Loading...
23-103327Plumbing City of Federal Way IPermit #:23-103327-00-PL Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 FILE Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-26 J9 Project Name: FISHER Project Address: 29341 13TH AVE S Parcel Number: 516200 0250 Project Description: like for like tub to shower replacement Owner Applicant Contractor ADAM FISHER QUTANA WILLIAMSJACUZZI BATH JACUZZI BATH REMODEL (PLUMBING) 29341 13TH AVE S • REMODELOF SEATTLE JACUZBR787P8(11/18/24 FEDERAL WAY WA 98003 8330 S 259TH ST 8330 S 259.TH ST USA KENT WA 98030 KENT WA 98030 Showers 2 PERMIT EXPIRES Wednesday, 27 December, 2023 Permit Issued on Friday, June 30, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ON tE f4i ❑f Federal Way. 9 Owner or agent: Date: F1'1NA,L.ED CITY w Federal Way THIS CARD IS TO RE %L-I\ ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 83i-30i0 Scheduled inspections may- be failed if this card is not on -site. DO NOT LOSE IMS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections ar the inspection sequence. On-eoina inspections are logged on the back of this card. ELECTRICAL ❑ By UFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date El By Slab/Concrete Floor (4255) Approved to place concrete Date 0 By Pool Bonding (4195) Approved Date ❑ By Temporary Power (4275) Approved Date ❑ By Senlce (4235) Approved Date ❑ By Feeders/Sub-panels (4045) Approved Date Q By Rough Electrical (4225) Approved Date ❑ By Ceiling Corer (4020) Approved Date E3 Final - Electrical (4055) Approved By Date MECHANICAL Q Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final -Mechanical (4065) Approved Approved to release test Approved By Date By Date Bti, Date PLUMBING 0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Appro% ed Approved By Date By �� Date 811.E 2A } By \ 1 � Date