Loading...
23-105098Mechanical City of Dmederal Way Permit #:23-105098-00-ME Community Developent Dept. , 33325 8th Ave S Federal Way, WA 98003 i Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PALISADES AT DASH POINT UNIT 03-A Project Address: 31819 48TH CIR SW Parcel Number: 6613200390 Project Description: gas furnace replacement Owner Applicant Contractor DARLENE PHILLIPS TAYLER MANNINGPACIFIC HEATING & PACIFIC AIR SYSTEMS (GENERAL) 31819 48TH CIR SW UNIT 3-A COOLING PACIFAS093KA (9/8/25) FEDERAL WAY WA 98023 8607 DURANGO ST SW SUITE A 8607 DURANGO ST SW TACOMA WA 98499 TACOMA WA 98499 Additional Permit Information Mechanical Work Valuation? .................................. 8035 Is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures I Furnaces 1 PERMIT EXPIRES Wednesday, 10 April, 2024 Permit Issued on Friday, October 13, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 1 l-". Date: 4PMED OCT 2 d 2013 _N� CITY of Federal Warr THIS CARD IS TO REAL -UN O\-SITE Construction Inspection Record INSPECTION REQUESTS: (2-53) 835-3050 Scheduled inspections ilia-: be failed if thus card is not on -site. DO NOT LOSE THIS C'_1RD_ Inspections are listed as close to segaenrial order as possible (read left to rl?ht. top to bottom-. PIe3=e scbedt:le inspections as appropriate. Work inust not be co.ered until it is appro 2d. CZlccli with -,rouf uispector s 'ou are unsure about a1N of the i specrians or the inspection sequence. On -going inspecti-ons are logged on the back ofthis card. ELECTRICAL ❑ By LTFER Ground (4295) Approved Date ❑ By Ditch cos*er (4030) Approved Date ❑ B�- SlablConcrete Floor (4255) Approved to place concrete Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Roush Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved approved By Date By Date By Date ® Final - Electrical (4055) Approved By Date MECHANICAL ❑ ❑ ❑ -Mechanical Rough -in (4165) Gas Piping (4125) Final - ]Iechanical (4065) Approved Approved to release test pproved Bc Date By Date By PLUMBING Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to corer Approved :approved By Date BS• Date BI Date