22-103912City of Federal Way
Community Development DepC
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: PAVILION II SUITES A & B
Project Address: 31811 PACIFIC HWY S
Building -,Commercial
Permit #:22-103912-00-CO
Inspection Request Line: (253) 835-3050
Parcel Number: 082104 9126
Project Description: BLUEBEAM - tenant improvements of existing vacant space including demolition of interior
improvements, add new storefront, entry vestibule, doors, new canopy over entry; remove
existing tree. Add an interior electrical room. No plumbing included. Mechanical by
Separate Permit.
Owner
Applicant
Contractor
Lender
SCHNITZER PROPERTIES
THAVY CHEUNBENNER STANGE
DEACON CONSTRUCTION LLC
OWNER IS LENDER
1121 SW SALMON ST SUITE 500
ASSOCIATES ARCHITECTS, INC
8343 154TH AVE NE SUITE 210
PORTLAND OR 97205
80 SE MADISON ST SUITE 214
REDMOND WA 98052
PORTLAND OR 97214
Census Category: 437 - Commercial alt / add / conversion
Includes:
#1
#2
#3
#4
Occupancy Class:
Construction Type.
Occupancy Load:
Floor Area (sq. ft.)
0.00
Additional Permit Information
Mechanical to be Included? ..................................... No Plumbing Work Valuation? ................................... .. 0
Mechanical Work Valuation? .................................. 0 Number of Stories................................................... I
Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only? .............................. No
Plumbing to be Included? ........................................ No Comprehensive Plan Designation........................... City Center Frame
Zoning Designation ................................................. CC-F
No Fixtures Associated With This Permit II
PERMIT EXPIRES Sunday, 25 June, 2023
Permit Issued on Tuesday, December 27, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Wash' . n a t City of Federal Way
Owner or agent: I'; Date:
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 103912 00 Address: 31811 PACIFIC HWY S Suite A
Project: SCHNITZER PROPERTIES FEDERAL WAY WA 98003-5409
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Q Footings/Setback (4110) 0 Re -steel (4215) 0 Plumbing Groundwork (4190)
Approved to place concrete Approved to place concrete or grout Approved to cover
By Date By Date By Date
Q
Slab/Concrete Floor (4255)
Underfloor Framing (4285)
El
Floor Sheathing (4105)
Approved to place concrete
Approved to sheath floor
Approved to install flooring
By
Date
By
Date
By
Date
Rough Plumbing (4230)
Q Mechanical Rough -in (4165)
0 Gas Piping (4125)
Approved
Approved
Approved to release test
By Date
By Date
By A.J Date
1 o Fire/Draft Stops (4095)
Approved
By 140 Date L
Prior to scheduling a Framing inspection; 11 Framing (4120)
Electrical, Plumbing & Mechanical Rough -in Approved to insulate
and Fire/Draft Stop inspections must be signed -
off and approved. IBC 109.3.4 By Date
l 2
Insulation (4150)
1$
Gypsum Wallboard Nailing (4130)
14
Suspended Ceiling Grid (4265)
Approved to install wallboard
Approved to install mud & tape
Approved to drop tile
By
Date
By
Date
By
Date
15
Final - S K F & R (4060)
l
Final - Planning
1 f
Final - Mechanical (4065)
Approved
Approved
Approved
By
Date
By
Date
By
Date
18
Final - Plumbing (4075)
19
Final - Building (4050)
Approved
Approved
By
Date
By
Date
t l;,q - 6a - -r^v Ll �cAW"+.;- i n 'd tG, fog04
` jt jZ3 2,�3 10`0r R aC Cl-- +pf 'v►■�� vd�.�/; q) Z., ) '. i)vl - ? al '31-c-l" -- c17 Sri R 15 �c� �1 I �� A
❑
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date
CITY OF Building Division
33325 Eighth Avenue South
Federal Wa Federal Way, x 98003-6325
Phone 253-835-2607 Fax 253-35-609
CORRECTION NOTICE
ADDRESS: II PERMIT#:
IF YOU HAVE QUESTIONS CALL 3'c"kf(\m (253) 835- 12IC 2i7--
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD
FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
DA E INSPECTOR
DO NOT REMOVE THIS NOTICE
Page of
P157c- FA-t- /►v 1; &t-r ro$�
intk
Project Number: 0i4/--,-, '6
November 1, 2023
Schnitzer Steel
PO Box 10636
Portland, WA 97296
Attention: Chuck Morelli
RE: Permit No's — 22-103912-00-CO
Professional Service Industries, Inc.
3011 S Huson St. I Suite A I Tacoma, Washington 98409
Phone: (253) 589-1804
We have completed the requested special inspections on the subject project. All work requiring special
inspection was, to the best of this agency's knowledge, inspected and reported as specified on permit
documents.
Project Name: Pavilions
Project Address 31811 Pacific Hwy S, Federal Way WA
WORK INSPECTED
Placement of Reinforcing Steel
Placement of Reinforced Concrete
Testing of Reinforced Concrete
Soil Compaction Testing
Laboratory Testing of Soils
Structural Steel Welding
If there are any quesbons regarding this letter, please contact PSI at (253) 589-1804.
Respectfully submitted,
Professional Service Industries, Inc,
Alex Fish, L.G.
Branch Manager
www.intertek.com/building
nw,
73ENNER STANGE ASSOCIATES ARCHITECTS, INC.
The Waterman Building
80 SE Madison Street, Suite 214
Portland, Oregon 97214
■ T 503.670.0234 F 503.670.0235 E L-., bsaarch.corn.
No ver nber 13, 2023
City of Federal Way
33325 8a' South
Federal Way, WA 98003-6325
RE: Pavilion II Suites A Et B
31811 Suite A Et B Pacific Highway
Permit #22-103912-00
To Whom it May Concern:
I have been performing the Construction Administration for the Pavilions II Suites AEtB Shell
Improvements, Permit #22-103912-00 for the duration of construction. This scope has included
review of product submittals, shop drawings, coordinating with the structural engineer (including
their shop drawing review), review of RFI's, special inspection reports, teleconferences
throughout the project, as well as multiple site observation trips to review the project during
construction.
Based on my review of the submittals and shop drawings, and my observations in the field during
construction and at Substantial Completion, to the best of my knowledge, this project has been
constructed in conformance with the Permitted Construction Documents.
Sincerely,
Benner Stange Associates Architects, Inc.
8687
REGISTERED
A CHrrEC:T
C�-
Ti IONt F. FALLOftI
STATE OF WASHINGTON
Thomas F. Fallon, Architect
CC: Jeffrey A. Benner, Architect
Jay Fetherston, Schnitzer Properties
Lindy Goodling, Schnitzer Properties
Chuck Morelli, Deacon
Matt Durant, Deacon