23-105098Mechanical
City of Dmederal Way Permit #:23-105098-00-ME
Community Developent Dept. ,
33325 8th Ave S
Federal Way, WA 98003 i Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: PALISADES AT DASH POINT UNIT 03-A
Project Address: 31819 48TH CIR SW Parcel Number: 6613200390
Project Description: gas furnace replacement
Owner
Applicant
Contractor
DARLENE PHILLIPS
TAYLER MANNINGPACIFIC HEATING &
PACIFIC AIR SYSTEMS (GENERAL)
31819 48TH CIR SW UNIT 3-A
COOLING
PACIFAS093KA (9/8/25)
FEDERAL WAY WA 98023
8607 DURANGO ST SW SUITE A
8607 DURANGO ST SW
TACOMA WA 98499
TACOMA WA 98499
Additional Permit Information
Mechanical Work Valuation? .................................. 8035 Is this an Online or O.T.C. application?.................. Yes
Mechanical Fixtures I
Furnaces 1
PERMIT EXPIRES Wednesday, 10 April, 2024
Permit Issued on Friday, October 13, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: 1 l-". Date:
4PMED
OCT 2 d 2013
_N�
CITY of
Federal Warr
THIS CARD IS TO REAL -UN O\-SITE
Construction Inspection Record
INSPECTION REQUESTS: (2-53) 835-3050
Scheduled inspections ilia-: be failed if thus card is not on -site. DO NOT LOSE THIS C'_1RD_ Inspections are listed as close to segaenrial order as possible
(read left to rl?ht. top to bottom-. PIe3=e scbedt:le inspections as appropriate. Work inust not be co.ered until it is appro 2d. CZlccli with -,rouf uispector s
'ou are unsure about a1N of the i specrians or the inspection sequence. On -going inspecti-ons are logged on the back ofthis card.
ELECTRICAL
❑
By
LTFER Ground (4295)
Approved
Date
❑
By
Ditch cos*er (4030)
Approved
Date
❑
B�-
SlablConcrete Floor (4255)
Approved to place concrete
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Roush Electrical (4225)
❑
Ceiling Corer (4020)
Approved
Approved
approved
By
Date
By
Date
By
Date
®
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑
❑
❑
-Mechanical Rough -in (4165)
Gas Piping (4125)
Final - ]Iechanical (4065)
Approved
Approved to release test
pproved
Bc
Date
By
Date
By
PLUMBING
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
0
Final - Plumbing (4075)
Approved to corer
Approved
:approved
By
Date
BS•
Date
BI
Date