date: CITY or _�k. Federal Way THIS CARD IS TO RE1L-U\ O\-SITE Construction Inspection Record INSPECTION REQUESTS: (2-3) S35-30>0 Scheduled inspections ma,- be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check -%ith v ouu inspector if you are unsure about any of the inspections or the inspection sequence- On -going inspections are logged on the back of thus card. ELECTRICAL El By UFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date 0 By Slab/Concrete Floor (4255) Approved to place concrete Date r By Pool Bonding (4195) Approved Date ❑ By Temporary Power (4275) Approved Date ❑ BY Service (4235) Approved Date By Feeders/Sub-panels (4045) Approved Date ❑ By Rough Electrical (4225) Approved Date ❑ By Ceiling Cover (4020) Approved Date El Final - Electrical (4055) pproved By Date 11 1-�U MECHANICAL 0 Mechanical Rough -in (4165) ❑ Gas Piping (4125) 0 -Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING Q Plumbing Groundwork- (4190) ❑ Rough Plumbing (4230) 3❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date