Loading...
23-103200r City of Federal Way Community Development Dept, 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: WEST GREEN CONDOMINIUMS UNIT 0-8 Project Address: 32323 4TH PL S Building - Multi Family Permit #:23-103200-00-MF Inspection Request Line: (253) 835-3050 Parcel Number: 926660 1160 Project Description: BLUEBEAM - Removal of non -loading walls to make laundry smaller and enlarge kitchen space, demo existing walls, build and install new walls for new laundry room, includes plumbing and mechanical work. Owner Applicant Contractor Lender EKAETTE ESAH DAIANA SANCHEZTRUE TRUE QUALITY CONSTRUCTION OWNER IS LENDER 32323 4TH PL S UNIT 0-8 QUALITY CONSTRUCTION LLC LLC 4811 S 292ND ST 4811 S 292ND ST FEDERAL WAY WA 98003 AUBURN WA 98001 AUBURN WA 98001 Census Category: 434 - Residential alt/add - no change in number of units Includes: # 1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) 0.00 Additional Permit Information Mechanical to be Included? ..................................... Yes Mechanical Work Valuation? .................................. 350 Is this an Online or O.T.C. application? .................. No Plumbing to be Included? ........................................ Yes Zoning Designation ................................................. RM 1800 Total Valuation: 10,000.00 Plumbing Work Valuation? ..................................... 1000 Number of Stories ................................................... I Permit for Building Shell Only? .............................. No Comprehensive Plan Designation ........................... Multifamily CONDITIONS: FIRE APPROVAL CONDITIONS: 1. Demolition and construction shall conform to the requirements of International Fire Code (IFC) Chapter 33. 2. Fire Inspection is Not Reuuired. PERMIT EXPIRES Tuesday, 16 January, 2024 Permit Issued on Thursday, July 20, 2023 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: EINA L L—; U Date 2ef �vk- al IL1 /2-15 CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 23 103200 00 Address: 32323 4TH PL S Unit 0-08 Project: EKAETTE EMMANUEL ESAH FEDERAL WAY WA 98003-5805 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ® Footings/Setback (4110) Foundation Wall (4115) 0 Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfill By Date By Date By Date ® Re -steel (4215) 5❑ Plumbing Groundwork (4190) © Slab/Concrete Floor (4255) Approved to place concrete or grout Approved to cover Approved to place concrete By Date By Date By Date Underfloor Framing (4285) ® Floor Sheathing (4105) ® Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date 3 o Roof Sheathing (4220) 1 Rough Plumbing (4230) Approved to install roofing Approved By Date By Date INV'. EJ Fire/Draft Stops (4095) E 3 Gas Piping (4125) Approved to release test Approved By Date By &J Date 12 Mechanical Rougb-in (4165) Approved By Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed- offand approved. IBC 109.3.4 175 Framing (4120) s Insulation (4150) 17 Gypsum Wallboard Nailing (4130) Approved to insulate Approved to install wallboard Approved to install mud & tape J Date By Date By Date y By Es Suspended Ceiling Grid (4265) 8 Final - S K F & R (4060) Final - Mechanical (4065) Approved to drop tile Approved Approved By Date By Date By Date 2�1 Final - Plumbing (4075) Approved By Date 22 Final - Building (4050) Approved By V Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date <tahA CITY OF 1 . Building Division 33325 Eighth Avenue South Federal Way, WA 98003-6325 Federal Way Phone 253-835-2607 Fax 253-835-2609 CORRECTION NOTICE ADDRESS: _ a �f r _ PERMIT#: 7 ­57-` IF YOU HAVE QUESTIONS CALL3-�feVAA (253) 835- ?6Z T WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835- 50 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO.BE MADE WITHIN 15 DAYS. 1 L� DATE DO NOT REMOVE TH INSPECTOR NOTICE Page of